RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    복합산업단지 프로젝트 파이낸싱(PF) 평가지표 개발

    한글로보기

    https://www.riss.kr/link?id=T13476231

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    South Korea has joined the ranks of advanced nations relatively fast, with GDP of $20,000, as a result of government-driven industrial complex development after being devastated by a war. In fact, industrial complex is not only a core engine of national economy that facilitates rapid economic growth but also an ever-lasting economic development tool, as a hub of local economic growth. However, the reckless industrial complex development driven by local governments, which has been pursued as a growth engine of local communities ever since local self-governing system was enforced in 1995, has deteriorated due to funding issues of many businesses; it has been caused by sluggish real estate market in Korea, along with 2008 global financial crisis, undermining the administrative reliability. Thus, project financing (PF) method for public-private joint industrial complex development with the 3rd sector scheme using the funding of private financial institutions has been established as a new trend, garnering a lot of attention recently. Therefore, this study has conducted the following: identifying the issues with existing stagnant policies on industrial land usage, which has failed to reflect the changes in industrial environment; re-establishing the concept of industrial complex, based on integrative, complex ideas, such as multi-functionality of land usage crucial for recent industrial complex and diversification of business entities; presenting key factors to be considered as to funding for future industrial complex by establishing evaluation-related factors of PF, a method of securing funding which has been introduced actively in Korea since its major financial crisis through FGI and AHP and developing and verifying applicable standards.
    This study is largely divided into the following three steps. First, preliminary indicators were selected through a case study and literature study, and final indictors were selected through expert consulting. Second, standards on industrial complex were established by applying the weight of indicators through AHP. Third, actual cases were verified to check the indicators that should be considered for future planning of industrial complex development. As for major preliminary indicators, a total of 13 fields including the following were evaluated, which were established as 38 evaluation items and 81 detailed items: risk review; preservation of bond claims; basic evaluation of target site; feasibility study; business performance evaluation; basic evaluation of investor protection plans. The established preliminary indicators were used as a basis for focus group interview (FGI) with experts of financial institutions, construction companies, credit rating agencies, and government agencies. Afterwards, final evaluation indicators were selected. To measure the importance among evaluation indicators, a hierarchical and analytic decision-making technique called AHP (Analytic Hierarchy Process) was utilized, and a 7-point Likert scale was used to measure the importance among the indicators by field, item, and detailed evaluation element, which were evaluated with pair-wise comparison. As a result, 7 evaluation fields (appropriateness of target site, suitability of business provider and site, marketability of products, financial stability, credit enhancement method, investor protection, step-by-step risk review items), 17 evaluation items, and 58 evaluation elements were established.
    The importance ranking of evaluation elements was measured in the following order: marketability of products; credit enhancement method; financial stability; appropriateness of business environment and target site. When the survey results were applied to actual public-private joint industrial complex development, successful groups scored an average of 867 out of 1,000, and failed groups scored an average of 613, indicating a difference of 254. Among the evaluation fields, difference in importance was measured in the following order: credit enhancement method (difference of 111 points) and marketability of products (difference of 74 points). What is noteworthy is that feasibility study, which was expected to be most important, showed the smallest difference of 5.5 points. Such results indicate the following: From the perspective of financial investors, the most highly valued element in the PF evaluation is bond recovery as to loans provided or market competitiveness and marketability for securitization (exit) after completion of construction, rather than uncertain quantitative business feasibility values of the future.
    Although this study has limitations in terms of indicator verification and application, given that there are a limited number of domestic public-private joint industrial complex development cases (8), the findings could contribute to solving problems by establishing the factors of relationships among participants in the public-private joint industrial complex development, which is at a standstill. Also, this study is highly significant in that it can boost the predictability of sustainable business feasibility by reflecting the results from business planning stage for financial institutions and public (local governments) and private corporations preparing for industrial complex development, by quantifying the PF evaluation standards in connection with industrial complex development financing.
    번역하기

    South Korea has joined the ranks of advanced nations relatively fast, with GDP of $20,000, as a result of government-driven industrial complex development after being devastated by a war. In fact, industrial complex is not only a core engine of nation...

    South Korea has joined the ranks of advanced nations relatively fast, with GDP of $20,000, as a result of government-driven industrial complex development after being devastated by a war. In fact, industrial complex is not only a core engine of national economy that facilitates rapid economic growth but also an ever-lasting economic development tool, as a hub of local economic growth. However, the reckless industrial complex development driven by local governments, which has been pursued as a growth engine of local communities ever since local self-governing system was enforced in 1995, has deteriorated due to funding issues of many businesses; it has been caused by sluggish real estate market in Korea, along with 2008 global financial crisis, undermining the administrative reliability. Thus, project financing (PF) method for public-private joint industrial complex development with the 3rd sector scheme using the funding of private financial institutions has been established as a new trend, garnering a lot of attention recently. Therefore, this study has conducted the following: identifying the issues with existing stagnant policies on industrial land usage, which has failed to reflect the changes in industrial environment; re-establishing the concept of industrial complex, based on integrative, complex ideas, such as multi-functionality of land usage crucial for recent industrial complex and diversification of business entities; presenting key factors to be considered as to funding for future industrial complex by establishing evaluation-related factors of PF, a method of securing funding which has been introduced actively in Korea since its major financial crisis through FGI and AHP and developing and verifying applicable standards.
    This study is largely divided into the following three steps. First, preliminary indicators were selected through a case study and literature study, and final indictors were selected through expert consulting. Second, standards on industrial complex were established by applying the weight of indicators through AHP. Third, actual cases were verified to check the indicators that should be considered for future planning of industrial complex development. As for major preliminary indicators, a total of 13 fields including the following were evaluated, which were established as 38 evaluation items and 81 detailed items: risk review; preservation of bond claims; basic evaluation of target site; feasibility study; business performance evaluation; basic evaluation of investor protection plans. The established preliminary indicators were used as a basis for focus group interview (FGI) with experts of financial institutions, construction companies, credit rating agencies, and government agencies. Afterwards, final evaluation indicators were selected. To measure the importance among evaluation indicators, a hierarchical and analytic decision-making technique called AHP (Analytic Hierarchy Process) was utilized, and a 7-point Likert scale was used to measure the importance among the indicators by field, item, and detailed evaluation element, which were evaluated with pair-wise comparison. As a result, 7 evaluation fields (appropriateness of target site, suitability of business provider and site, marketability of products, financial stability, credit enhancement method, investor protection, step-by-step risk review items), 17 evaluation items, and 58 evaluation elements were established.
    The importance ranking of evaluation elements was measured in the following order: marketability of products; credit enhancement method; financial stability; appropriateness of business environment and target site. When the survey results were applied to actual public-private joint industrial complex development, successful groups scored an average of 867 out of 1,000, and failed groups scored an average of 613, indicating a difference of 254. Among the evaluation fields, difference in importance was measured in the following order: credit enhancement method (difference of 111 points) and marketability of products (difference of 74 points). What is noteworthy is that feasibility study, which was expected to be most important, showed the smallest difference of 5.5 points. Such results indicate the following: From the perspective of financial investors, the most highly valued element in the PF evaluation is bond recovery as to loans provided or market competitiveness and marketability for securitization (exit) after completion of construction, rather than uncertain quantitative business feasibility values of the future.
    Although this study has limitations in terms of indicator verification and application, given that there are a limited number of domestic public-private joint industrial complex development cases (8), the findings could contribute to solving problems by establishing the factors of relationships among participants in the public-private joint industrial complex development, which is at a standstill. Also, this study is highly significant in that it can boost the predictability of sustainable business feasibility by reflecting the results from business planning stage for financial institutions and public (local governments) and private corporations preparing for industrial complex development, by quantifying the PF evaluation standards in connection with industrial complex development financing.

    더보기

    목차 (Table of Contents)

    • 제1장 서 론 1
    • 제1절 연구의 배경 및 목적 1
    • 제2절 연구의 방법 및 흐름 3
    • 제2장 이론적 고찰 6
    • 제1장 서 론 1
    • 제1절 연구의 배경 및 목적 1
    • 제2절 연구의 방법 및 흐름 3
    • 제2장 이론적 고찰 6
    • 제1절 복합산업단지 6
    • 1. 복합개발 개념 및 유형 6
    • 2. 복합산업단지의 개념 재정립 10
    • 3. 복합산업단지 추진현황 14
    • 제2절 PF 평가 20
    • 1. PF 이론적 고찰 20
    • 2. PF 평가시스템 34
    • 제3절 선행연구의 검토 45
    • 1. 민관합작 PF사업에 관한 연구 45
    • 2. PF 평가지표에 관한 연구 52
    • 3. 선행연구와의 차별성 54
    • 제3장 복합산업단지 개발실태 분석 55
    • 제1절 산업단지 주요내용과 계획지표 55
    • 1. 산업단지 개발제도 55
    • 2. 산업단지 개발계획 주요내용 56
    • 3. 산업단지 개발계획 수립지표 및 기준 60
    • 제2절 복합산업단지 개발사례 64
    • 1. 복합산업단지 국내 개발사례 65
    • 2. 복합산업단지 국외 개발사례 82
    • 3. 국내/외 복합산업단지 개발시사점 89
    • 제3절 복합산업단지 계획 및 개발지표 91
    • 1. 복합산업단지 계획지표 91
    • 2. 복합산업단지 개발지표 92
    • 3. 복합산업단지 적용 계획․개발사례 도출지표 93
    • 제4장 PF평가지표 개발 97
    • 제1절 PF 평가지표 개발 97
    • 1. PF 예비평가 지표 97
    • 2. PF 최종평가 지표 115
    • 제2절 PF 평가지표 적용 133
    • 1. 평가지표 적용 133
    • 2. 평가지표 중요도 및 평가배점체계 산정 140
    • 3. 사례적용을 위한 적용지표기준 개발 149
    • 4. 사례적용 164
    • 제5장 결론 및 정책적 시사점 170
    • 제1절 연구결과의 요약 170
    • 제2절 정책적 시사점 174
    • 제3절 연구의 의의와 한계 175
    • <참고문헌> 177
    • <부 록> 185
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼