RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      새만금 사업에 따른 환경문제 = Environmental Problems associated with Saemangeum Project

      한글로보기

      https://www.riss.kr/link?id=A76452864

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Environmental problems associated with Saemangeum project are evaluated through litera-ture review. The main purpose of this research is to study what is major problems of present counterplan for pollution abatement in Saemangeum area and to study how to cope with situation. Two major problems are pointed out. The one is economic comparison between conserving the wet land and reclamation should have done and environmental impact assessment of Saemangeum project was not appropriate. The other is existing countermeasure for maintaining water quaJity of Saemangerm lake to desired level is not satisfactory.
      When considering the fact that about 35% of dike is built already, not only simple stopping of dike construction without any provision of ecological remediation programe in Saemangeum wetland but also continuing reclamation project without further provision of pollution abatement can not be justified in view of environmental standpoint. It is inevitable to avoid serious water poJiution of Saemangeum lake unless substantial revion will be made to existing poJiution abatement program. Additional counterplan should be provided as soon as possible. It is necessary that construction and repairing sewer system, control and management of non-point source, construction of nutrient removal syst41em should be included in existing plan for the reduction of pollutant load.Excess discharge of phosphorus from watershed is typical characteristics of
      area. Main source of phosphorus is animal wastes that acts as non-point source
      pollutant. Thus, control and management of animal wastes is key factor in reducing
      phosphorus loading from Saemangeum watershed. It is apparent that not only schemes for reducing pollutant loading from Saemangeum watershed but also schemes for improving water quality of Saemangeum lake should be revised in order to meet desired water quality standard. Using 470 million tons/yr of Keum river water as dilution water and dischsrging bottom water of lake periodically to open sea are the main counterplans provided by Rural Development Corporation for
      improving water quality of Saemangeum lake. However, It seems that these counterplans have some problems. In stead of it, several counterplans can be suggested for improving water quality of Saemangeum lake. In view of water quality, it is doubt that whether Keum river can be used as dilution water or not. It is thought that minimizing lake capacity and allocation of several small lakes instead of one big lake, instal1ing forced vertical circulating system using aerator are better counterplan than present scheme, that is, discharging bottom water of lake periodically to open sea. Designation of Saemangeum watershed as the special counterplan region based on law can be recommended. Land development plan after reclamation should be determined as soon as possible before completion of dike construction.
      번역하기

      Environmental problems associated with Saemangeum project are evaluated through litera-ture review. The main purpose of this research is to study what is major problems of present counterplan for pollution abatement in Saemangeum area and to study how...

      Environmental problems associated with Saemangeum project are evaluated through litera-ture review. The main purpose of this research is to study what is major problems of present counterplan for pollution abatement in Saemangeum area and to study how to cope with situation. Two major problems are pointed out. The one is economic comparison between conserving the wet land and reclamation should have done and environmental impact assessment of Saemangeum project was not appropriate. The other is existing countermeasure for maintaining water quaJity of Saemangerm lake to desired level is not satisfactory.
      When considering the fact that about 35% of dike is built already, not only simple stopping of dike construction without any provision of ecological remediation programe in Saemangeum wetland but also continuing reclamation project without further provision of pollution abatement can not be justified in view of environmental standpoint. It is inevitable to avoid serious water poJiution of Saemangeum lake unless substantial revion will be made to existing poJiution abatement program. Additional counterplan should be provided as soon as possible. It is necessary that construction and repairing sewer system, control and management of non-point source, construction of nutrient removal syst41em should be included in existing plan for the reduction of pollutant load.Excess discharge of phosphorus from watershed is typical characteristics of
      area. Main source of phosphorus is animal wastes that acts as non-point source
      pollutant. Thus, control and management of animal wastes is key factor in reducing
      phosphorus loading from Saemangeum watershed. It is apparent that not only schemes for reducing pollutant loading from Saemangeum watershed but also schemes for improving water quality of Saemangeum lake should be revised in order to meet desired water quality standard. Using 470 million tons/yr of Keum river water as dilution water and dischsrging bottom water of lake periodically to open sea are the main counterplans provided by Rural Development Corporation for
      improving water quality of Saemangeum lake. However, It seems that these counterplans have some problems. In stead of it, several counterplans can be suggested for improving water quality of Saemangeum lake. In view of water quality, it is doubt that whether Keum river can be used as dilution water or not. It is thought that minimizing lake capacity and allocation of several small lakes instead of one big lake, instal1ing forced vertical circulating system using aerator are better counterplan than present scheme, that is, discharging bottom water of lake periodically to open sea. Designation of Saemangeum watershed as the special counterplan region based on law can be recommended. Land development plan after reclamation should be determined as soon as possible before completion of dike construction.

      더보기

      목차 (Table of Contents)

      • Abstract
      • Ⅰ.머리말
      • Ⅱ.새만금 간석지 개발에 따른 문제점
      • Ⅲ.수질 보전 대책상의 문제점(새만금호를 중심으로)
      • Ⅳ.맺는 말
      • Abstract
      • Ⅰ.머리말
      • Ⅱ.새만금 간석지 개발에 따른 문제점
      • Ⅲ.수질 보전 대책상의 문제점(새만금호를 중심으로)
      • Ⅳ.맺는 말
      • Ⅴ.참고자료
      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼