RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      EDCF차관(借款) 하의 개발도상국의 해외토목 설계 절차의 이해 = Understanding of procedural flow of overseas civil design works in developing countries under EDCF loans

      한글로보기

      https://www.riss.kr/link?id=A101503270

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      While performing the overseas projects in developing countries under EDCF loans with Korean civil design engineers as a project manager, I often used to find out and realize that lots of Korean engineers are not fully aware of what EDCF means and how EDCF funded projects are being implemented in developing countries. This implies that in the past, they have been concentrating on domestic projects only, not to mention have the rare opportunities to work in overseas projects. For these reasons, no wonder they neither pay a careful attention to the unfamiliar terms nor intend to try to realize them, even though such terms are fundamentals and important in overseas design works. With 'something will make it do'-like-attitude in our mind on site, nothing helps us at all. To help those who would like to understand and participate in overseas civil design works in developing countries under EDCF loans either as participants or as a future project manager, I introduce what EDCF means and how the procedure under these loans is being carried out, and they are briefly described herein this paper.
      번역하기

      While performing the overseas projects in developing countries under EDCF loans with Korean civil design engineers as a project manager, I often used to find out and realize that lots of Korean engineers are not fully aware of what EDCF means and how ...

      While performing the overseas projects in developing countries under EDCF loans with Korean civil design engineers as a project manager, I often used to find out and realize that lots of Korean engineers are not fully aware of what EDCF means and how EDCF funded projects are being implemented in developing countries. This implies that in the past, they have been concentrating on domestic projects only, not to mention have the rare opportunities to work in overseas projects. For these reasons, no wonder they neither pay a careful attention to the unfamiliar terms nor intend to try to realize them, even though such terms are fundamentals and important in overseas design works. With 'something will make it do'-like-attitude in our mind on site, nothing helps us at all. To help those who would like to understand and participate in overseas civil design works in developing countries under EDCF loans either as participants or as a future project manager, I introduce what EDCF means and how the procedure under these loans is being carried out, and they are briefly described herein this paper.

      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼