the Rebuilding Project Consulting System has been introduced for the first time in the Urban and Residential Environment Improvement Act, which came into effect July 1st, 2003, to improve the problems happening in the implementation process of the reb...
the Rebuilding Project Consulting System has been introduced for the first time in the Urban and Residential Environment Improvement Act, which came into effect July 1st, 2003, to improve the problems happening in the implementation process of the rebuilding projects as the conflicts among the residents were deepening and the projects were drawn out due to the cozy relations between the association and the constructer, the lack of transparency. This dissertation focused on the discovering and analysis of the problems and contradictions in the system itself positively, which occurred in the implementation process of rebuilding project consulting system in the past, and presenting the necessity and making a case for the rebuilding project consulting system by put forwarding the alternative plans in the concrete. Futhermore, it focused on presenting the system improvement schemes to activate the rebuilding project consulting system. As the result of the survey and analysis of the actual operation state of the rebuilding project consulting system through the media research and the questionnaire survey, the specialty of the professional consultants and the initial financing raised their head as the core point of contention.
At first, in case of the specialty of professional consultants, the 90.5% of respondents agreed with the existence of the professional consultants, and the 62.4% of them agreed on the role of the professional consultants to supplement the non-specialty of associations, and the 35.5% of total respondents replied that there was a problem in the specialty of rebuilding businesses. And the specialty of professional consultants was indicated as the pending question, as the proportion of respondents who were unsatisfied was 52%(35.5% of the unsatisfied and 16.5% of the greatly unsatisfied) appeared triple times as high as the proportion of the respondents who were satisfied was 15.0%(12.5% of the satisfied and 2.5% of the greatly satisfied). Accordingly, the proposals for the specialty reinforcement of the professional consultants are proposed as follows. It is expected to solve the pending problems through.
Firstly, the improvement of the technological manpower standard for the professional consultants of rebuilding projects,
Secondly, the designation of educational institutions and the introduction of national qualification examination system,
Thirdly, establishment of agent service charge calculation standard and opening to the special field works,
Fourthly, setting up the efficient and continuous registration system for the professional consultants of rebuilding project, and introduction of the bid direction and the business results public notice system.
In case of initial financing, the 90.5% of the respondents replied that the professional consultants of rebuilding project were necessary, and the 33.1% of them agreed on the role of the professional consultants of rebuilding project for the operating expense supply of the associations. Though the 78.9% of the respondents appeared to supply the initial fund from professional consultants of rebuilding project, the 63.5% of the total respondents appeared to have experienced the hardship or to be experiencing the hardship in the process of the initial fund supply. It was investigated that 49.0% of the respondents attributed the reason to small-scale of the professional consultants of rebuilding project and the 35% of the respondents attributed the reason to the selection timing of constructors. On the other hand, the initial fund supply by the promotion committee or the association raised its head as the pending task as the 54.5% of the total respondents replied that the most desirable way to supply the initial fund was through the professional consultants of rebuilding project, and the 62.5% of the total respondents replied that the capital standard for the professional consultants of rebuilding project should be intensified to secure the stable supply of initial fund. So, the counterproposal for the initial fund supply by the promotion committee or the association is proposed as follows.
It is expected to solve the pending problems through;
Firstly, setting up the systematic device that induces the initial fund bearing by the association members who are the operators of the project,
Secondly, the improvement of capital standard of the professional consultants of rebuilding project,
Thirdly, the readjustment of the constructor selection timing,
Fourthly, expanding the utilization of the urban and residential environment improvement funds,
Fifthly, establishment of the liquidation regulations for the professional consultants of rebuilding project who were connected to the unlawful affairs.
It is true that the Rebuilding Project Consulting System, which is entering into the sixth year after coming into operation, has the positive phases, contributing to secure the legal position of the professional consulting business of rebuilding project and improve the service level in the business community. Nevertheless, the professional consultants of rebuilding project must not overlook the fact that, as indicated in this dissertation, the 9.5% of the total respondents replied that the professional consultants of rebuilding project are useless, putting forward the reasons, such as the involvement in various interests(31.5%), doing not much(26.3%), lack of specialty (26.3%), shortage of capability to supply funds(15.8%).
Therefore, the professional consultants of rebuilding project must keep in mind that the shortage of specialty and the shortage of capability to supply initial funds may result in the deterioration of service quality functioning as a serious trouble in the rebuilding projects, and depreciating the dignity and prestige of the professional consultants of rebuilding project as well as providing the cause of conflict between the business entities bringing about the various problems like intervention in the interests.
Finally, like the Korean proverb, "Nothing is complete until you put in final shape", if there is no specialized manpower which is able to make use of the system , and there is no minimum capital to operate the system, though the systematic foundation is provided, the system may not be activated and the successful rebuilding projects may not be expected to be carried out.