      Study on the Experiences of Subsurface Soil Remediation at Commercial Nuclear Power Plants in the United States

      한글로보기

      https://www.riss.kr/link?id=A106287723

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

      Regulatory agency and licensee are preparing for the site restoration of Kori unit 1, the first commercial NPP in Korea, scheduled for 2031.
      Developing regulatory guidelines and strategies is essential for effective restoration work. Unfortunately, Korea does not have experience of site restoration of commercial NPPs. Therefore, it is important to review cases from experienced countries to establish a strategy and regulatory standards. The U.S. has had numerous soil remediation experiences using RESRAD and MARSSIM. However, formalized evaluation methodologies for subsurface soil have not yet been established in MARSSIM. This survey focused on subsurface soil remediation by reviewing the five decommissioned NPPs under regulation of the US NRC. Overall process of remediating a contaminated subsurface soil and groundwater was reviewed to identify considerations and lessons that could be applicable in Korea. In addition, an applied methodology for evaluation of contaminated subsurface soil and related major issues between regulatory agency and licensees were reviewed in detail to support establishment of remediation strategy for Kori unit 1.
      번역하기

      Regulatory agency and licensee are preparing for the site restoration of Kori unit 1, the first commercial NPP in Korea, scheduled for 2031. Developing regulatory guidelines and strategies is essential for effective restoration work. Unfortunately, Ko...

      Regulatory agency and licensee are preparing for the site restoration of Kori unit 1, the first commercial NPP in Korea, scheduled for 2031.
      Developing regulatory guidelines and strategies is essential for effective restoration work. Unfortunately, Korea does not have experience of site restoration of commercial NPPs. Therefore, it is important to review cases from experienced countries to establish a strategy and regulatory standards. The U.S. has had numerous soil remediation experiences using RESRAD and MARSSIM. However, formalized evaluation methodologies for subsurface soil have not yet been established in MARSSIM. This survey focused on subsurface soil remediation by reviewing the five decommissioned NPPs under regulation of the US NRC. Overall process of remediating a contaminated subsurface soil and groundwater was reviewed to identify considerations and lessons that could be applicable in Korea. In addition, an applied methodology for evaluation of contaminated subsurface soil and related major issues between regulatory agency and licensees were reviewed in detail to support establishment of remediation strategy for Kori unit 1.

      더보기

      참고문헌 (Reference)

      1 M. Garretson, "Violation Notice:Exelon Generation - Dresden Station"

      2 Consumers Energy Company, "Supporting Survey Report, Excavated Surface Release Record East TBC 1, Rev. 1"

      3 W. Sohn, "Status of Radiological Characteristics Evaluation and Future Plan of Kori Unit 1 (Korean)" 2018

      4 U.S. Nuclear Regulatory Commission, "Request for Additional Information WVDP Phase 1 Decommissioning Plan"

      5 J.B. Hickman, "Rancho Seco License Termination Plan_Chapter 2" Sacramento Municipal Utility District 2008

      6 S.B. Hong, "Practical Application of the MARSSIM Process to the Site Release of a Uranium Conversion Plant Following Decommissioning" 65 : 241-246, 2014

      7 NRC, "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), Rev. 1" U.S. Nuclear Regulatory Commission 2000

      8 U.S. Nuclear Regulatory Commission, "Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission - Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites"

      9 Maine Yankee Atomic Power Company, "Maine Yankee’s License Termination Plan, Rev. 5" MYAPC 2009

      10 N.J. Diaz, "Letter to Tom Ridge Provides an Update of Actions to The US NRC"

      1 M. Garretson, "Violation Notice:Exelon Generation - Dresden Station"

      2 Consumers Energy Company, "Supporting Survey Report, Excavated Surface Release Record East TBC 1, Rev. 1"

      3 W. Sohn, "Status of Radiological Characteristics Evaluation and Future Plan of Kori Unit 1 (Korean)" 2018

      4 U.S. Nuclear Regulatory Commission, "Request for Additional Information WVDP Phase 1 Decommissioning Plan"

      5 J.B. Hickman, "Rancho Seco License Termination Plan_Chapter 2" Sacramento Municipal Utility District 2008

      6 S.B. Hong, "Practical Application of the MARSSIM Process to the Site Release of a Uranium Conversion Plant Following Decommissioning" 65 : 241-246, 2014

      7 NRC, "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), Rev. 1" U.S. Nuclear Regulatory Commission 2000

      8 U.S. Nuclear Regulatory Commission, "Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission - Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites"

      9 Maine Yankee Atomic Power Company, "Maine Yankee’s License Termination Plan, Rev. 5" MYAPC 2009

      10 N.J. Diaz, "Letter to Tom Ridge Provides an Update of Actions to The US NRC"

      11 Exelon Generation Company, "LLC. Response to Request for Additional Information Related to Proposed 10 CFR 20.2002 Disposal Procedure"

      12 Connecticut Yankee Atomic Power Company, "Haddam Neck Plant License Termination Plan, Rev. 0"

      13 J. Donohew, "Haddam Neck Plant - Issuance of Amendment Re : Approval of License Termination Plan (LTP) TAC No. MA9791" U.S. Nuclear Regulatory Commission 2002

      14 Connecticut Yankee Atomic Power Company, "Haddam Neck Plant - Historical Site Assessment Supplement in Support of the License Termination Plan" CYAPCO 2001

      15 K. Kim, "Groundwater and Soil Remediation Guidelines for Nuclear Power Plants: Public Edition" Electric Power Research Institute 2011

      16 RETEC Group, Inc., "Groundwater Tritium Investigation Report―Dresden Generation Station, Morris, Illinois, Exelon Generation Submittal" 2005

      17 K.W. Lee, "Final Status of the Decommissioning of Research Reactors in Korea" 47 (47): 1227-1232, 2010

      18 K.F. Eckerman, "Federal Guidance Report No. 12. External Exposure to Radionuclides in Air, Water, and Soil" U.S. Environmental Protection Agency 1993

      19 C. Yu, "Development of Probabilistic RESRAD 6.0 and RESRAD-BUILD 3.0 Computer Codes" U.S. Nuclear Regulatory Commission 2000

      20 J.H. Yu, "Development of Historical Site Assessment (HSA) Procedure for Decommissioning Nuclear Power Plants" 2017

      21 R.B. Abu-Eid, "Decommissioning Survey and Site Characterization Issues and Lessons Learned" 292-314, 2012

      22 Nuclear Energy Institute, "Decommissioning Status for Shutdown U.S. Nuclear Plants"

      23 U.S. Nuclear Regulatory Commission, "Consolidated Decommissioning Guidance, Vol. 2, Rev. 1, NUREG-1757"

      24 S. Bushart, "Connecticut Yankee Decommissioning Experience Report―Detailed Experiences 1996-2006" Electric Power Research Institute 2006

      25 Consumers Energy Company, "Big Rock Point Restoration Project License Termination Plan, Rev. 1" 2004

      26 홍상범, "Application of MARSSIM for Final Status Survey of the Decommissioning Project" 한국방사성폐기물학회 9 (9): 107-111, 2011

      27 R.N. Stewart, "A Subsurface Decision Model for Supporting Environmental Compliance" U.S. Nuclear Regulatory Commission 2012

      28 R.N. Stewart, "A Geospatial Based Decision Framework for Extending MARSSIM Regulatory Principles into the Subsurface" University of Tennessee 2011

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2024 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2021-07-28 학술지명변경 한글명 : 방사성폐기물학회지 -> Journal of Nuclear Fuel Cycle and Waste Technology KCI등재
      2021-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2020-01-01 평가 등재학술지 유지 (재인증) KCI등재
      2017-01-01 평가 등재학술지 유지 (계속평가) KCI등재
      2014-08-07 학술지명변경 외국어명 : Journal of Nuclear Fuel Cycle and Waste Technology (Korean) -> Journal of Nuclear Fuel Cycle and Waste Technology KCI등재
      2013-11-26 학술지명변경 외국어명 : Journal of the Korean Radioactive Waste Society -> Journal of Nuclear Fuel Cycle and Waste Technology (Korean) KCI등재
      2013-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2010-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2009-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2008-01-01 평가 등재후보학술지 유지 (등재후보1차) KCI등재후보
      2006-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.17 0.17 0.17
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.15 0.16 0.409 0.08
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼