RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI등재

    아웃소싱 전략을 활용하는 두 단계 흐름생산라인에서 완료시간의 총합을 최소화하는 일정계획문제

    한글로보기

    https://www.riss.kr/link?id=A101952296

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    We treats a job scheduling in a 2-machine flow-shop problem with outsourcing strategy allowed. Jobs in the first machine are processed in-house or outsourced to the other companies. In this paper, all the considered jobs are determined to be in-house processed or outsourced. When a job is outsourced, then the firm should pay an outsourcing cost additionally. We want to minimize the sum of the outsourcing costs and the total completion times of finished jobs. In this paper, some solution properties are characterized, and then some heuristic algorithms and a branch-and-bound solution algorithm are derived. This paper evaluates finally the performance of the proposed algorithms during the numerical tests.
    번역하기

    We treats a job scheduling in a 2-machine flow-shop problem with outsourcing strategy allowed. Jobs in the first machine are processed in-house or outsourced to the other companies. In this paper, all the considered jobs are determined to be in-house ...

    We treats a job scheduling in a 2-machine flow-shop problem with outsourcing strategy allowed. Jobs in the first machine are processed in-house or outsourced to the other companies. In this paper, all the considered jobs are determined to be in-house processed or outsourced. When a job is outsourced, then the firm should pay an outsourcing cost additionally. We want to minimize the sum of the outsourcing costs and the total completion times of finished jobs. In this paper, some solution properties are characterized, and then some heuristic algorithms and a branch-and-bound solution algorithm are derived. This paper evaluates finally the performance of the proposed algorithms during the numerical tests.

    더보기

    목차 (Table of Contents)

    • Abstract
    • 1. 서론
    • 2. 문제정의와 분석
    • 3. 휴리스틱 알고리즘들
    • 4. 분지한계법
    • Abstract
    • 1. 서론
    • 2. 문제정의와 분석
    • 3. 휴리스틱 알고리즘들
    • 4. 분지한계법
    • 5. 성능 평가
    • 6. 결론
    • 참고문헌
    더보기

    참고문헌 (Reference)

    1 이익선, "아웃소싱 전략을 활용하는 두 단계 흐름생산라인의 일정계획" 한국산업경영시스템학회 37 (37): 113-121, 2014

    2 Lee, K., "Two-stage production scheduling with an outsourcing option" 213 (213): 489-497, 2011

    3 Qi, X., "Two-stage production scheduling with an option of outsourcing from a remote supplier" 18 (18): 1-15, 2009

    4 Choi, B.C., "Two-machine flow shop scheduling problem with an outsourcing option" 213 (213): 66-72, 2011

    5 Offodile, O.F., "The Virtual Manufacturing Paradigm : The Impact of IT/IS Outsourcing on Manufacturing Strategy" 75 (75): 147-159, 2002

    6 Kouvelis, P., "Supply Chain Capacity and Outsourcing Decisions : the Dynamic Interplay of Demand and Supply Uncertainty" 34 (34): 717-728, 2002

    7 Lee, I.S., "Single Machine Scheduling with Outsourcing Allowed" 111 (111): 623-634, 2008

    8 Chung, D.Y., "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems" 226 (226): 46-52, 2013

    9 Qi, X., "Outsourcing and production scheduling for a two-stage flowshop" 129 (129): 43-50, 2011

    10 Lee, I.S., "Minimizing Due Date Related Measures for a Single Machine Scheduling with Outsourcing Allowed" 186 (186): 931-952, 2008

    1 이익선, "아웃소싱 전략을 활용하는 두 단계 흐름생산라인의 일정계획" 한국산업경영시스템학회 37 (37): 113-121, 2014

    2 Lee, K., "Two-stage production scheduling with an outsourcing option" 213 (213): 489-497, 2011

    3 Qi, X., "Two-stage production scheduling with an option of outsourcing from a remote supplier" 18 (18): 1-15, 2009

    4 Choi, B.C., "Two-machine flow shop scheduling problem with an outsourcing option" 213 (213): 66-72, 2011

    5 Offodile, O.F., "The Virtual Manufacturing Paradigm : The Impact of IT/IS Outsourcing on Manufacturing Strategy" 75 (75): 147-159, 2002

    6 Kouvelis, P., "Supply Chain Capacity and Outsourcing Decisions : the Dynamic Interplay of Demand and Supply Uncertainty" 34 (34): 717-728, 2002

    7 Lee, I.S., "Single Machine Scheduling with Outsourcing Allowed" 111 (111): 623-634, 2008

    8 Chung, D.Y., "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems" 226 (226): 46-52, 2013

    9 Qi, X., "Outsourcing and production scheduling for a two-stage flowshop" 129 (129): 43-50, 2011

    10 Lee, I.S., "Minimizing Due Date Related Measures for a Single Machine Scheduling with Outsourcing Allowed" 186 (186): 931-952, 2008

    11 Ngwenyama, O.K., "Making the Information Systems Outsourcing Decision : A Transaction Cost Approach to Analyzing Outsourcing Decision Problems" 115 (115): 351-367, 1999

    12 Tarakci, H., "Maintenance Outsourcing of a Multiprocess Manufacturing System with Multiple Contractors" 38 (38): 67-78, 2006

    13 Huiskonen, J., "Lateral Coordination in a Logistics Outsourcing Relationship" 78 (78): 177-185, 2002

    14 Tarakci, H., "Incentive Maintenance Outsourcing Contracts for Channel Coordination and Improvement" 38 (38): 671-684, 2006

    15 Kim, B., "Dynamic Outsourcing to Contract Manufacturers with Different Capabilities of Reducing the Supply Cost" 86 (86): 63-80, 2003

    16 Dekkers, R., "Decision Models for Outsourcing and Core Competencies in Manufacturing" 38 (38): 4085-4096, 2000

    17 Neto, R.F.T., "An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed" 38 (38): 1286-1293, 2011

    18 Wu, F., "An Outsourcing Decision Model for Sustaining Long-term Performance" 43 (43): 2513-2535, 2005

    19 Yang, J., "A Productioninventory System with Markovian Capacity and Outsourcing Option" 53 (53): 328-349, 2005

    20 Abdel-Malek, L., "A Framework for Comparing Outsourcing Strategies in Multi-layered Supply Chains" 97 (97): 318-328, 2005

    더보기

    동일학술지(권/호) 다른 논문

    동일학술지 더보기

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    인용정보 인용지수 설명보기

    학술지 이력

    학술지 이력
    연월일 이력구분 이력상세 등재구분
    2027 평가 재인증평가 신청대상 (재인증)
    2021-01-01 등재 등재학술지 유지 (재인증) KCI등재
    2018-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2015-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2011-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2009-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2007-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2005-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2002-01-01 등재 등재학술지 선정 (등재후보2차) KCI등재
    1999-07-01 등재 등재후보학술지 선정 (신규평가) KCI등재후보
    더보기

    학술지 인용정보

    학술지 인용정보
    기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
    2016 0.59 0.59 0.62
    KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
    0.63 0.63 0.998 0.07
    더보기

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼