This study investigates the effect of ground improvement on the performance of port structures, with a particular focus on the lower clay layer situated beneath the intermediate sand stratum within the deep alluvial deposits of the Nakdong River. To t...
This study investigates the effect of ground improvement on the performance of port structures, with a particular focus on the lower clay layer situated beneath the intermediate sand stratum within the deep alluvial deposits of the Nakdong River. To this end, a comprehensive review was conducted on previous research concerning the depositional history and geotechnical characteristics of the deep alluvial sediments, as well as studies addressing the long-term settlement behavior of the underlying unimproved clay layer. Specifically, at the Busan North Port (Dongsam) International Cruise Terminal, the deep cement mixing (DCM) method applied as the ground improvement for the constructed block-type revetment was originally planned to improve the clay layer beneath the intermediate sand layer. However, in actual construction, the DCM columns were installed only within the intermediate sand layer leaving the underlying clay layer untreated. As a result, continuous displacement and structural damage occurred over time. The causes of the structural damage were investigated through site investigations including borehole drilling, elastic wave tomography and borehole imaging. Additionally, by analyzing the instrumentation data measured at the time of structural displacement along with settlement and structural deformation calculated through stress-strain numerical simulations, this study aimed to evaluate the effect of ground improvement of the lower clay layer beneath the intermediate sand stratum within the deep alluvial deposits of the Nakdong River on the performance of port structures. In the 80-meter extension section of the Busan North Port (Dongsam) International Cruise Terminal, both an intermediate sand layer and an underlying clay layer were identified. The N-values of the upper clay layer were found to be 0/30, those of the intermediate sand layer ranged from 4/30 to 33/30, and those of the lower clay layer ranged from 0/30 to 3/30. The thickness of the intermediate sand layer was identified to be approximately 7.2 to 8.7 meters, while the thickness of the lower clay layer was found to range from 3 to 6 meters. In the original design, ground improvement was planned to target the clay layer beneath the intermediate sand layer. However, during actual construction, the deep cement mixing (DCM) columns were installed only within the intermediate sand layer, leaving the underlying clay layer untreated. As a result, continuous displacement and structural damage occurred over time. The causes of the structural damage were identified through geotechnical investigations, including borehole drilling, elastic wave tomography, and borehole imaging. Settlement analysis indicated that the consolidation settlement of the lower clay layer beneath the intermediate sand continued over time, resulting in cracks in the capping concrete. However, despite the ground settlement, the measured settlement at the top of the capping concrete appeared to converge due to the interlocking effect of the WAROCK blocks. Later, the interlocking effect was lost as the WAROCK blocks became dislodged, causing a rapid settlement of the capping concrete. This settlement then converged with the calculated values from settlement and stress-strain numerical analyses. As the interlocking behavior of the blocks could not be simulated in the stress-strain analysis, the convergence of the measured and calculated values confirmed the reliability of the numerical analysis results. To ensure the stability of the port structures, additional ground improvement was planned for the target soil layer, and the jet grouting method was applied. The improvement depth covered the entire lower portion beneath the upper short column array of the deep cement mixing (DCM) method. After applying jet grouting, borehole investigations, elastic wave tomography, and uniaxial compressive strength tests on the improved soil were conducted to verify the quality of the treatment. This study investigated the effects of the lower clay layer beneath the intermediate sand stratum on port structures. It was verified through field instrumentation and stress-strain analyses that when a soft clay layer is present beneath the intermediate sand and remains unimproved, consolidation settlement in the lower clay layer over time can cause damage to port structures. By studying the correlation between the thickness of the clay layer in the middle sand layer located in the deep deposition section of the Nakdonggang River and the residual amount of subsidence to secure the stability of port structures and port background sites, the effect of the thickness of the lower clay layer on stability was studied, and based on this, reasonable maintenance guidelines for port structures and port background sites were proposed if the lower clay layer was not improved. The deep alluvial deposits of the Nakdong River extensively contain an intermediate sand layer and a lower clay layer beneath the upper clay layer; however, research on the lower clay layer remains insufficient. Therefore, further studies on the distribution, thickness, and physical and mechanical properties of the lower clay layer are considered necessary.