RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      Andong Dam Multi-Purpose Development Project: Report on the Reservoir Operation and the Water Utilization Program

      한글로보기

      https://www.riss.kr/link?id=G3636112

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      목차 (Table of Contents)

      • 1. INTRODUCTION
      • 2. WATER SUPPLY MODEL AND SYSTEM
      • 2.1 Water Supply Model for the Andong Dam Project
      • 2.1.1 Theoretical Model
      • 2.1.2 Simplification of Model
      • 1. INTRODUCTION
      • 2. WATER SUPPLY MODEL AND SYSTEM
      • 2.1 Water Supply Model for the Andong Dam Project
      • 2.1.1 Theoretical Model
      • 2.1.2 Simplification of Model
      • 2.2 Water Supply System and Deficit
      • 2.2.1 Local Inflow from Tributaries
      • 2.2.2 Effective Rainfall
      • 2.2.3 Withdrawal of Water along Main Stream
      • 2.2.4 Release of Water from the Andong Dam
      • 2.2.5 Forecasting Procedures of Releasing Water from Andong Dam
      • 2.2.6 Forecast of Releasing Water for the Year 1981
      • 2.2.7 Forecast of Releasing Water for the Year 1984
      • 2.2.8 Calculation of Releasing Water
      • 2.3 Reservoir Operation
      • 2.3.1 General
      • 2.3.2 Obtainable Information
      • 2.3.3 Operation Method
      • 3. Method of Charging fee and reasonable prices of water
      • 3.1 Basic Conception in Charging Fee
      • 3.2 Project Costs and Allocation
      • 3.2.1 Revised Project Cost
      • 3.2.2 Cost Allocation
      • 3.3 Price of Irrigation Water
      • 3.3.1 Need of Policy
      • 3.3.2 Price of Irrigation Water
      • 3.4 Price of M & I Water
      • 3.4.1 General
      • 3.4.2 Price based on allocation cost
      • 3.4.3 Price based on fair return principle
      • 3.4.4 Price based on alternative cost
      • 4. ORGANIZATION AND MANAGEMENT SYSTEM
      • 4.1 Extension of Head Offices Activities
      • 4.2 Andong Dam Management Office
      • ANNEXES
      • ANNEX 1. Table for Sec. 2.2.6 (From Table 1.1 to Table 1.9)
      • ANNEX 2. Table for Sec. 2.2.7 (From Table 2.1 to Table 2.8)
      • ANNEX 3. GUIDELINE FOR FLOW FORECAST AND WATER RELEASE
      • ANNEX 4. FARM BUDGET
      • ANNEX 5. PROVISIONAL RULES OF OPERATION AND MAINTENANCE FOR THE FACILITIES OF THE ANDONG DAM
      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼