RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    열선 매입과 열선 및 버블시트 조합의 개량형 버블시트를 포설한 슬래브 콘크리트의 온도이력 특성 = Temperature History of the Slab Concrete applying Revised Bubble Sheet with Heating Cable

    한글로보기

    https://www.riss.kr/link?id=A109248964

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    In this study, the results are compared with the case of the concrete with embedded heating wire to verify the performance of the IB made in order to improve the workability and affordability, and to determine the effectiveness of early frost damage prevention. The IB was made using the 5W heating wire and layed on the upper surface of the concrete. The temperature was reduced to below 0℃ approximately within 24 hours, then approached the external temperature thereafter. On the other hand, when the 20W heating wire was used to make the IB and applied the same way, the temperature remained around -2 to 3℃ on the average even through the temperature was reduced to below 0℃, due to the heating wire with relatively large heating capacity. It appeared to reach 85% of the direct heating by embedding the heating wire relatively deeper in the concrete. However, it was determined that using the IB made with the 20W heating wire will prevent the early frost damage to some degree in .10℃
    번역하기

    In this study, the results are compared with the case of the concrete with embedded heating wire to verify the performance of the IB made in order to improve the workability and affordability, and to determine the effectiveness of early frost damage p...

    In this study, the results are compared with the case of the concrete with embedded heating wire to verify the performance of the IB made in order to improve the workability and affordability, and to determine the effectiveness of early frost damage prevention. The IB was made using the 5W heating wire and layed on the upper surface of the concrete. The temperature was reduced to below 0℃ approximately within 24 hours, then approached the external temperature thereafter. On the other hand, when the 20W heating wire was used to make the IB and applied the same way, the temperature remained around -2 to 3℃ on the average even through the temperature was reduced to below 0℃, due to the heating wire with relatively large heating capacity. It appeared to reach 85% of the direct heating by embedding the heating wire relatively deeper in the concrete. However, it was determined that using the IB made with the 20W heating wire will prevent the early frost damage to some degree in .10℃

    더보기

    동일학술지(권/호) 다른 논문

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼