1 박창순, "미래손실에 기초한 통합공정관리계획" 한국통계학회 21 (21): 247-264, 2008
2 이재헌, "누적이동평균(1,1) 모형에서 공정 변화시점의 추정" 한국데이터정보과학회 20 (20): 435-443, 2009
3 Box, G. E. P., "Time series analysis, forecasting and control, 3rd Ed" Prentice Hall 1994
4 Box, G. E. P., "Statistical process control and feedback adjustment - A discussion" 34 : 251-285, 1992
5 Jiang, W., "SPC monitoring of MMSE- and PI-controlled processes" 34 : 384-398, 2002
6 Runger, G., "Relationships among control charts used with feedback control" 22 : 877-887, 2006
7 Vander Wiel, S. A., "Monitoring processes that wander using integrated moving average models" 38 : 139-151, 1996
8 Pan, R., "Integration of sequential process adjustment and process monitoring techniques" 19 : 371-386, 2003
9 Changsoon Park, "Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring" 한국통계학회 37 (37): 155-174, 2008
10 Nembhard, H. B., "Cuscore control charts for generalized feedback-control systems" 23 : 483-502, 2007
1 박창순, "미래손실에 기초한 통합공정관리계획" 한국통계학회 21 (21): 247-264, 2008
2 이재헌, "누적이동평균(1,1) 모형에서 공정 변화시점의 추정" 한국데이터정보과학회 20 (20): 435-443, 2009
3 Box, G. E. P., "Time series analysis, forecasting and control, 3rd Ed" Prentice Hall 1994
4 Box, G. E. P., "Statistical process control and feedback adjustment - A discussion" 34 : 251-285, 1992
5 Jiang, W., "SPC monitoring of MMSE- and PI-controlled processes" 34 : 384-398, 2002
6 Runger, G., "Relationships among control charts used with feedback control" 22 : 877-887, 2006
7 Vander Wiel, S. A., "Monitoring processes that wander using integrated moving average models" 38 : 139-151, 1996
8 Pan, R., "Integration of sequential process adjustment and process monitoring techniques" 19 : 371-386, 2003
9 Changsoon Park, "Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring" 한국통계학회 37 (37): 155-174, 2008
10 Nembhard, H. B., "Cuscore control charts for generalized feedback-control systems" 23 : 483-502, 2007
11 Hu, S. J., "Change patterns of time series-based control charts" 28 : 302-312, 1996
12 이재헌, "Change Point Estimators in Monitoring the Parameters of an AR(1) plus an Additional Random Error Model" 한국데이터정보과학회 18 (18): 963-972, 2007
13 Park, C., "An algorithm for the properties of the integrated process control with bounded adjustments and EWMA monitoring" 45 : 5571-5587, 2007
14 Tsung, F., "A mean-shift pattern study on integration of SPC and APC for process monitoring" 35 : 231-242, 2003
15 Jiang, W., "A joint monitoring scheme for automatically controlled processes" 36 : 1201-1210, 2004