1 Box, G., "Time Series Analysis, Forecasting and Control" Prentice Hall 1994
2 Lorenzen, T.J., "The economic design of control charts: A uni¯ed approach" 28 : 3-10, 1986
3 Apley, D.W., "The GLRT for statistical process control of autocorrelated processes" 31 : 1123-1134, 1999
4 Box, G., "Statistical process monitoring and feedback adjustment{A discussion" 34 : 251-267, 1992
5 del Castillo, E., "Statistical process adjustment for quality control" John Wiley & Sons 2002
6 Box, G., "Statistical control by monitoring and feedback adjustment" John Wiley & Sons 1997
7 Reynolds, M.R. Jr., "Should observations be grouped for e®ective process monitoring?" 36 : 343-36, 2004
8 Reynolds, M.R. Jr., "Should exponentially weighted moving average and cumulative sum charts be used with Shewhart limits?" 47 : 409-424, 2005
9 Mastrangelo, C.M., "Shift detection properties of moving centerline control chart schemes" 32 : 67-74, 2000
10 Box, G., "Selection of sampling interval and action limit for discrete feedback adjustment" 36 : 369-378, 1994
1 Box, G., "Time Series Analysis, Forecasting and Control" Prentice Hall 1994
2 Lorenzen, T.J., "The economic design of control charts: A uni¯ed approach" 28 : 3-10, 1986
3 Apley, D.W., "The GLRT for statistical process control of autocorrelated processes" 31 : 1123-1134, 1999
4 Box, G., "Statistical process monitoring and feedback adjustment{A discussion" 34 : 251-267, 1992
5 del Castillo, E., "Statistical process adjustment for quality control" John Wiley & Sons 2002
6 Box, G., "Statistical control by monitoring and feedback adjustment" John Wiley & Sons 1997
7 Reynolds, M.R. Jr., "Should observations be grouped for e®ective process monitoring?" 36 : 343-36, 2004
8 Reynolds, M.R. Jr., "Should exponentially weighted moving average and cumulative sum charts be used with Shewhart limits?" 47 : 409-424, 2005
9 Mastrangelo, C.M., "Shift detection properties of moving centerline control chart schemes" 32 : 67-74, 2000
10 Box, G., "Selection of sampling interval and action limit for discrete feedback adjustment" 36 : 369-378, 1994
11 Jiang, W., "Proportional integral derivative charts for process monitoring" 44 : 205-214, 2002
12 Vander Wiel, S.A., "Monitoring processes that wander using integrated moving average models" 38 : 139-151, 1996
13 Capilla, C., "Integration of statistical and engineering process control in a continuous polymerization process" 41 : 14-28, 1999
14 Montgoemry, D.C., "Integrating sta-tistical process control and engineering process control" 26 : 79-87, 1994
15 Nembhard, H.B., "Integrated process control for startup operations" 30 : 201-211, 1998
16 Park, C., "Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring, to be published"
17 Park, C., "Economic design of a variable sampling rate EWMA control chart" 36 : 387-399, 2004
18 Reynolds, M.R. Jr., "Control charts and the e±cient allocation of sampling resources" 46 : 200-214, 2004
19 Ruhhal, N.H., "Control charts and feedback adjustments for a jump disturbance model" 32 : 379-394, 2000
20 Janakiram, M., "Combining SPC and EPC in a hybrid industry" 30 : 189-200, 1998
21 Reynolds, M.R. Jr., "CUSUM charts for detecting special causes in integrated process control, IIE Transactions, under revision for publication"
22 Jiang, W., "An economic model for integrated APC and SPC control charts" 32 : 505-513, 2000
23 Vander Wiel, S.A., "Algorithmic statistical process control: Concepts and an application" 34 : 286-297, 1992
24 Park, C., "A statistical process control procedure with adjustments and monitoring" 47 : 2061-2072, 2001
25 Montgomery, D.C., "A perspective on models and the quality sciences: Some chal-lenges and future directions" 18 : 8-13, 1999
26 Jiang, W., "A joint monitoring scheme for automatically controlled processes" 36 : 1201-1210, 2004