RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      저압계통 연계력을 고려한 지상변압기 용량증가에 따른 이용률 분석에 관한 연구

      한글로보기

      https://www.riss.kr/link?id=A107842328

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Underground power system has been mostly configured in a type of transformers connected to branch lines. However, Configuration type of transformer connected to main line with open or looped low voltage(LV) network is now being applied to underground system to improve operating complexity and customer’s reliability. In this paper, when a transformer connection type is changed and already installed transformers are used, utilization factors of the transformers are analyzed. We divided 13 sections and two capacities of transformers. If there is a fault at 1 transformer, it is analyzed how the other’s utilization factor can be changed using monte carlo simulation. Futhermore, the growth of load is applied to analyze the utilization factors of transformers. thus, the trends of utilization factors are presented according to years.
      번역하기

      Underground power system has been mostly configured in a type of transformers connected to branch lines. However, Configuration type of transformer connected to main line with open or looped low voltage(LV) network is now being applied to underground ...

      Underground power system has been mostly configured in a type of transformers connected to branch lines. However, Configuration type of transformer connected to main line with open or looped low voltage(LV) network is now being applied to underground system to improve operating complexity and customer’s reliability. In this paper, when a transformer connection type is changed and already installed transformers are used, utilization factors of the transformers are analyzed. We divided 13 sections and two capacities of transformers. If there is a fault at 1 transformer, it is analyzed how the other’s utilization factor can be changed using monte carlo simulation. Futhermore, the growth of load is applied to analyze the utilization factors of transformers. thus, the trends of utilization factors are presented according to years.

      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼