RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    하도급계획제출제도의 개선방안 = An Improvement On The Subcontract Plan Submission System(bidding system accompanied with subcontractors)

    한글로보기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    Subcontract Plan Submission System was introduced in 2008 when the Fundamentals of Construction Business Act was amended and it has been operated till so far. The essential purpose of this system is to make project owner confirm a subcontracting agreement in advance and to have the contractor conduct the construction as agreed. This enables the project owner to get provided excellent quality facilities and subcontractor to get proper construction cost. However, current Subcontract Plan Submission System does not achieve the ultimate purpose of the system due to many problems. This study investigates the problems of scope of the construction to which the Subcontract Plan Submission System covers, the content of the subcontract plan, submission procedure, and the sanctions in case of breaching Subcontract Plan Submission System and it proposes an improvement plan based on the analysis result. By doing so, this study aims to contribute to implementation of the essential purpose.
    번역하기

    Subcontract Plan Submission System was introduced in 2008 when the Fundamentals of Construction Business Act was amended and it has been operated till so far. The essential purpose of this system is to make project owner confirm a subcontracting agree...

    Subcontract Plan Submission System was introduced in 2008 when the Fundamentals of Construction Business Act was amended and it has been operated till so far. The essential purpose of this system is to make project owner confirm a subcontracting agreement in advance and to have the contractor conduct the construction as agreed. This enables the project owner to get provided excellent quality facilities and subcontractor to get proper construction cost. However, current Subcontract Plan Submission System does not achieve the ultimate purpose of the system due to many problems. This study investigates the problems of scope of the construction to which the Subcontract Plan Submission System covers, the content of the subcontract plan, submission procedure, and the sanctions in case of breaching Subcontract Plan Submission System and it proposes an improvement plan based on the analysis result. By doing so, this study aims to contribute to implementation of the essential purpose.

    더보기

    동일학술지(권/호) 다른 논문

    동일학술지 더보기

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼