In Korea high-speed train(HEMU-400X) system with distributed power is being developed and the highest test speed of this train is 400km/h. This developed the first high-speed train as a distributed power train in Korea as well as for the development o...
In Korea high-speed train(HEMU-400X) system with distributed power is being developed and the highest test speed of this train is 400km/h. This developed the first high-speed train as a distributed power train in Korea as well as for the development of train system and evaluation system included evaluation technology is needed. Accordingly a comprehensive and efficient OMS(Overall Measurement System) was build up for verifying the performance of HEMU-400X.
By the case study of the G7 and TTX OMS of HEMU-400X was improved the test performance and maintainability. In particular the existing Window-based systems has a limit to the control due to this reason OMS applying enhanced RT(Real-time) system.
In this study compare the advantages and disadvantages of RT systems with Window-based systems as well as the configuration of the RT systems.