ESICD(Electrical Signal Interface Control Document) refers to a document that describes protocols and data for communication between components consist of a system. Each component developer gathers at a specific place to conduct an integrated test for...
ESICD(Electrical Signal Interface Control Document) refers to a document that describes protocols and data for communication between components consist of a system. Each component developer gathers at a specific place to conduct an integrated test for ESICD verification. In this case, it often happens that the integration test is delayed due to a simple mistake of software developers. There are two reasons for this situation: First, software developers do not perform sufficient verification because it is difficult to configure the system environment in a Lab, and second, they do not immediately find the cause of errors occurred during integration tests. Therefore, in this paper, we propose a strategy to effectively perform ESICD verification, which takes a lot of time between the production and implementation stage of the weapon system development stage and the system integration test stage.