RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      BIM기반의 건축 수량산출정보 구축에 관한 연구 = A Study on Architectural Quantity take-off Based on BIM

      한글로보기

      https://www.riss.kr/link?id=A108880511

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      BIM is an opportunity to implement construction IT. BIM has brought two changes. One is the change of geometric Information. It is the transition from 2D CAD to 3D model. The other is property changes. Requires conversion from data to information. This is a confergence of geometric information and attribute information, and BIM requires convergence in the construction work process. This study aims to present a method for activating BIM in Project management. The first task after the design is quantity take-off. The QTO is a process of converting the geometric information (Analog) into the attribute information (Digital). This QTO-database is important information that can be based on Project management. Therefore, it is necessary to construct information that is useful from QTO. It is WBS-CBS integrated information. BIM-based QTO refers to linkage between 3D model object and WBS-CBS. Through this study, we show the method of WBS-CBS integrated information based on BIM and show the applicability of BIM through actual case. This study is expected to be a basis for the successful implementation of BIM-based project management.
      번역하기

      BIM is an opportunity to implement construction IT. BIM has brought two changes. One is the change of geometric Information. It is the transition from 2D CAD to 3D model. The other is property changes. Requires conversion from data to information. Thi...

      BIM is an opportunity to implement construction IT. BIM has brought two changes. One is the change of geometric Information. It is the transition from 2D CAD to 3D model. The other is property changes. Requires conversion from data to information. This is a confergence of geometric information and attribute information, and BIM requires convergence in the construction work process. This study aims to present a method for activating BIM in Project management. The first task after the design is quantity take-off. The QTO is a process of converting the geometric information (Analog) into the attribute information (Digital). This QTO-database is important information that can be based on Project management. Therefore, it is necessary to construct information that is useful from QTO. It is WBS-CBS integrated information. BIM-based QTO refers to linkage between 3D model object and WBS-CBS. Through this study, we show the method of WBS-CBS integrated information based on BIM and show the applicability of BIM through actual case. This study is expected to be a basis for the successful implementation of BIM-based project management.

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼