RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    벽식 공동주택의 벽체 조립기준면 실태조사 연구(Ⅱ) = 내력벽체 안목치수 시공실태를 중심으로

    한글로보기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    The standardization is expected to enhance the productivity through increasing competitiveness between design criteria and material sizes, and is also expected to preserve the environment through reducing wastes from construction sites.
    In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 7 years. So MC design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc.
    But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance.
    However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to survey the question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare with design survey.
    번역하기

    The standardization is expected to enhance the productivity through increasing competitiveness between design criteria and material sizes, and is also expected to preserve the environment through reducing wastes from construction sites. In our coun...

    The standardization is expected to enhance the productivity through increasing competitiveness between design criteria and material sizes, and is also expected to preserve the environment through reducing wastes from construction sites.
    In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 7 years. So MC design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc.
    But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance.
    However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to survey the question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare with design survey.

    더보기

    목차 (Table of Contents)

    • Abstract
    • 1. 서론
    • 2. 조립기준면을 위한 먹줄 시공관리
    • 3. 구체의 시공오차조사 및 분석
    • 4. 벽체 안목치수 실태조사 및 결과
    • Abstract
    • 1. 서론
    • 2. 조립기준면을 위한 먹줄 시공관리
    • 3. 구체의 시공오차조사 및 분석
    • 4. 벽체 안목치수 실태조사 및 결과
    • 5. 결론
    • 참고문헌
    더보기

    동일학술지(권/호) 다른 논문

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼