RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    Preliminary Feasibility Report on the Long-Term Multipurpose Dam Schemes (Second Stage) VOL.1(Main Report)

    한글로보기

    https://www.riss.kr/link?id=G3627044

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수

    부가정보

    목차 (Table of Contents)

    • GLOSSARY
    • CONVERSION FACTORS AND ABBREVIATION
    • SUMMARY OF CONCLUSIONS AND RECOMMANDATIONS
    • 1. INTRODUCTION
    • 1.1 The Preliminary Feasibility Study
    • GLOSSARY
    • CONVERSION FACTORS AND ABBREVIATION
    • SUMMARY OF CONCLUSIONS AND RECOMMANDATIONS
    • 1. INTRODUCTION
    • 1.1 The Preliminary Feasibility Study
    • 1.2 The first Stage of the Study
    • 1.3 The Second Stage of the Study
    • 1.4 The Final Report
    • 2. BACKGROUND
    • 2.1 Land and Population
    • 2.2 Economy of Korea
    • 2.3 Agriculture in Korea
    • 2.4 Infrastructure
    • 2.5 Water Resources Development
    • 2.6 Rationale of the Study
    • 3. THE THREE RIVER BASINS
    • 3.1 River Systems
    • 3.2 Climate
    • 3.3 Hydrology
    • 3.4 Soils
    • 3.5 Regional
    • 3.6 Cities and M&l Water Supply
    • 4. PROSPECTIVE LAND AND WATER RESOURCES DEVELOPMENT
    • 4.1 Agricultural Land Development
    • 4.2 Cropping System and Irrigation Water Requirement
    • 4.3 M&l Water Demand Projection
    • 4.4 River Maintenance Flow
    • 4.5 Power Market
    • 5. WATER BUDGET
    • 5.1 Methodology
    • 5.2 Assumptions
    • 5.3 Division of Basins
    • 5.4 Measured Flow
    • 5.5 Results
    • 6. RESERVOIR OPERATION
    • 6.1 Operation Methods
    • 6.2 Operation of Existing Dams
    • 6.3 Commission of Time of Proposed Dams
    • 6.4 Operation of Proposed Dams
    • 6.5 Target Year
    • 7. DESIGN AND COST ESTIMATE
    • 7.1 Alternative Scale Setting
    • 7.2 Design Criteria
    • 7.3 Cost Estimate Criteria
    • 7.4 Bamseonggol Dam
    • 7.5 Inje Dam
    • 7.6 Hongcheon Dam
    • 7.7 Gujeol Dam
    • 7.8 Dalcheon Dam
    • 7.9 Ganhyeon Dam
    • 7.10 Bonghwa Dam
    • 7.11 Imha Dam
    • 7.12 Hamyang Dam
    • 7.13 Juam Dam
    • 8. AGRICULTURAL BENEFIT
    • 8.1 Prospective Crop Yield
    • 8.2 Gross and Net Production Values
    • 8.3 Cost of Irrigation Facilities
    • 8.4 Net Incremental Benefit
    • 8.5 Production Foregone
    • 9. FOOD CONTROL BY THE PROPOSED DAMS
    • 9.1 Flood Inflow into Damsites
    • 9.2 Flood Control Effect by the Proposed Dams
    • 9.3 FLood Control Benefit
    • 10. COSTS OF ALTERNATIVE M&I WATER SUPPLY DAMS
    • 10.1 M&l Water Supply Alternative Dam
    • 10.2 M&l Water Supply Benefit
    • 11. COST OF ALTERNATIVE POWER FACILITIES
    • 12. ECONOMIC ANALYSIS
    • 12.1 Benefits
    • 12.2 Costs
    • 12.3 Optimization Criteria
    • 12.4 Year of Commission
    • 12.5 Optimization of Flood Control Space
    • 12.6 Justification of Power Purpose
    • 12.7 Optimization of Size of Dam
    • 12.8 Internal Rate of Return
    • 12.9 Remarks to the Estimated ElRR
    • 12.10 Semi-Variable Draft Operation
    • 13. CONSIDERATION ON PRIORITY OF THE PROPOSED DAMS
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼