This study was intended to improvement with quality-control for constructional project. Difficulties of quality-control were classified by the factor of cause and analyzed, Generally, Quality-Control has been very fine in large-scale project but it ha...
This study was intended to improvement with quality-control for constructional project. Difficulties of quality-control were classified by the factor of cause and analyzed, Generally, Quality-Control has been very fine in large-scale project but it has been difficulties in small scale. Oftained results are summarized as follow.
1. Remi-con will be used to the small-scale project (individual-dwelling) politically.
2. According to an investigation in classified by the factor of cause, construction-engineers responsibility was reached at 66 percent higher than the manufactory.
3. Quality-control will be strengthened politically through the deming cycle.
4. Quality-control must be studied and improved successively in the future.