RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    자연취락지구 기반시설의 가치 분석 : 청주시 지구단위계획에 의한 사업 중심으로 = Analysis on Value of Infrastructure at Rural Settlement Zone - Focused on Village Plans in Cheongju City, Korea

    한글로보기

    https://www.riss.kr/link?id=T13174207

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    The purpose of this study is to measure the consumption costs and benefits when conducting environmental enhancement projects based on the resident participative district planning established on urban settled villages. The spatial range of the study included Geomdoonggol, Jooseong, Shinmokgol and Hyeonam, and the secondary influence areas were expanded and set under the decision that the aftermath due to the district planning would influence the surrounding areas by performing an expert survey. The analysis period was set to 35 years referring to the 「Modification and Supplementation Research of Basic Guidelines for Performing Preliminary Feasibility Study」of Korea Development Institute. Prior to analyzing the costs and benefits, the costs and benefits items were derived by referring to the report of 「2010 District-Unit Plan for Cheongjoo City Rural Settlement Zone」and advanced studies, in order to measure the consumption cost and the generated benefits of the project. In this study, CVM was used as the benefits were non-market valuation and WTP of the concerned residents was estimated using the Logit Model after estimating the function through the logistic regression. The derived WPT secured its reliability through a non-parametric approach.
    As the result, firstly, construction cost, subsidiary cost, spare cost and land acquisition cost were generated on each district for the project cost, and converting by each district - it was predicted to be 3,724 M Won for Geondoonggol , 5,491 M Won for Jooseong, 879 M Won for Shinmokgol and 5,467 M Won for Hyeonam. WTP of the concerned district derived through CVM for the primary influence area was estimated to be 5,233 Won for roads, 2,826 Won for parking lots and 3,705 Won for parks, and the secondary influence area was estimated to be 4,910 Won for roads, 2,242 Won for parking lots and 3,620 Won for parks. To secure the reliability of WTP and calculated the non-parametric WTP with 95% reliability interval, other projects excluding the parking lot of the secondary influence area were included within the reliability interval. Measuring the benefits based on this result, 11,764 Won per month per household for Geondoonggol, Jooseong and Hyeonam and 5,233 Won for Shinmokgol. For the secondary influence areas, 10,772 Won per month per household for Geondoonggol, Jooseong and Hyeonam, and 4,910 Won for Shinmokgol. Calculating the total yearly benefits by adding the primary and secondary influence areas by each district, 64,376,472Won for Geomdoonggol, 35,078,016 for Jooseong, 26,884,560 Won for Shinmokgol and 22,252,032 Won for Hyeonam were showed to be generated. Secondly, by performing NPV and B/C Ratio through the cost generated during the set period and the discounted value of the benefits, they were calculated to be -2,594 M Won of NPV with 0.22 B/C Ratio for Geomdoonggol, -4,662 M Won NPV with 0.08 B/C Ratio for Jooseong, -472 M Won NPV with 0.4 B/C Ratio for Shinmokgol and -4,662 M Won NPV with 0.05 B/C Ratio for Hyeonam. Thirdly, B/C Ratio became inverse-proportionally low when 3%, 4% downward and 7%, 9% upward discount rates were applied as the parameters, and NPV showed closed to a negative(-) value for Geomdoonggol and Shinmokgol districts and a positive(+) value for Jooseong and Hyeonam.
    Looking at the individual WTP results in this study, the WTP on ‘New construction and facility of roads was estimated the highest. This implies that road projects are the most required project for the concerned residents. On the other hand, the WTP for parks and parking lots came out to be relatively low, and this seems to be due to the fact not-high income level of the concerned residents was indirectly reflected through the study or of low awareness of the significance relative to road projects. Also, by looking at the CBA results, both the NPV and B/C ratio showed very poor results in terms of economic efficiency, and this implies the fact that infrastructure should be provided in terms of welfare projects and not economic efficiency for policy decisions.
    As the conclusion of this study, it is very significant in terms of the fact that costs and benefits of the infrastructures provided through district planning at urban settled villages were estimated prior to performing the project. However, the point it has been represented with the project benefits by deriving WTP in the form of maintenance fund could be impractical at this time point where there are numerous varieties of benefits depending on the project and no resident has experienced the effect. Furthermore, there was a limit on the fact that an identical WTP had been derived and reflected to all 4 districts as no sufficient samples were secured due to limited number of households for each district although WTP should have been derived depending on the characteristics of the district planning by the districts. In the future, sufficient number of samples should be secured when predicting the benefits of a district planning, and researches which WTP with appropriately reflected district characteristics should be derived.
    번역하기

    The purpose of this study is to measure the consumption costs and benefits when conducting environmental enhancement projects based on the resident participative district planning established on urban settled villages. The spatial range of the study i...

    The purpose of this study is to measure the consumption costs and benefits when conducting environmental enhancement projects based on the resident participative district planning established on urban settled villages. The spatial range of the study included Geomdoonggol, Jooseong, Shinmokgol and Hyeonam, and the secondary influence areas were expanded and set under the decision that the aftermath due to the district planning would influence the surrounding areas by performing an expert survey. The analysis period was set to 35 years referring to the 「Modification and Supplementation Research of Basic Guidelines for Performing Preliminary Feasibility Study」of Korea Development Institute. Prior to analyzing the costs and benefits, the costs and benefits items were derived by referring to the report of 「2010 District-Unit Plan for Cheongjoo City Rural Settlement Zone」and advanced studies, in order to measure the consumption cost and the generated benefits of the project. In this study, CVM was used as the benefits were non-market valuation and WTP of the concerned residents was estimated using the Logit Model after estimating the function through the logistic regression. The derived WPT secured its reliability through a non-parametric approach.
    As the result, firstly, construction cost, subsidiary cost, spare cost and land acquisition cost were generated on each district for the project cost, and converting by each district - it was predicted to be 3,724 M Won for Geondoonggol , 5,491 M Won for Jooseong, 879 M Won for Shinmokgol and 5,467 M Won for Hyeonam. WTP of the concerned district derived through CVM for the primary influence area was estimated to be 5,233 Won for roads, 2,826 Won for parking lots and 3,705 Won for parks, and the secondary influence area was estimated to be 4,910 Won for roads, 2,242 Won for parking lots and 3,620 Won for parks. To secure the reliability of WTP and calculated the non-parametric WTP with 95% reliability interval, other projects excluding the parking lot of the secondary influence area were included within the reliability interval. Measuring the benefits based on this result, 11,764 Won per month per household for Geondoonggol, Jooseong and Hyeonam and 5,233 Won for Shinmokgol. For the secondary influence areas, 10,772 Won per month per household for Geondoonggol, Jooseong and Hyeonam, and 4,910 Won for Shinmokgol. Calculating the total yearly benefits by adding the primary and secondary influence areas by each district, 64,376,472Won for Geomdoonggol, 35,078,016 for Jooseong, 26,884,560 Won for Shinmokgol and 22,252,032 Won for Hyeonam were showed to be generated. Secondly, by performing NPV and B/C Ratio through the cost generated during the set period and the discounted value of the benefits, they were calculated to be -2,594 M Won of NPV with 0.22 B/C Ratio for Geomdoonggol, -4,662 M Won NPV with 0.08 B/C Ratio for Jooseong, -472 M Won NPV with 0.4 B/C Ratio for Shinmokgol and -4,662 M Won NPV with 0.05 B/C Ratio for Hyeonam. Thirdly, B/C Ratio became inverse-proportionally low when 3%, 4% downward and 7%, 9% upward discount rates were applied as the parameters, and NPV showed closed to a negative(-) value for Geomdoonggol and Shinmokgol districts and a positive(+) value for Jooseong and Hyeonam.
    Looking at the individual WTP results in this study, the WTP on ‘New construction and facility of roads was estimated the highest. This implies that road projects are the most required project for the concerned residents. On the other hand, the WTP for parks and parking lots came out to be relatively low, and this seems to be due to the fact not-high income level of the concerned residents was indirectly reflected through the study or of low awareness of the significance relative to road projects. Also, by looking at the CBA results, both the NPV and B/C ratio showed very poor results in terms of economic efficiency, and this implies the fact that infrastructure should be provided in terms of welfare projects and not economic efficiency for policy decisions.
    As the conclusion of this study, it is very significant in terms of the fact that costs and benefits of the infrastructures provided through district planning at urban settled villages were estimated prior to performing the project. However, the point it has been represented with the project benefits by deriving WTP in the form of maintenance fund could be impractical at this time point where there are numerous varieties of benefits depending on the project and no resident has experienced the effect. Furthermore, there was a limit on the fact that an identical WTP had been derived and reflected to all 4 districts as no sufficient samples were secured due to limited number of households for each district although WTP should have been derived depending on the characteristics of the district planning by the districts. In the future, sufficient number of samples should be secured when predicting the benefits of a district planning, and researches which WTP with appropriately reflected district characteristics should be derived.

    더보기

    목차 (Table of Contents)

    • Ⅰ. 서 론 1
    • 1. 연구의 배경 및 목적 1
    • 2. 연구의 범위와 내용 4
    • 1) 연구의 범위 4
    • 2) 연구의 내용 5
    • Ⅰ. 서 론 1
    • 1. 연구의 배경 및 목적 1
    • 2. 연구의 범위와 내용 4
    • 1) 연구의 범위 4
    • 2) 연구의 내용 5
    • Ⅱ. 이론적 고찰 7
    • 1. 주민참여형 자연취락지구 지구단위계획 7
    • 1) 지구단위계획의 개요 7
    • 2) 취락지구 내 지구단위계획의 수립 9
    • 3) 지구단위계획에서의 주민참여 12
    • 2. 공공정책사업의 평가 방법 17
    • 1) 공공정책사업의 평가 방법 17
    • 2) 비용·편익 분석을 통한 가치 측정 방법 17
    • 3. 비시장재의 가치 측정 27
    • 1) 비시장재화의 가치 27
    • 2) 비시장재화의 가치 측정 방법 29
    • 3) 조건부가치측정법 33
    • 4. 선행연구 검토 40
    • 1) 지구단위계획에 관한 고찰 40
    • 2) 비용·편익 분석에 관한 고찰 41
    • 3) 최근 연구동향 및 차별성 49
    • Ⅲ. 분석의 전제조건 및 분석 체계 52
    • 1. 분석의 틀 52
    • 1) 분석 개요 52
    • 2) 분석의 기본 틀 52
    • 2. 분석의 전제조건 설정 54
    • 1) 정책 시나리오 설정 54
    • 2) 정책효과의 영향범위 설정 및 분석기간 설정 54
    • 3) 통제 변수의 기준 설정 56
    • 4) 사회적 할인율(social discount rate) 설정 56
    • 3. 분석 체계 수립 58
    • 1) 비용과 편익의 항목화 및 평가, 자료수집 방법 58
    • 2) 계량분석 범위 설정 60
    • 3) 비시장재효과(편익)의 추정 틀 60
    • 4) 비용·편익 분석의 지표 설정 67
    • Ⅳ. 지구별 비용·편익 측정 및 분석 68
    • 1. 분석 범위 설정 68
    • 1) 청주시 자연취락지구 지구단위계획의 개요 68
    • 2) 지구별 정책효과의 영향범위 구축 73
    • 3) 지구별 통제 변수 76
    • 2. 비용·편익 항목의 화폐가치화 77
    • 1) 비용의 추정 77
    • 2) 조건부가치측정법(CVM)에 의한 편익의 추정 83
    • 3. 비용·편익 분석 99
    • 1) 지구별 비용·편익 분석 99
    • 2) 지구별 민감도 분석 105
    • 3) 지구단위계획의 타당성을 위한 WTP의 예측분석 106
    • 4. 분석 결과 종합 108
    • Ⅴ. 결론 110
    • <참고문헌> 112
    • <부 록> 118
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼