RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI등재후보

    부동산 공공건물의 공기연장 타당성 분석 = Feasibility Analysis on the Schedule Extension in Real Estate Public Buildings - Based on Domestic Cases -

    한글로보기

    https://www.riss.kr/link?id=A82757249

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    1. CONTENTS
    (1) RESEARCH OBJECTIVES
    In the current real precedent for the construction of turnkey construction for extension of validity of expert interviews, literature search, through the lawyer’s comments were analyzed.
    (2) RESEARCH METHOD
    Literature research, expert interviews, case studies, a lawyer comments.
    (3) RESEARCH RESULTS
    Country. Abroad case studies and literature surveys, expert interviews, expert opinions of lawyers throughout the analysis of these two cases due to design changes during construction is considered as an extension application.
    2. RESULTS
    The purpose of this study for the turnkey construction of the extension of time to avoid claims is to analyze the feasibility of an extension. A prime example of a turnkey project. through the analysis due to design changes by mutual agreement of Employer and the Contractor of the project can be extended. According to the analysis of domestic and overseas, the project design changes or field conditions during the phase, due to the underground structure may be the reason for the extended period. Currently in the construction period to extend the growing trend for many claims and extend the contract period to period depending on the type responsible for the different materials. In this study, real cases, such as for example, analyzed the feasibility of renewal, to analyze the opinions of lawyers, expert legal analysis was carried out. In addition, through interviews of experts on the challenges that extended from beneath the comment period extension will be deemed valid.
    번역하기

    1. CONTENTS (1) RESEARCH OBJECTIVES In the current real precedent for the construction of turnkey construction for extension of validity of expert interviews, literature search, through the lawyer’s comments were analyzed. (2) RESEARCH METH...

    1. CONTENTS
    (1) RESEARCH OBJECTIVES
    In the current real precedent for the construction of turnkey construction for extension of validity of expert interviews, literature search, through the lawyer’s comments were analyzed.
    (2) RESEARCH METHOD
    Literature research, expert interviews, case studies, a lawyer comments.
    (3) RESEARCH RESULTS
    Country. Abroad case studies and literature surveys, expert interviews, expert opinions of lawyers throughout the analysis of these two cases due to design changes during construction is considered as an extension application.
    2. RESULTS
    The purpose of this study for the turnkey construction of the extension of time to avoid claims is to analyze the feasibility of an extension. A prime example of a turnkey project. through the analysis due to design changes by mutual agreement of Employer and the Contractor of the project can be extended. According to the analysis of domestic and overseas, the project design changes or field conditions during the phase, due to the underground structure may be the reason for the extended period. Currently in the construction period to extend the growing trend for many claims and extend the contract period to period depending on the type responsible for the different materials. In this study, real cases, such as for example, analyzed the feasibility of renewal, to analyze the opinions of lawyers, expert legal analysis was carried out. In addition, through interviews of experts on the challenges that extended from beneath the comment period extension will be deemed valid.

    더보기

    목차 (Table of Contents)

    • ABSTRACT
    • Ⅰ. 서론
    • Ⅱ. 선행연구 분석
    • Ⅲ. 부동산관리의 개념
    • Ⅳ. 턴키공사의 특성 및 클레임 분쟁의 정의
    • ABSTRACT
    • Ⅰ. 서론
    • Ⅱ. 선행연구 분석
    • Ⅲ. 부동산관리의 개념
    • Ⅳ. 턴키공사의 특성 및 클레임 분쟁의 정의
    • Ⅴ. 클레임의 발단 및 해결과제
    • Ⅵ. 법적해석 및 사례조사를 통한 공기연장 타당성 분석
    • Ⅶ. 결론
    • 參考文獻
    더보기

    동일학술지(권/호) 다른 논문

    동일학술지 더보기

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼