      Development of a Computerized Risk Management System for International NPP EPC Projects

      한글로보기

      https://www.riss.kr/link?id=A103548822

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Over the past decade, Nuclear Power Plant (NPP) projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the target completion time and cost. NPP projects have frequently exceeded the planned time and cos...

      Over the past decade, Nuclear Power Plant (NPP) projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the target completion time and cost. NPP projects have frequently exceeded the planned time and cost despite reliable estimates at the start of the project. This was attributed to unpredictable causes at the beginning and to shortage of proper tools to quantitatively analyze the inevitable uncertainties. To overcome these difficulties, computerized systems have been widely proposed in the construction industry as effective aids to proactively control the potential risks and to monitor continuously their status and variation. However, there are few risk management systems focused on NPP projects. In this study, we developed a computer-based risk management system for NPP projects, called Nuclear Risk Management System (NuRMS), which is helpful for furnishing project managers with warning signals as a project is progressing and for tracking the changes in risk variation at a desired confidence level. In developing the NuRMS, the Risk Breakdown Structure (RBS), the weights for risk categorization, computation of the Total Risk Score (TRS), and integration of risk analysis tools with relation-based and cost-loaded activity schedule were core tasks. To demonstrate the efficiency of the developed NuRMS, the system was operated using risk information derived from constructing the auxiliary buildings of Shin-Kori units 3 and 4 located in Korea, as an illustrative case. The results showed the system’s capacities and suggested that it may be applied to a real NPP engineering, procurement, and construction project. The developed NuRMS is expected to assist a project manager in monitoring, tracking, and controlling potential impacts of risk events during the overall implementation of NPP projects.

      더보기

      참고문헌 (Reference)

      1 Louis Anthony TonyCox, "What's Wrong with Risk Matrices?" Wiley-Blackwell 28 (28): 497-512, 2008

      2 Du, Y., "Update on the cost of nuclear power" Center for Energy and Environmental Policy Research, MIT 2009

      3 Ofer Zwikael, "The Effectiveness of Risk Management: An Analysis of Project Risk Planning Across Industries and Countries" Wiley-Blackwell 31 (31): 25-37, 2011

      4 Gene Rowe, "The Delphi technique: Past, present, and future prospects — Introduction to the special issue" Elsevier BV 78 (78): 1487-1490, 2011

      5 Jamal F. Al‐Bahar, "Systematic Risk Management Approach for Construction Projects" American Society of Civil Engineers (ASCE) 116 (116): 533-546, 1990

      6 Richard J. Rohrer, "Simple method for risk assessment of nuclear power plant refueling outages" Elsevier BV 167 (167): 193-201, 1996

      7 Tzvi Raz, "Risk management, project success, and technological uncertainty" Wiley-Blackwell 32 (32): 101-109, 2002

      8 He Zhi, "Risk management for overseas construction projects" Elsevier BV 13 (13): 231-237, 1995

      9 Bu-Qammaz, A. S., "Risk assessment of international construction projects using the analytic network process" Middle East Technical University 2007

      10 AmirReza KarimiAzari, "Risk assessment model selection in construction industry" Elsevier BV 38 (38): 9105-9111, 2011

      1 Louis Anthony TonyCox, "What's Wrong with Risk Matrices?" Wiley-Blackwell 28 (28): 497-512, 2008

      2 Du, Y., "Update on the cost of nuclear power" Center for Energy and Environmental Policy Research, MIT 2009

      3 Ofer Zwikael, "The Effectiveness of Risk Management: An Analysis of Project Risk Planning Across Industries and Countries" Wiley-Blackwell 31 (31): 25-37, 2011

      4 Gene Rowe, "The Delphi technique: Past, present, and future prospects — Introduction to the special issue" Elsevier BV 78 (78): 1487-1490, 2011

      5 Jamal F. Al‐Bahar, "Systematic Risk Management Approach for Construction Projects" American Society of Civil Engineers (ASCE) 116 (116): 533-546, 1990

      6 Richard J. Rohrer, "Simple method for risk assessment of nuclear power plant refueling outages" Elsevier BV 167 (167): 193-201, 1996

      7 Tzvi Raz, "Risk management, project success, and technological uncertainty" Wiley-Blackwell 32 (32): 101-109, 2002

      8 He Zhi, "Risk management for overseas construction projects" Elsevier BV 13 (13): 231-237, 1995

      9 Bu-Qammaz, A. S., "Risk assessment of international construction projects using the analytic network process" Middle East Technical University 2007

      10 AmirReza KarimiAzari, "Risk assessment model selection in construction industry" Elsevier BV 38 (38): 9105-9111, 2011

      11 Paul Slovic, "Risk as Analysis and Risk as Feelings: Some Thoughts about Affect, Reason, Risk, and Rationality" Wiley-Blackwell 24 (24): 311-322, 2004

      12 Marco, A. D., "RISK ANALYSIS IN CONSTRUCTION PROJECTS: A PRACTICAL SELECTION METHODOLOGY" Science Publications 11 (11): 74-84, 2014

      13 L.M. Meade, "R&D project selection using the analytic network process" Institute of Electrical and Electronics Engineers (IEEE) 49 (49): 59-66, 2002

      14 Hallowell, M. R., "Qualitative research: Application of the delphi method to CEM research" 136 (136): 99-107, 2010

      15 Nitin R Joglekar, "Product development resource allocation with foresight" Elsevier BV 160 (160): 72-87, 2005

      16 PMI, "Practice standard for project risk management" Project Management Institute 2009

      17 David B. Ashley, "Political Risks in International Construction" American Society of Civil Engineers (ASCE) 113 (113): 447-467, 1987

      18 Daniel Baloi, "Modelling global risk factors affecting construction cost performance" Elsevier BV 21 (21): 261-269, 2003

      19 Paul Elkington, "Managing project risks: a case study from the utilities sector" Elsevier BV 20 (20): 49-57, 2002

      20 Shufeng Wang, "Managing construction risks of AP1000 nuclear power plants in China" Springer Nature 20 (20): 43-69, 2011

      21 STUK, "Management of safety requirements in subcontracting during the Olkiluoto 3 nuclear power plant construction phase" Nuclear Reactor Regulation 2006

      22 Xuhong He, "Maintenance risk management in Daya Bay nuclear power plant: PSA model, tools and applications" Elsevier BV 49 (49): 103-112, 2007

      23 I. Dikmen, "Learning from risks: A tool for post-project risk assessment" Elsevier BV 18 (18): 42-50, 2008

      24 Jung, Y. S., "Knowledge-based standard progress measurement for integrated cost and schedule performance control" 133 (133): 10-21, 2007

      25 Walewski, J., "International project risk assessment: Methods, procedures, and critical factors, A Report of the Center for Construction Industry Studies" University of Texas 2003

      26 Alfredo del Caño, "Integrated Methodology for Project Risk Management" American Society of Civil Engineers (ASCE) 128 (128): 473-485, 2002

      27 E.W.T. Ngai, "Fuzzy decision support system for risk analysis in e-commerce development" Elsevier BV 40 (40): 235-255, 2005

      28 Hashem Al-Tabtabai, "Expert judgment in forecasting construction project completion" Emerald 4 (4): 271-293, 1997

      29 J.S. Wu, "Experience with probabilistic risk assessment in the nuclear power industry" Elsevier BV 29 (29): 313-345, 1992

      30 Stephen M. Hess, "Development of a dynamical systems model of plant programmatic performance on nuclear power plant safety risk" Elsevier BV 90 (90): 62-74, 2005

      31 Saaty, T. L., "Decision making with dependence and feedback: the analytic network process" RWS Publications 1996

      32 Chan, E. H. W., "Cultural considerations in international construction contracts" 129 (129): 375-381, 2003

      33 Eddie W. L. Cheng, "Contractor selection using the analytic network process" Informa UK Limited 22 (22): 1021-1032, 2004

      34 Sabah Alkass, "Construction delay analysis techniques" Informa UK Limited 14 (14): 375-394, 1996

      35 Sadi A. Assaf, "Causes of delay in large construction projects" Elsevier BV 24 (24): 349-357, 2006

      36 Seung H. Han, "Causes of Bad Profit in Overseas Construction Projects" American Society of Civil Engineers (ASCE) 133 (133): 932-943, 2007

      37 Hans Petter Krane, "Categorizing risks in seven large projects-Which risks do the projects focus on?" Wiley-Blackwell 2010

      38 Albert P. C. Chan, "Application of Delphi method in selection of procurement systems for construction projects" Informa UK Limited 19 (19): 699-718, 2001

      39 L. M. Meade, "Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach" Informa UK Limited 37 (37): 241-261, 2010

      40 Shu-Hsing Chung, "Analytic network process (ANP) approach for product mix planning in semiconductor fabricator" Elsevier BV 96 (96): 15-36, 2005

      41 Eddie W. L. Cheng, "Analytic Network Process Applied to Project Selection" American Society of Civil Engineers (ASCE) 131 (131): 459-466, 2005

      42 Stephen M. Hess, "Analysis and insights from a dynamical model of nuclear plant safety risk" Elsevier BV 92 (92): 15-29, 2007

      43 G. Petrangeli, "An approach to risk management for the next Italian nuclear power plants and reflections on applicability to other industrial activities" Elsevier BV 10 (10): 501-506, 1984

      44 H. Ping Tserng, "A study of ontology-based risk management framework of construction projects through project life cycle" Elsevier BV 18 (18): 994-1008, 2009

      45 Fiona D Patterson, "A Risk Register Database System to aid the management of project risk" Elsevier BV 20 (20): 365-374, 2002

      46 Andreas Klinke, "A New Approach to Risk Evaluation and Management: Risk-Based, Precaution-Based, and Discourse-Based Strategies 1" Wiley-Blackwell 22 (22): 1071-1094, 2002

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2023 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2020-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2008-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2005-05-27 학술지명변경 한글명 : 대한토목학회 영문논문집 -> KSCE Journal of Civil Engineering KCI등재
      2005-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2004-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2002-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.59 0.12 0.49
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.42 0.39 0.286 0.06
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼