RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      Soyang Gang Multi-Purpose Dam Project, 4: Estimate of Construction Cost

      한글로보기

      https://www.riss.kr/link?id=G3636100

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      목차 (Table of Contents)

      • Estimate of Construction Cost for The Soyang Gang Multi-purpose Dam Project
      • I. DAM
      • I-A DIVERSION TUNNEL (NO.1)
      • I-B DIVERSION TUNNEL (NO.2)
      • I-C GUIDEWALL AT OUTLET OF DIVERSION TUNNEL
      • Estimate of Construction Cost for The Soyang Gang Multi-purpose Dam Project
      • I. DAM
      • I-A DIVERSION TUNNEL (NO.1)
      • I-B DIVERSION TUNNEL (NO.2)
      • I-C GUIDEWALL AT OUTLET OF DIVERSION TUNNEL
      • I-D COFFER DAMS
      • I-E MAIN DAM
      • I-F SPILLWAY
      • I-G CONSTRUCTION EQUIPMENT & MATERIALS to be imported including inland transportation on and clearance
      • II. WATERWAY
      • II-A INTAKE
      • II-B HEAD RACE TUNNEL
      • II-C SURGE TANK
      • II-D PENSTOCK TUNNEL
      • II-E PENSTOCK LINE
      • II-F TALL RACE
      • II-G OUTSET FACILITY FOR WATER SUPPLY
      • II-H CONSTRUCTION EQUIPMENT & MATERIALS to be imported, including inland transportation and custom clearance
      • III. POWER HOUSE AND SWITCH YARD
      • III-A POWER HOUSE SUBSTRUCTURE
      • III-B POWER HOUSE SUPERSTRUCTURE
      • III-C OUTDOOR SWITCH YARD
      • III-D APPURTENANT BUILDING
      • III-E FLOOD FORECASTING SYSTEM
      • III-F EQUIPMENT and MATERIALS to be imported, including inland transportation and custom clearance
      • IV. METAL WORKS
      • IV-A SPILLWAY GATES
      • IV-B INTAKE TRASH RACKS
      • IV-C INTAKE GATE
      • IV-D DRAFT TUBE GATES
      • IV-E STEEL PENSTOCK
      • IV-F HOLLOW JET VALVE and GUARD GATE
      • IV-G DIVERSION TUNNEL GATES
      • IV-H INLAND TRANSPORTATION and CUSTOM CLEARANCE
      • V. POWER GENERATING EQUIPMENT
      • VI. TRANSMISSION LINE
      • VI-A Equipment and materials
      • VI-B Installation including construction works
      • VI-C Inland transportation and custom clearance
      • VII. CONSTRUCTION MACHINERIES including spare parts
      • VII-A Construction machineries
      • VII-B Spare parts for
      • VII-C Inland transportation and Custom clearance
      • VIII. CONSTRUCTION FACILITIES
      • VIII-A Access roads and Bridge
      • VIII-B BUILDINGS, estimated by KOWACO
      • VIII-C WATER SUPPLY SYSTEM
      • VIII-D CONSTRUCTION PLANTS including installation
      • VIII-E POWER, COMMUNICATION and LIGHTING FACILTY
      • VIII-F CONSUMPTIVE ELECTRIC POWER for use Construction use
      • IX. COMPENSATION of Land and right including road relocation, estimated by KOWACO
      • IX-A For military facility
      • IX-B For private facility
      • IX-C Others
      • X. GOVERNMENT ADMINISTRATIVE EXPENSES
      • X-A For Engineering services including design and construction supervision
      • X-B For Survey and investigations, estimated by KOWACO
      • X-C For General administration, estimated by KOWACO
      • XI. CONTENGENCY and RESERVES
      • XII. INTEREST during construction
      • Draft Yearly Budget Schedule for the Soyang Gang Multipurpose Dam Project
      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼