RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI우수등재 SCOPUS

    事務所建物 空調設備의 豫防保全 最適點檢周期가 信賴性向上 및 期待利益에 미치는 영향 = Influence of the Optimal Preventive Maintenance Inspection Period on Reliability Improvement and Expected Profit for Air-Conditioning Facilities in Office Building

    한글로보기

    https://www.riss.kr/link?id=A45050806

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    In this study, using Monte Carlo simulation about inspection model applied practically in air-conditioning facilities of office building, the optimal preventive maintenance inspection period is suggested to improve the reliability of the units, and effect on expected profit of optimal preventive maintenance inspection period is computed. The main results of this study are summarized as follows:
    1) Simulation program for sensitivity analysis and optimal preventive maintenance inspection period is made, in order to execute precisely sensitivity analysis of maintenance factors, by using Monte Carlo simulation's flow chart and compute optimal preventive maintenance inspection period.
    2) Using models for the relationship between reliability and inspection frequency per unit time and model between inspection and expected profit of preventive maintenance by CBM, the optimal preventive maintenance inspection period of air-conditioning facilities is computed, and it is revealed that the range of that is 90∼175 hr and, correlation curve of the original MTBF and optimal preventive maintenance inspection period by CBM is derived.
    3) And effect on expected profit of preventive maintenance's activity by optimal preventive maintenance inspection period is computed. It is found that the larger the original MTBF, like MTBF of centrifugal compression chiller and AHU is, and the smaller the expected profit increased, and the smaller the original MTBF, like MTBF of boiler, absorption chiller and turbo case cooling tower is, and larger the expected profit increased.
    번역하기

    In this study, using Monte Carlo simulation about inspection model applied practically in air-conditioning facilities of office building, the optimal preventive maintenance inspection period is suggested to improve the reliability of the units, and ef...

    In this study, using Monte Carlo simulation about inspection model applied practically in air-conditioning facilities of office building, the optimal preventive maintenance inspection period is suggested to improve the reliability of the units, and effect on expected profit of optimal preventive maintenance inspection period is computed. The main results of this study are summarized as follows:
    1) Simulation program for sensitivity analysis and optimal preventive maintenance inspection period is made, in order to execute precisely sensitivity analysis of maintenance factors, by using Monte Carlo simulation's flow chart and compute optimal preventive maintenance inspection period.
    2) Using models for the relationship between reliability and inspection frequency per unit time and model between inspection and expected profit of preventive maintenance by CBM, the optimal preventive maintenance inspection period of air-conditioning facilities is computed, and it is revealed that the range of that is 90∼175 hr and, correlation curve of the original MTBF and optimal preventive maintenance inspection period by CBM is derived.
    3) And effect on expected profit of preventive maintenance's activity by optimal preventive maintenance inspection period is computed. It is found that the larger the original MTBF, like MTBF of centrifugal compression chiller and AHU is, and the smaller the expected profit increased, and the smaller the original MTBF, like MTBF of boiler, absorption chiller and turbo case cooling tower is, and larger the expected profit increased.

    더보기

    동일학술지(권/호) 다른 논문

    동일학술지 더보기

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼