RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI등재

    초고속정보통신망 정책의 성공요인에 관한 연구 -인과지도 및 정책네트워크 분석을 중심으로- = Study on Success Factors of Korean Information Infrastructure Project

    한글로보기

    https://www.riss.kr/link?id=A40119486

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    This study assumes that KII(Korean Information Infrastructure) Project success is due to policy change flexibility responding to policy environment change such as user demand and technology trends. The phase of policy change is determined by policy leader`s causal map and policy network which defines relation of actors. For analysis, causal map was built through interview with Ministers of Information and Communication, staffs and experts in KII Project. The results are as follows. 1) KII-government Network Project aimed at using government and public agencies and was directly invested by Government. Therefore it wasn`t sensitive to changes of policy environment and Network actors(President. MIC, KT, Dacom and NCA) were connected through cooperative ties. In this project, policy leader`s causal map didn`t change and existing policy persisted. 2) KII-public Network Project is used in homes and business offices mainly and is mostly invested by private sector. And it was sensitive to user demand and It trends. Policy network also changed as policy leader`s causal map varied.
    번역하기

    This study assumes that KII(Korean Information Infrastructure) Project success is due to policy change flexibility responding to policy environment change such as user demand and technology trends. The phase of policy change is determined by policy le...

    This study assumes that KII(Korean Information Infrastructure) Project success is due to policy change flexibility responding to policy environment change such as user demand and technology trends. The phase of policy change is determined by policy leader`s causal map and policy network which defines relation of actors. For analysis, causal map was built through interview with Ministers of Information and Communication, staffs and experts in KII Project. The results are as follows. 1) KII-government Network Project aimed at using government and public agencies and was directly invested by Government. Therefore it wasn`t sensitive to changes of policy environment and Network actors(President. MIC, KT, Dacom and NCA) were connected through cooperative ties. In this project, policy leader`s causal map didn`t change and existing policy persisted. 2) KII-public Network Project is used in homes and business offices mainly and is mostly invested by private sector. And it was sensitive to user demand and It trends. Policy network also changed as policy leader`s causal map varied.

    더보기

    동일학술지(권/호) 다른 논문

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼