    TRIZ 방법을 이용한 설계VE 리스크 대응 프로세스 = Risk Response Process Using TRIZ Contradiction in Value Engineering

    한글로보기

    https://www.riss.kr/link?id=A109018779

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    Construction work is carried out with a number of risks arising from construction work in various fields, such as cost, construction period, and safety. Construction managers need to analyze and respond to these risks in advance. Therefore, it is necessary to identify uncertain threats and opportunity factors that may affect construction costs and duration before performing construction work and to respond to and manage risks in advance. This paper presents a theory of inventive problem solving (TRIZ), a contradiction-based risk response process that reduces construction design risks. This study was conducted in the following order: 1) collecting construction project risk data; 2) analyzing and classifying the risks; 3) statistical analysis of the risks; 4) presenting new risk management processes based on risk analysis results; and 5) evaluation of risk reduction. An analysis was conducted on the difference between the current and ideal states based on four risk factors, including displacement occurrence in excavation cross-sections and abnormal ground reaction patterns, and new alternatives were explored. The quantitative assessment revealed an improvement from 2.75 to 4.25 points, representing a risk reduction compared to the original design.
    번역하기

    Construction work is carried out with a number of risks arising from construction work in various fields, such as cost, construction period, and safety. Construction managers need to analyze and respond to these risks in advance. Therefore, it is nece...

    Construction work is carried out with a number of risks arising from construction work in various fields, such as cost, construction period, and safety. Construction managers need to analyze and respond to these risks in advance. Therefore, it is necessary to identify uncertain threats and opportunity factors that may affect construction costs and duration before performing construction work and to respond to and manage risks in advance. This paper presents a theory of inventive problem solving (TRIZ), a contradiction-based risk response process that reduces construction design risks. This study was conducted in the following order: 1) collecting construction project risk data; 2) analyzing and classifying the risks; 3) statistical analysis of the risks; 4) presenting new risk management processes based on risk analysis results; and 5) evaluation of risk reduction. An analysis was conducted on the difference between the current and ideal states based on four risk factors, including displacement occurrence in excavation cross-sections and abnormal ground reaction patterns, and new alternatives were explored. The quantitative assessment revealed an improvement from 2.75 to 4.25 points, representing a risk reduction compared to the original design.

    더보기

    참고문헌 (Reference)

    1 SAVE International, "Value Standard and Body of Knowledge"

    2 CALTRAN, "Value Analysis Team Guide" California Department of Transportation, Division of Design Office of Special Projects

    3 D. Y. Kim, "Risk Management for International Construction Projects : A New Paradigm" 51-53, 2011

    4 J. K. Im, "Risk Management for Design and Construction" Korea Institute of Construction Engineering and Management 2015

    5 H. M. . Kim, "Introduction to Risk Management with Samsung Construction Co" 10 (10): 21-23, 2009

    6 J. H. Park, "Improvement of a VE Alternative Ideas Evaluation Method through Risk Evaluation Process"" 9 (9): 32-43, 2018

    7 Ministry of Land, Infrastructure and Transport, "Construction Design Value Engineering Process Manual" Team of Construction and Environment

    8 I. Heo, "A Hi-Value Process Establishment for Efficient Implement of Design Value Engineering in Highway" 12 (12): 36-48, 2011

    9 안상현, "A Case Study of the Risk Identification in Construction Project" 16 (16): 15-24, 2015

    10 G. S. Altshuller, "40 Principles : TRIZ Keys to Technical Innovation(translated by Lev Shulyak)" Technical Innovation Center 1998

    1 SAVE International, "Value Standard and Body of Knowledge"

    2 CALTRAN, "Value Analysis Team Guide" California Department of Transportation, Division of Design Office of Special Projects

    3 D. Y. Kim, "Risk Management for International Construction Projects : A New Paradigm" 51-53, 2011

    4 J. K. Im, "Risk Management for Design and Construction" Korea Institute of Construction Engineering and Management 2015

    5 H. M. . Kim, "Introduction to Risk Management with Samsung Construction Co" 10 (10): 21-23, 2009

    6 J. H. Park, "Improvement of a VE Alternative Ideas Evaluation Method through Risk Evaluation Process"" 9 (9): 32-43, 2018

    7 Ministry of Land, Infrastructure and Transport, "Construction Design Value Engineering Process Manual" Team of Construction and Environment

    8 I. Heo, "A Hi-Value Process Establishment for Efficient Implement of Design Value Engineering in Highway" 12 (12): 36-48, 2011

    9 안상현, "A Case Study of the Risk Identification in Construction Project" 16 (16): 15-24, 2015

    10 G. S. Altshuller, "40 Principles : TRIZ Keys to Technical Innovation(translated by Lev Shulyak)" Technical Innovation Center 1998

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼