1 이청호, "토요타 생산시스템의 도입 전제조건에 관한 연구 - 한일자동차부품기업의 사례를 중심으로 -" 한국산업경제학회 17 (17): 1833-1853, 2004
2 김득수, "자동차 생산라인을 위한 통합창고 시스템" 한국산업경영시스템학회 37 (37): 1-8, 2014
3 정명기, "모듈생산방식에 따른 부품조달체계 변화에 관한 연구:현대자동차 아산공장을 중심으로" 한독경상학회 25 (25): 35-54, 2007
4 Kim, K.H., "Web-based Process Planning System for Automotive Final Assembly Shop" 993-998, 2003
5 Koch, R., "The 80/20 Principle : The Secret of Achieving More with Less" Nicholas Brealey Publishing 2001
6 Warwick, T., "Tackling Car Sequencing Using a Generic Genetic Algorithm Strategy" 3 (3): 267-298, 1995
7 Sipper, D., "Production Planning, Control, and Integration" McGraw-Hill Co, Inc 1997
8 Ha, Y. H., "Implementation of a Vehicle Production Sequencing Module Using Constraint Satisfaction Technique for Vehicle Production Planning System" 16 (16): 352-361, 2003
9 Kim, Y.M., "Grouping In a Mixed-model Assembly Line" 9 (9): 39-45, 1996
10 Myung, S.Y., "Digital Process Planning in Automotive Assembly Line" 1139-1144, 2002
1 이청호, "토요타 생산시스템의 도입 전제조건에 관한 연구 - 한일자동차부품기업의 사례를 중심으로 -" 한국산업경제학회 17 (17): 1833-1853, 2004
2 김득수, "자동차 생산라인을 위한 통합창고 시스템" 한국산업경영시스템학회 37 (37): 1-8, 2014
3 정명기, "모듈생산방식에 따른 부품조달체계 변화에 관한 연구:현대자동차 아산공장을 중심으로" 한독경상학회 25 (25): 35-54, 2007
4 Kim, K.H., "Web-based Process Planning System for Automotive Final Assembly Shop" 993-998, 2003
5 Koch, R., "The 80/20 Principle : The Secret of Achieving More with Less" Nicholas Brealey Publishing 2001
6 Warwick, T., "Tackling Car Sequencing Using a Generic Genetic Algorithm Strategy" 3 (3): 267-298, 1995
7 Sipper, D., "Production Planning, Control, and Integration" McGraw-Hill Co, Inc 1997
8 Ha, Y. H., "Implementation of a Vehicle Production Sequencing Module Using Constraint Satisfaction Technique for Vehicle Production Planning System" 16 (16): 352-361, 2003
9 Kim, Y.M., "Grouping In a Mixed-model Assembly Line" 9 (9): 39-45, 1996
10 Myung, S.Y., "Digital Process Planning in Automotive Assembly Line" 1139-1144, 2002
11 Lee, J.S., "Development of an e-SCM system for a supply chain of an auto mobile company" 72-79, 2005
12 Jang, J.S., "Design of Automobile Assembly Line Using Assembly Cell Method" The Korean Institute of Industrial Engineers 395-402, 2004
13 Bergen, M. E., "Constraintbased Vehicle Assembly Line Sequencing" 2056 : 88-99, 2001
14 Ko, H.S., "Collaborative Material and Process Planning with Production Flow Analysis for the Automotive General Assembly Shop" 1379-1384, 2004
15 Choi, W. J., "Automation of Real-time Production Sequencing System of an Automobile Assembly Line" 9 (9): 47-59, 1996
16 Park, H. K., "Automation of Color IE Selection System in the Automobile Painting Shop" 9 (9): 39-45, 1996
17 Yoon, S.Y., "A Study of the Implementation scheme of the RFID system in logistics" Pukyong National University 2007
18 Park, C.G., "A Simulation Study on the Automobile Front End Module Supply Chain System" 863-868, 2003
19 Kim, Y. K., "A Scheme to Strengthen SCM of Auto Part Supplier Using RFID" 19 (19): 209-218, 2006
20 Sheen, D. M., "A Process Planning System for Machining of Dies for Auto-Body Production" 17 (17): 108-115, 2000
21 Choi, W. J., "A Daily Production Sequencing system for the automobile assembly Plant" 9 (9): 61-74, 1996