    建設工事現場에서의 環境管理 實態와 改善方案 = Improvement of environment management at construction work site

    한글로보기

    https://www.riss.kr/link?id=T8875184

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    Due to the recent upgrade of the way-of-life, general people show a tendency to increase the quality of their life.
    In this regard, while the substantial increase of public complaints on the construction pollution such as noisy, vibration, air-pollution and etc. is the general tendency, there is no appropriate inducement for the decrease of the environmental pollution in the policy on the environmental restriction, and the governmental administration of the lean-to-one-side restriction policy leads to the alienation of the reality, so that the reform measure shall be taken urgently.
    To this end, we can find out and take a possible reform measure for the problems by studying and analyzing through the questions on the reality of management in the construction sites, which are generally practicing the real environment-factor-management system among the several phases of the construction environment-
    managements.
    After the analysis of the result, the standard of
    environmental restriction such as the quality of water, air, vibration, noisy and etc.
    is generally being observed, and the environment management is systematically implemented, while the following three problems are shown in the end.
    1. the construction-environment-management is carelessly handled regardless of the importance
    2. the problems on the security of the economic viability for the investment on the environment-cause-factor, which is continuously happening in the progress of the construction works with the air-field of 71.4% in checking & indicating aspects
    3. since the cost of 48% in the construction works is only
    incorporated into the contract amount, the non- incorporated additional cost is burdened to the client with the cost of only 27%, which is the main obstacles to implement the environment-friend construction business
    For the reform measure in this regard, the followings are proposed;
    1. the introduction of qualification system for the construction-environment-management and the upgrade of professionalism by the compulsory appointment of environment manager
    2. the expansion & standardization of the environment management cost for the inducement factor to decrease the environment pollution
    3. the introduction of construction-environment-index in enforcement of self-imposed environment management
    4. and the supplementation of the relevant rules incorporated with the special quality of construction business
    With these efforts for the supplementation of system, continuous educational training and publicity activities towards people, the advanced construction - environment-management and environment-friend construction business will be materialized in the near future.
    In addition, as a limitation in the process of implementing the study until now, the environmental surroundings in the whole process of construction business such as the studying, planning, engineering, construction and maintenance of the facilities should be secured for the implementation of the environment-friend construction business.
    However, this study have focused the qualitative study to come up with the reform measure by studying and analyzing the realities of the environment-management in the construction sites which are the last points of the whole process, so that it is the unavoidable limitation to secure the environmental surroundings in the studying, planning or engineering works. Also, even the standard of environmental restriction is being observed, it is studied that the complaints of 53.7% have happened, while this study could not find out the causes thereof.
    Should we find the alternative plan such as the enforcement of the restriction through the deep study on the complaint-casuse-factor,
    the construction business management will be advanced.

    번역하기

    Due to the recent upgrade of the way-of-life, general people show a tendency to increase the quality of their life. In this regard, while the substantial increase of public complaints on the construction pollution such as noisy, vibration, air-pollut...

    Due to the recent upgrade of the way-of-life, general people show a tendency to increase the quality of their life.
    In this regard, while the substantial increase of public complaints on the construction pollution such as noisy, vibration, air-pollution and etc. is the general tendency, there is no appropriate inducement for the decrease of the environmental pollution in the policy on the environmental restriction, and the governmental administration of the lean-to-one-side restriction policy leads to the alienation of the reality, so that the reform measure shall be taken urgently.
    To this end, we can find out and take a possible reform measure for the problems by studying and analyzing through the questions on the reality of management in the construction sites, which are generally practicing the real environment-factor-management system among the several phases of the construction environment-
    managements.
    After the analysis of the result, the standard of
    environmental restriction such as the quality of water, air, vibration, noisy and etc.
    is generally being observed, and the environment management is systematically implemented, while the following three problems are shown in the end.
    1. the construction-environment-management is carelessly handled regardless of the importance
    2. the problems on the security of the economic viability for the investment on the environment-cause-factor, which is continuously happening in the progress of the construction works with the air-field of 71.4% in checking & indicating aspects
    3. since the cost of 48% in the construction works is only
    incorporated into the contract amount, the non- incorporated additional cost is burdened to the client with the cost of only 27%, which is the main obstacles to implement the environment-friend construction business
    For the reform measure in this regard, the followings are proposed;
    1. the introduction of qualification system for the construction-environment-management and the upgrade of professionalism by the compulsory appointment of environment manager
    2. the expansion & standardization of the environment management cost for the inducement factor to decrease the environment pollution
    3. the introduction of construction-environment-index in enforcement of self-imposed environment management
    4. and the supplementation of the relevant rules incorporated with the special quality of construction business
    With these efforts for the supplementation of system, continuous educational training and publicity activities towards people, the advanced construction - environment-management and environment-friend construction business will be materialized in the near future.
    In addition, as a limitation in the process of implementing the study until now, the environmental surroundings in the whole process of construction business such as the studying, planning, engineering, construction and maintenance of the facilities should be secured for the implementation of the environment-friend construction business.
    However, this study have focused the qualitative study to come up with the reform measure by studying and analyzing the realities of the environment-management in the construction sites which are the last points of the whole process, so that it is the unavoidable limitation to secure the environmental surroundings in the studying, planning or engineering works. Also, even the standard of environmental restriction is being observed, it is studied that the complaints of 53.7% have happened, while this study could not find out the causes thereof.
    Should we find the alternative plan such as the enforcement of the restriction through the deep study on the complaint-casuse-factor,
    the construction business management will be advanced.

    더보기

    목차 (Table of Contents)

    • 목차
    • 제1장 서론 = 1
    • 제1절 연구의 배경 및 목적 = 1
    • 제2절 연구의 방범 및 범위 =3
    • 제2장 건설현장 환경법제 관련 이론적 고찰
    • 목차
    • 제1장 서론 = 1
    • 제1절 연구의 배경 및 목적 = 1
    • 제2절 연구의 방범 및 범위 =3
    • 제2장 건설현장 환경법제 관련 이론적 고찰
    • 제1절 건설공사 환경규제 관련 법규 = 8
    • 제2절 국가 환경행정체제 = 10
    • 제3절 건설환경 규제기준 = 12
    • 제3장 건설현장의 환경관리 실태
    • 제1절 건설현장의 환경관리 실무 = 22
    • 제2절 건설 환경관리 실태 = 28
    • 제4장 설문조사 분석
    • 제1절 조사분석의 개요 및 설계 = 40
    • 제2절 자료의 분석 = 41
    • 제3절 설문분석 결과의 비교 고찰 = 79
    • 제5장 정책적 대안
    • 제1절 건설환경관리의 전문성 제고 = 87
    • 제2절 환경관리비 계상기준 현실화 = 89
    • 제3절 건설환경지수관리제 도입 = 94
    • 제4절 건설업 특성을 반영한 관련 법규의 보완 = 104
    • 제6장 결론 = 106
    • 참고문헌 = 108
    • 영문초록 = 110
    • 부록 = 113
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼