RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      Proposal to Provide Engineering Services to the Korean Water Resources Development Corporation for Design and Construction of the Andong Multi-Purpose Project Naktong River, Korea

      한글로보기

      https://www.riss.kr/link?id=G3636135

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      목차 (Table of Contents)

      • INTRODUCTION
      • PURPOSE OF THE PROJECT
      • CONSULTING SERVICES REQUIRED
      • SCOPE OF SERVICES
      • Phase II-A
      • INTRODUCTION
      • PURPOSE OF THE PROJECT
      • CONSULTING SERVICES REQUIRED
      • SCOPE OF SERVICES
      • Phase II-A
      • Phase II-B
      • PLAN FOR PERFORMANCE OF SERVICES
      • General
      • PLAN FOR SERVICES, PHASE II-A
      • Review of Prior Planning and Contract Documents
      • Construction Schedules
      • Contracts Assistance
      • Detailed Design of Project Structures
      • Afterbay Weir Contract Documents
      • Construction Equipment and Spare Parts
      • Supplemental Investigations by KOWACO
      • Gates, Hoists, and Auxiliary Equipment
      • Transmission Line and Substations
      • Flood Forecasting and Instrumentation Systems
      • Budgets and Cost Estimates
      • Reports, Contract Documents and Drawings
      • Procurement of Supplies and Vehicles
      • Other Services
      • Training of Three Korean Engineers
      • PLAN FOR SERVICES, PHASE II-B
      • Resident Engineer and Deputy
      • Project Director
      • Special Assistance
      • Periodic Visits By Officers of Harza
      • SCHEDULE AND MANPOWER ESTIMATES
      • QUALIFICATIONS AND EXPERIENCE OF THE HARZA ENGINEERING COMPANY
      • Design-Engineering
      • General Hydroelectric Design
      • Dams and Reservoirs
      • Tunnels, Surge Tanks, and Penstocks
      • Powerplants
      • Powerplant Equipment
      • Substations
      • Computer Applications
      • Innovative Designs
      • Applications to the Proposed Project
      • Engineering Services during Construction
      • Operation, Maintenance, and Administration
      • HARZA’S VOLUME OF BUSINESS
      • QUALIFICATIONS FOR ABD FINANCED PROJECTS
      • SUPPORT FROM KOWACO
      • PROPOSED STAFFING AND PARTICIPATING PERSONNEL
      • EXHIBITS
      • RESUME
      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼