- 1. Introduction
- 2. Job-Shop Scheduling Model
- 3. Assembly Line Balancing Model
- 4. Manufacturing and Logistics Model
- 5. Conclusions

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=A60212827
Mitsuo Gen (와세다대학교) ; Wenqiang Zhang (와세다대학교) ; Lin Lin (Waseda University)
2009
English
530
구)KCI등재(통합)
학술저널
15-39(25쪽)
2
0
상세조회0
다운로드목차 (Table of Contents)
참고문헌 (Reference)
1 Orvosh, D., "Using a genetic algorithm to optimize problems with Feasibility constrains" 548-552, 1994
2 Kim, Y. K., "Two-sided assembly line balancing : a genetic algorithm approach" 11 (11): 44-53, 2000
3 Adams, J., "The shifting bottleneck procedure for job shop scheduling" 34 (34): 391-401, 1987
4 Salveson, M. E., "The assembly line balancing problem" 6 : 18-25, 1955
5 Syarif, A., "Study on multi-stage logistics chain network : a spanning tree-based genetic algorithm approach" 43 : 299-314, 2002
6 Okamoto, A., "Study on Integrated Scheduling for Manufacturing and Logistics Information System using Hybrid Genetic Algorithm" Waseda University 2007
7 Zhang, H. P., "Study on Evolutionary Scheduling Problems in Integrated Manufacturing System" Waseda University 2006
8 Kim, H., "Strong cutting plane algorithm for the robotic assembly line balancing" 33 : 2311-2323, 1995
9 Suresh, G., "Stochastic assembly line balancing using simulated annealing" 32 (32): 1801-1810, 1994
10 Khouja, M., "Statistical procedures for task assignment and robot selection in assembly cells" 13 : 95-106, 2000
1 Orvosh, D., "Using a genetic algorithm to optimize problems with Feasibility constrains" 548-552, 1994
2 Kim, Y. K., "Two-sided assembly line balancing : a genetic algorithm approach" 11 (11): 44-53, 2000
3 Adams, J., "The shifting bottleneck procedure for job shop scheduling" 34 (34): 391-401, 1987
4 Salveson, M. E., "The assembly line balancing problem" 6 : 18-25, 1955
5 Syarif, A., "Study on multi-stage logistics chain network : a spanning tree-based genetic algorithm approach" 43 : 299-314, 2002
6 Okamoto, A., "Study on Integrated Scheduling for Manufacturing and Logistics Information System using Hybrid Genetic Algorithm" Waseda University 2007
7 Zhang, H. P., "Study on Evolutionary Scheduling Problems in Integrated Manufacturing System" Waseda University 2006
8 Kim, H., "Strong cutting plane algorithm for the robotic assembly line balancing" 33 : 2311-2323, 1995
9 Suresh, G., "Stochastic assembly line balancing using simulated annealing" 32 (32): 1801-1810, 1994
10 Khouja, M., "Statistical procedures for task assignment and robot selection in assembly cells" 13 : 95-106, 2000
11 Scholl, A., "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing" 168 : 666-693, 2006
12 Rekiek, B., "State of art of optimization methods for assembly line design" 26 : 163-174, 2002
13 Scholl, A., "Simple assembly line balancing-heuristic approaches" 2 : 217-244, 1996
14 French, S., "Sequencing and Scheduling. Mathematics and its applications" Ellis Horwood Limited 1982
15 Blazewicz, J., "Scheduling in Computer and Manufacturing Systems" Springer 1994
16 Brucker, P., "Scheduling Algorithms" Springer 1998
17 Brandimarte, P., "Routing and scheduling in a flexible job shop by tabu search" 41 : 157-183, 1993
18 Su, P., "Resource selection for distributed manufacturing in agile manufacturing" 2 (2): 1578-1582, 2003
19 Karp, R. M., "Reducibility among combinatorial problems. in: Complexity of Computer Applications" Plenum Press 85-104, 1972
20 Rubinovitz, J., "RALB-a heuristic algorithm for design and balancing of robotic assembly line" 42 : 497-500, 1993
21 Ida, k., "Proposal of algorithm for shortening idle time on job-shop scheduling problem and its numerical experiments" 56 (56): 294-301, 2005
22 Fisher, H., "Probabilistic learning combinations of job-shop scheduling rules" 15 : 1225-1251, 1963
23 Jayaraman, V., "Planning and coordination of production and distribution facilities for multiple commodities" 133 : 394-408, 2001
24 PSLX Consortium, "PSLX Technical Specifications, Recommendation, Version 1.0"
25 Nicosia, G., "Optimally balancing assembly lines with different workstations" 118 : 99-113, 2002
26 Truong, T. H., "Optimal design methodologies for configuration of supply chains" 43 (43): 2217-2236, 2005
27 Gen, M., "Network Models and Optimization : Multiobjective Genetic Algorithm Approach" Springer 2008
28 Zhang, H., "Multistage-based genetic algorithm for flexible job-shop scheduling problem" 11 : 223-232, 2005
29 Guillen, G., "Multiobjective supply chain design under uncertainty" 60 : 1535-1553, 2005
30 Wu, Z., "Multiagent scheduling method with earliness and tardiness objectives in flexible job shops, IEEE Trans" 35 (35): 293-301, 2005
31 Chen, C., "Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices" 28 : 1131-1144, 2004
32 Lee, C. Y., "Machine scheduling with transportation considerations" 4 : 3-24, 2001
33 Balas, E., "Machine Scheduling via disjunctive graphs : An implicit enumeration algorithm" 17 : 941-957, 1969
34 MESX Joint Working Group, "MESX White Paper"
35 Dar-El, E. M., "MALB-A heuristic technique for balancing large single-model assembly lines" 5 (5): 343-356, 1973
36 Bautista, J., "Local search heuristics for the assembly line balancing problem with incompatibilities between tasks" 2404-2409, 2000
37 Roy, B., "Les problems d’ordonnancement avec contraintes disjonctives" SEMA 1964
38 Bruker, P., "Job-shop scheduling with multi-purpose machines" 45 : 369-375, 1990
39 Baker, K., "Introduction to sequencing and scheduling" John Wiley and Sons 1974
40 Tan, W., "Integration of process planning and scheduling-a review" 11 (11): 51-63, 2000
41 Okamoto, A., "Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm" 17 : 411-421, 2006
42 Okamoto, A., "Integrated Scheduling Problem of Manufacturing and Transportation with Pickup and Delivery’" 1 : 19-27, 2006
43 Gen, M., "Hybrid genetic algorithm for multi-time period production /distribution planning" 48 (48): 799-809, 2005
44 Helgeson, W. B., "How to balance an assembly line, Technical Report" Carr Press 1954
45 Bean, J. C., "Genetics and random keys for sequencing and optimization" 6 : 154-160, 1994
46 Runarsson, T. P., "Genetic production systems for intelligent problem solving" 10 : 181-186, 1999
47 Anderson, E. J., "Genetic algorithms for combinatorial optimization : the assembly line balancing problem" 6 : 161-173, 1994
48 Kim, Y. K., "Genetic algorithms for assembly line balancing with various objectives" 30 (30): 397-409, 1996
49 Brudaru, O., "Genetic algorithm with embryonic chromosomes for assembly line balancing with fuzzy processing times" 2004
50 Gen, M., "Genetic Algorithms and Engineering Optimization" John Wiley and Sons 2000
51 Gen, M., "Genetic Algorithms and Engineering Design" John Wiley and Sons 1997
52 Yang, J. B., "GA-based discrete dynamic programming approach for scheduling in FMS environments" 31 (31): 824-835, 2001
53 W3C, "Extensible Markup Language (XML) 1.0 (3rd Edition)"
54 Moon, C., "Evolutionary System Approach for Advanced Planning in Multi-Plant Chain" Waseda University 2004
55 Gen, M., "Effective designing chromosome for optimizing advanced planning and scheduling. in: Intelligent Engineering Systems Through Artificial Neural Networks" ASME Press 2006
56 Grabot, B., "Dispatching rules in scheduling : A fuzzy approach" 32 (32): 903-915, 1994
57 Amiri, A., "Designing a distribution network in a supply chain system : formulation and efficient solution procedure" 171 (171): 567-576, 2004
58 Bukchin, J., "Design of flexible assembly line to minimize equipment cost" 32 : 585-598, 2000
59 Rubinovitz, J., "Design and balancing of robotic assembly lines" 1991
60 Scholl, A., "Data of Assembly Line Balancing Problems, Schriften zur Quantitativen Betriebswirtschaftslehre 16/93, Th Darmstadt"
61 Yang, S., "Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling" 11 (11): 474-486, 2000
62 Soukhal, A., "Complexity of flow shop scheduling problems with transportation constraints" 161 : 32-41, 2005
63 Miltenburg, J., "Balancing and sequencing mixed-model U-shaped production lines" 14 : 119-151, 2002
64 Scholl, A., "Balancing and Sequencing of Assembly Lines"
65 Rekiek, B., "Assembly line design : The balancing of mixed-model hybrid assembly lines with genetic algorithms" Springer Series in Advanced Manufacturing 2006
66 Held, M., "Assembly line balancing-Dynamic programming with precedence constraints" 11 : 442-459, 1963
67 Leu, Y. Y., "Assembly line balancing using genetic algorithms with heuristic generated initial populations and multiple criteria" 15 : 581-606, 1994
68 Sabuncuoglu, I., "Assembly line balancing using genetic algorithms" 11 (11): 295-310, 2000
69 Bowman, E. H., "Assembly line balancing by linear programming" 8 (8): 385-389, 1960
70 Kacem, I., "Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Trans" 32 (32): 1-13, 2002
71 Kacem, I., "Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Trans" 32 (32): 1-13, 2002
72 Bautista, J., "Ant algorithms for assembly line balancing" 2463 : 65-75, 2002
73 Mati, Y., "An integrated greedy heuristic for a flexible job shop scheduling problem" 4 : 2534-2539, 2001
74 Xia, W., "An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem" 48 : 409-425, 2005
75 Nowicki, E., "An advanced tabu search algorithm for the job-shop problem" 8 (8): 145-159, 2005
76 Moon, C., "Advanced planning and scheduling based on precedence and resource constraints for e-plant chains" 42 (42): 2941-2955, 2004
77 Eck, M., "Advanced Planning and Scheduling"
78 Okamoto, A., "APS system based on scheduler moGA and XML" 17 (17): 15-24, 2005
79 Okamoto, A., "APS System based on Scheduler moGA and XML" 17 (17): 15-24, 2005
80 Cheng, R., "A tutorial survey of job-shop scheduling problems using genetic algorithms, part II : hybrid genetic Search Strategies" 36 (36): 343-364, 1999
81 Cheng, R., "A tutorial survey of job-shop scheduling problems using genetic algorithm, part I : representation" 30 (30): 983-997, 1996
82 Becker, C., "A survey on problems and methods in generalized assembly line balancing" 168 : 694-715, 2006
83 Erel, E., "A survey of the assembly line balancing procedures" 9 : 414-434, 1998
84 Baybars, I., "A survey of exact algorithms for the simple assembly line balancing problem" 32 : 909-932, 1986
85 Yan, H., "A strategic model for supply chain design with logical constraints: formulation and solution" 30 (30): 2135-2155, 2003
86 Altiparmak, F., "A steady-state genetic algorithm for multi-product supply chain network design" 2007
87 Jain A. S., "A state-of -the-art review of job-shop scheduling techniques, technical report" department of applied physics, Electronics and Mechanical Engineering, University of Dundee 1998
88 Jayaraman, V., "A simulated annealing methodology to distribution network design and management" 144 : 629-645, 2003
89 Raa, B., "A robust dynamic planning strategy for lot-sizing problems with stochastic demands" 16 (16): 207-213, 2005
90 Ozmehmet Tasan, S., "A review of the current applications of genetic algorithms in assembly line balancing" 19 (19): 49-69, 2008
91 Sabri, E. H., "A multi-objective approach to simultaneous strategic and operational planning in supply chain design" 28 : 581-598, 2000
92 Chan, F. T. S., "A multi-criterion genetic algorithm for order distribution in a demand driven supply chain" 17 (17): 339-351, 2004
93 Najid, N. M., "A modified simulated annealing method for flexible job shop scheduling problem" 5 (5): 2002
94 Syam, S. S., "A model and methodologies for the location problem with logistical components" 29 : 1173-1193, 2002
95 Erol, I., "A methodology to support decision making across the supply chain of an industrial distributor" 89 : 119-129, 2004
96 Moscato, P., "A memetic approach for the traveling salesman problem : implementation of a computational ecology for combinatorial optimization on messagepassing systems" 1992
97 Krasnogor, N., "A memetic algorithm with self-adaptive local search : TSP as a case study" 987-994, 2000
98 Tan, W., "A linearized polynomial mixed integer programming model for the integration of process planning and scheduling" 15 (15): 593-605, 2004
99 Tsai, D. M., "A line-balanced-base capacity planning procedure for series type robotic assembly line" 31 : 1901-1920, 1993
100 Gao, J., "A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems" 53 (53): 149-162, 2007
101 Tavakkoli-Moghaddam, R., "A hybrid method for solving stochastic job shop scheduling problems" 170 (170): 185-206, 2005
102 Gao, J., "A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems" 35 (35): 2892-2907, 2008
103 Gonçalves, J. F., "A hybrid genetic algorithm for the job shop scheduling problem" 167 (167): 77-95, 2005
104 Chan, F. T. S., "A hybrid genetic algorithm for production and distribution" 33 : 345-355, 2004
105 Goncalves, J. F., "A hybrid genetic algorithm for assembly line balancing" 8 : 629-642, 2002
106 Noorul Haq, A., "A hybrid genetic algorithm approach to mixed-model assembly line balancing" 28 : 337-341, 2006
107 Dellaert, N., "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs" 68 : 241-257, 2000
108 Gen, M., "A genetic algorithm for two-stage transportation problem using priority-based encoding" 28 (28): 337-354, 2006
109 Levitin, G., "A genetic algorithm for robotic assembly line balancing" 168 : 811-825, 2006
110 Falkenauer, E., "A genetic algorithm for bin packing and line balancing" 1189-1192, 1992
111 Altiparmak, F., "A genetic algorithm approach for multiobjective optimization of supply chain networks" 51 (51): 197-216, 2006
112 Ghosh, S., "A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems" 27 : 637-670, 1989
113 Talbot, F. B., "A comparative evaluation of heuristic line balancing techniques" 32 : 430-454, 1986
114 Lopez, O., "A STEP-based manufacturing information system to share flexible manufacturing resources data" 16 (16): 287-301, 2005
115 Jackson, J. R., "A Computing Procedure for a Line Balancing Problem" 2 : 261-272, 1956
상황인지 컴퓨팅 환경에서 복합서비스를 제공하는 서비스시스템의 성능분석
지식 기반 서비스를 위한 사실 지향 온톨로지 기반의 프로세스 모델링 접근법
학술지 이력
| 연월일 | 이력구분 | 이력상세 | 등재구분 |
|---|---|---|---|
| 2021 | 평가 | 계속평가 신청대상 (등재유지) | |
| 2016-01-01 | 등재 | 우수등재학술지 선정 (계속평가) | |
| 2013-01-01 | 등재 | 등재학술지 유지 (기타) | ![]() |
| 2012-05-25 | 학술지명변경 | 외국어명 : Journal of the Korean Insitute of Industrial Engineers -> Journal of the Korean Institute of Industrial Engineers | ![]() |
| 2010-01-01 | 등재 | 등재학술지 유지 (등재유지) | ![]() |
| 2008-01-01 | 등재 | 등재학술지 유지 (등재유지) | ![]() |
| 2006-01-01 | 등재 | 등재학술지 유지 (등재유지) | ![]() |
| 2004-01-01 | 등재 | 등재학술지 유지 (등재유지) | ![]() |
| 2001-07-01 | 등재 | 등재학술지 선정 (등재후보2차) | ![]() |
| 1999-01-01 | 등재 | 등재후보학술지 선정 (신규평가) | ![]() |
학술지 인용정보
| 기준연도 | WOS-KCI 통합IF(2년) | KCIF(2년) | KCIF(3년) |
|---|---|---|---|
| 2016 | 0.65 | 0.65 | 0.66 |
| KCIF(4년) | KCIF(5년) | 중심성지수(3년) | 즉시성지수 |
| 0.56 | 0.47 | 1.026 | 0.14 |