RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI등재

    플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석 = A Comparative Analysis of Risk Assessment Depending on International Project Types

    한글로보기

    https://www.riss.kr/link?id=A106370981

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.
    번역하기

    This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by pro...

    This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

    더보기

    참고문헌 (Reference)

    1 정우용, "해외토목 원도급사업의 원가상승 원인에 관한 연구" 한국건설관리학회 18 (18): 105-116, 2017

    2 황건욱, "해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -" 한국건설관리학회 17 (17): 90-97, 2016

    3 송영한, "아시아지역 투자개발형 사업의 리스크 인자 중요도 분석" 대한건축학회 23 (23): 145-152, 2007

    4 안병호, "건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석" 한국건설관리학회 14 (14): 150-159, 2013

    5 Jung Ki Lee, "“Win-Win Strategy” for Sustainable Relationship between General Contractors and Subcontractors in International Construction Projects" 대한토목학회 22 (22): 428-439, 2018

    6 Jung, W., "Which risk management is most crucial for controlling project cost?" 33 (33): 04017029-, 2017

    7 ENR (Engineering News Records), "The top 250 international contractors"

    8 Kim, D. Y., "Structuring the prediction model of project performance for international construction projects : A comparative analysis" 36 (36): 1961-1971, 2009

    9 Kim, D. Y., "Risk-based decision model for contingency estimation of large construction projects" The Korea Society of Decision Science 24 (24): 11-26, 2016

    10 Wood, G. D., "Risk management practices of leading UK cost consultants. Engineering" 10 (10): 254-262, 2003

    1 정우용, "해외토목 원도급사업의 원가상승 원인에 관한 연구" 한국건설관리학회 18 (18): 105-116, 2017

    2 황건욱, "해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -" 한국건설관리학회 17 (17): 90-97, 2016

    3 송영한, "아시아지역 투자개발형 사업의 리스크 인자 중요도 분석" 대한건축학회 23 (23): 145-152, 2007

    4 안병호, "건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석" 한국건설관리학회 14 (14): 150-159, 2013

    5 Jung Ki Lee, "“Win-Win Strategy” for Sustainable Relationship between General Contractors and Subcontractors in International Construction Projects" 대한토목학회 22 (22): 428-439, 2018

    6 Jung, W., "Which risk management is most crucial for controlling project cost?" 33 (33): 04017029-, 2017

    7 ENR (Engineering News Records), "The top 250 international contractors"

    8 Kim, D. Y., "Structuring the prediction model of project performance for international construction projects : A comparative analysis" 36 (36): 1961-1971, 2009

    9 Kim, D. Y., "Risk-based decision model for contingency estimation of large construction projects" The Korea Society of Decision Science 24 (24): 11-26, 2016

    10 Wood, G. D., "Risk management practices of leading UK cost consultants. Engineering" 10 (10): 254-262, 2003

    11 Tang, W., "Risk management in the Chinese construction industry" 133 (133): 944-956, 2007

    12 Utama, W. P., "Review of research trend in international construction projects : a bibliometric analysis" 16 (16): 71-82, 2016

    13 Lee, Y. K., "Recent International Construction Market Trend and Forecast for 2019" 86 (86): 13-22, 2019

    14 Han, S. H., "Predicting profit performance for selecting candidate international construction projects" 133 (133): 425-436, 2007

    15 Jang, W., "Naive Bayesian classifier for selecting good/bad projects during the early stage of international construction bidding decisions" 2015 : 1-12, 2015

    16 CII(Construction Industry Institute), "International project risk assessment (IPRA) tool, implementation resource" CII 2003

    17 Mahalingam, A., "Institutional theory as a framework for analyzing conflicts on global projects" 133 (133): 517-528, 2007

    18 Bingham, E., "Infrastructure project scope definition using project definition rating index" 33 (33): 04016037-, 2016

    19 Lee, M.K., "How to approach re-opening middle east market" The Bell

    20 Laryea, S., "How contractors price risk in bids : theory and practice" 26 (26): 911-924, 2008

    21 PMI(Project Management Institute), "Guide to the project management body of knowledge"

    22 Yoo, W. S., "Development of International Construction Project Risk Index(IPRI)and its implications" CERIK 7 : 1-37, 2015

    23 Yoo, W. S., "Current state of risk management capability of Korean construction companies and its applications" CERIK 14 : 1-29, 2014

    24 Kang, J.H., "Current international construction market trend and forecast for 2019" The Export-Import Bank of Korea

    25 Kim, J. K., "Current Construction Market Trend and Forecast for 2017 of Middle East Region" ICAK 2017 (2017): 24-35, 2017

    26 Yang, I.C., "Competitiveness analysis of the Korean construction companies in the international construction market and its implications" Korea Development Bank

    27 Han, S. H., "Causes of bad profit in overseas construction projects" 133 (133): 932-943, 2007

    28 Han, S. H., "Approaches for making risk-based go/no-go decision for international projects" 127 (127): 300-308, 2001

    29 Lee, J. Y., "Analysis of major delay factors of overseas building projects based on FMEA – Focus on design phase of plants in Middle East and Asia -" KICEM 11 : 18-21, 2014

    30 Lee, K. P., "Analysis of international project management capability of Korean construction companies" CERIK 10 : 1-34, 2018

    31 Jang, W., "A stage-gate integrated risk control system for LNG plant projects : Focusing on the design phase" 22 : 437-446, 2015

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    인용정보 인용지수 설명보기

    학술지 이력

    학술지 이력
    연월일 이력구분 이력상세 등재구분
    2027 평가 재인증평가 신청대상 (재인증)
    2021-01-01 등재 등재학술지 유지 (재인증) KCI등재
    2018-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2015-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2011-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2009-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2008-12-23 학술지명변경 한글명 : 건설관리 -> 한국건설관리학회 논문집 KCI등재
    2006-01-01 등재 등재학술지 선정 (등재후보2차) KCI등재
    2005-01-01 등재 등재후보 1차 PASS (등재후보1차) KCI등재후보
    2003-01-01 등재 등재후보학술지 선정 (신규평가) KCI등재후보
    더보기

    학술지 인용정보

    학술지 인용정보
    기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
    2016 0.54 0.54 0.54
    KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
    0.53 0.5 0.772 0.22
    더보기

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼