1 "http://www.legion.org"
2 A. Mualem, "Utilization, Predictability, Workloads and User Run time Estimates in Scheduling the IBM SP2 with Backfilling" 12 (12): 529-543, 2001
3 D. G. Feitelson, "Theory and Practice in Parallel Job Schedulin" 1291 : 1-34, 1997
4 B. Bode, "The Portable Batch Scheduler and the MauiScheduler on Linux Clusters" 2000
5 D. Talby, "Supporting Priorities and Improving Utilization of the IBM SP2 Scheduler Using Slack-based Backfilling" 513-517, 1999
6 W. A. Ward Jr, "Scheduling Jobs on Parallel Systems Using a Relaxed Backfill Strategy" 88-102, 2002
7 B. Lawson, "Multiple-queue Backfilling Scheduling with Priorities and Reservations for Parallel Systems" 72-87, 2002
8 D. Feitelson, "Logs of Real Parallel Workloads from Production Systems"
9 D. Zotkin, "Job-Length Estimation and Performance in Backfilling Schedulers" 1999
10 H. Shan, "Job Superscheduler Architecture and Performance in Computational Grid Environments" 2003
1 "http://www.legion.org"
2 A. Mualem, "Utilization, Predictability, Workloads and User Run time Estimates in Scheduling the IBM SP2 with Backfilling" 12 (12): 529-543, 2001
3 D. G. Feitelson, "Theory and Practice in Parallel Job Schedulin" 1291 : 1-34, 1997
4 B. Bode, "The Portable Batch Scheduler and the MauiScheduler on Linux Clusters" 2000
5 D. Talby, "Supporting Priorities and Improving Utilization of the IBM SP2 Scheduler Using Slack-based Backfilling" 513-517, 1999
6 W. A. Ward Jr, "Scheduling Jobs on Parallel Systems Using a Relaxed Backfill Strategy" 88-102, 2002
7 B. Lawson, "Multiple-queue Backfilling Scheduling with Priorities and Reservations for Parallel Systems" 72-87, 2002
8 D. Feitelson, "Logs of Real Parallel Workloads from Production Systems"
9 D. Zotkin, "Job-Length Estimation and Performance in Backfilling Schedulers" 1999
10 H. Shan, "Job Superscheduler Architecture and Performance in Computational Grid Environments" 2003
11 K. Li, "Job Scheduling for Grid Computing on Metacomputers" 2005
12 D. G. Feitelson, "Improved Utilization and Responsiveness with Gang Scheduling" 1291 : 238-261, 1997
13 O. H. Ibarra,et al, "Heuristic Algorithm for Scheduling Independent Tasks on Nonidentical Processors" 24 no. 2 : 280-289, apr.1977.
14 I. Foster, "Grid Services for Distributed System Integration" 35 (35): 37-46, 2002
15 I. Foster, "Globus: A Metacomputing Infrastructure Toolkit" 11 (11): 115-128, 1997
16 V. Hamscher, "Evaluation of Job-Scheduling Strategies for Grid Computing" 1971 : 191-202, 2000
17 V. Subramani, "Distributed Job Scheduling on Computational Grids Using Multiple Simultaneous Requests" 359-368, 2002
18 Q. Wang, "De-centralized Job Scheduling on Computational Grids Using Distributed Backfilling" 3251 : 285-292, 2004
19 S. Srinivasan, "Characterization of Backfilling Strategies for Parallel Jobs Scheduling" 514-522, 2002
20 K. Krauter, "A Taxonomy and Survey of Grid Resource Management Systems for Distributed Computing" 32 (32): 135-164, 2002
21 R. McCann,et al, "A Dynamic Processor Allocation Policy for Multiprogrammed Sharedmemory Multiprocessors" 11 no. 2 : 146-178, 1993.05