A new high voltage direct current (HVDC) system from Jindo-to-Seojeju and 80 ㎿ wind farms will be installed in Jeju-island in the near future. The real time simulation for Jeju power system is needed for analysing newly installed systems in advance....
A new high voltage direct current (HVDC) system from Jindo-to-Seojeju and 80 ㎿ wind farms will be installed in Jeju-island in the near future. The real time simulation for Jeju power system is needed for analysing newly installed systems in advance. This paper provides real time simulation techniques for Jeju power system using a real time digital simulator (RTDS). Simulation results show the frequency and power output variations under variable wind speed patterns of each wind farm.