      건설공사의 재시공 현황에 대한 원인분석 및 개선안에 관한 연구  :  공동주택의 공조공사를 중심으로 한 조사 및 사례연구 = A Study on the Cause Analysis and Improvements of Reconstruction on Domestic Apartment Construction

      한글로보기

      https://www.riss.kr/link?id=A3003206

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      This study aims to provide some efficient and effective ways to prevent reconstruction. For this study, the analysis on the current situation and various causes of reconstruction has been performed by using questionnaire survey and case studies from construction sites. The results of this study are as follows:
      1.Causes of reconstruction occurrence through case studies show construction inability including technician' idleness(42.2%), misunderstanding of specification(26.7%) and imperfect specification(15.6%).
      2.Influence of reconstruction on construction productivity is analysed as the following; increase of 3.8% in construction duration, increase of 5.7% in construction cost, and decrease of 4.4% in construction quality.
      3.In order to prevent reconstruction, it is required to file and analyse reconstruction data, systemize construction management, train construction worders with systematic work procedural manual, and check design documents precisely.
      4.Also it is necessary to develop new construction technology such as simplification, mechanization, dry-construction of work process.
      번역하기

      This study aims to provide some efficient and effective ways to prevent reconstruction. For this study, the analysis on the current situation and various causes of reconstruction has been performed by using questionnaire survey and case studies from c...

      This study aims to provide some efficient and effective ways to prevent reconstruction. For this study, the analysis on the current situation and various causes of reconstruction has been performed by using questionnaire survey and case studies from construction sites. The results of this study are as follows:
      1.Causes of reconstruction occurrence through case studies show construction inability including technician' idleness(42.2%), misunderstanding of specification(26.7%) and imperfect specification(15.6%).
      2.Influence of reconstruction on construction productivity is analysed as the following; increase of 3.8% in construction duration, increase of 5.7% in construction cost, and decrease of 4.4% in construction quality.
      3.In order to prevent reconstruction, it is required to file and analyse reconstruction data, systemize construction management, train construction worders with systematic work procedural manual, and check design documents precisely.
      4.Also it is necessary to develop new construction technology such as simplification, mechanization, dry-construction of work process.

      더보기

      목차 (Table of Contents)

      • 1.서론
      • 1.1 연구의 배경 및 목적
      • 1.2 연구의 절차 및 방법
      • 2.건설현장의 재시공에 관한 설문조사 및 사례조사
      • 2.1 건설현장의 재시공에 관한 설문조사
      • 1.서론
      • 1.1 연구의 배경 및 목적
      • 1.2 연구의 절차 및 방법
      • 2.건설현장의 재시공에 관한 설문조사 및 사례조사
      • 2.1 건설현장의 재시공에 관한 설문조사
      • 2.2 5개 건설 현장 사례조사
      • 3.재시공 방지를 위한 개선안
      • 3.1 관리적 측면
      • 3.2 교육적 측면
      • 4.결론 및 향후 연구과제
      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼