RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      영광 원자력발전소 3,4호기의 계통 병입에 따른 전력계통의 안정도 해석 = A Transient Stability Analysis of Power System According to Connection of Two Units YGN 3&4 N/P

      한글로보기

      https://www.riss.kr/link?id=A19597045

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      This paper deals with consideration for transient stability of power system The analysis of transient stability is very important because it detects the possibility of large scale outage by system collapse caused system configuration change and load unbalance. Two units YGN 3&4 will be connected to the YGN 1 & 2 switchyard through two 345KV circuits until 1996 because of the nuclear power plant construction according to power demand increment. Therefore it is necessary to study stability analysis, fault capacity calculation and power flow problem in assumption of two units YGN 3&4 operation interconnected with the power system Finally, considerations of the effect of interconnection and the establishment of preservation methods for reliability of stable opration of the power system are included in this paper.
      번역하기

      This paper deals with consideration for transient stability of power system The analysis of transient stability is very important because it detects the possibility of large scale outage by system collapse caused system configuration change and load u...

      This paper deals with consideration for transient stability of power system The analysis of transient stability is very important because it detects the possibility of large scale outage by system collapse caused system configuration change and load unbalance. Two units YGN 3&4 will be connected to the YGN 1 & 2 switchyard through two 345KV circuits until 1996 because of the nuclear power plant construction according to power demand increment. Therefore it is necessary to study stability analysis, fault capacity calculation and power flow problem in assumption of two units YGN 3&4 operation interconnected with the power system Finally, considerations of the effect of interconnection and the establishment of preservation methods for reliability of stable opration of the power system are included in this paper.

      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼