1 박문서, "시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발" 한국건설관리학회 11 (11): 65-74, 2010
2 배병윤, "모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -" 한국건설관리학회 13 (13): 103-112, 2012
3 "www.manufacturedhousing.org"
4 "www.dsmweb.org"
5 장세훈, "Tower crane operation management using the dependency structure matrix (DSM)" 서울대학교 대학원 2009
6 Goldratt, E.M., "The Goal: A process of Ongoing Improvement" North River Press 1992
7 Hammad A. A., "Simulation Model for Manufactured Housing Process" 2002
8 David A.G., "Methods for Analyzing Design Procedures" 1991
9 Banerjee D., "Material Flow-Based Facility Layout Analysis of a Manufactured Housing Production Plant" 12 (12): 2006
10 Mehrotra N., "Manufactured Housing Production Layout Design" 11 (11): 2005
1 박문서, "시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발" 한국건설관리학회 11 (11): 65-74, 2010
2 배병윤, "모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -" 한국건설관리학회 13 (13): 103-112, 2012
3 "www.manufacturedhousing.org"
4 "www.dsmweb.org"
5 장세훈, "Tower crane operation management using the dependency structure matrix (DSM)" 서울대학교 대학원 2009
6 Goldratt, E.M., "The Goal: A process of Ongoing Improvement" North River Press 1992
7 Hammad A. A., "Simulation Model for Manufactured Housing Process" 2002
8 David A.G., "Methods for Analyzing Design Procedures" 1991
9 Banerjee D., "Material Flow-Based Facility Layout Analysis of a Manufactured Housing Production Plant" 12 (12): 2006
10 Mehrotra N., "Manufactured Housing Production Layout Design" 11 (11): 2005
11 Haitao Y., "Lean Transformation in a Modular Building Company: A Case for Implementation" 2011
12 Mullens M.A., "Factory Design for Modular Homebuilding" Constructability Press 2011
13 Kusiak, A., "Efficient organizing of design a ctivities" 33 (33): 1993
14 박문서, "DSM을 활용한 도입단계에서의 BIM 설계 관리 프로세스" 대한건축학회 28 (28): 37-45, 2012
15 Carlson, D.., "Automated Builder: Dictionary/Encyclopedia of Industrialized Housing"
16 Browning T. R, "Applying the design structure matrix to system decomposition and integration problems : a review and new directions"" 48 (48): 2001
17 Maheswari J, "Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects" 2006
18 Rogge, D. F., "An investigation of field rework in industrial construction" Construction Industry Institute 2001
19 Yassine, A.A., "An Introduction to Modeling and Analyzing Complex Product Development Processes Using the Design Structure Matrix Method" 2004