RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI우수등재

    프로젝트관리기법 도입 및 적용에 대한 4 개 산업 비교 및 분석

    한글로보기

    https://www.riss.kr/link?id=A100856303

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    This study presents a methodology to systematically assess organizational Project Management (PM) maturity. This assessment is used to measure and compare organization`s PM level quantitatively. A 5-level Model is introduced to position and determine an organizations current and relative PM maturity. A total of 38 organizations, including 15 Engineering and Construction, 10 Telecommunications, 10 Software Development, and 3 Hi-Tech Manufacturing companies have participated in this study. This study also suggests a step to estimate the return on PM investment (PM/ROI) on an order-of-magnitude basis. First, regression analysis reveals that the organizational PM level and actual cost and schedule performance data from projects representative of the companies are positively associated. The conceptual PM/ROI calculation procedure is then presented to encourage managers investing in PM processes, tools, and techniques. This research provides a solid and comparative analysis methodology on PM practices which in turn can help managers to improve their PM processes and its effectiveness.
    번역하기

    This study presents a methodology to systematically assess organizational Project Management (PM) maturity. This assessment is used to measure and compare organization`s PM level quantitatively. A 5-level Model is introduced to position and determine ...

    This study presents a methodology to systematically assess organizational Project Management (PM) maturity. This assessment is used to measure and compare organization`s PM level quantitatively. A 5-level Model is introduced to position and determine an organizations current and relative PM maturity. A total of 38 organizations, including 15 Engineering and Construction, 10 Telecommunications, 10 Software Development, and 3 Hi-Tech Manufacturing companies have participated in this study. This study also suggests a step to estimate the return on PM investment (PM/ROI) on an order-of-magnitude basis. First, regression analysis reveals that the organizational PM level and actual cost and schedule performance data from projects representative of the companies are positively associated. The conceptual PM/ROI calculation procedure is then presented to encourage managers investing in PM processes, tools, and techniques. This research provides a solid and comparative analysis methodology on PM practices which in turn can help managers to improve their PM processes and its effectiveness.

    더보기

    동일학술지(권/호) 다른 논문

    동일학술지 더보기

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼