
http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
이중단열재 및 메탈웨브를 이용한 벽체용 거푸집시스템의 구조내력평가
In general, the form system as a temporary structure needs many workers and includes many dangerous factors during the installation and removal. Therefore, this study presents the permanent wall form system to provide the two functions of form and insulation, and to simplify the installation process without removal works. This wall form system consists of the double insulation materials and metal web for the security of safety, insulation and soundproofing. For the field application of this form system, the safety and serviceability of the form should be secured. To this end, this study first performs the tensile and shear experiments for the unit form system, and then evaluates the structural bearing capacity of the system through the concrete lateral pressure experiments considering various design variables. The results of this study are as follows. 1) Through the tensile and shear strength tests, we can find that the safety of the unit form can be secured, based on concrete standard specification. 2) When the placement velocity is increased and installation intervals of supports are large, we can see that the deformation results of the lateral pressure experiment exceed the allowable deformation criterion. The above result analysis shows that the placement velocity and support installation interval should be considered in the design of form system. 3) The lateral pressures increase as the slump value and installation intervals of supports are large, and placement velocity is faster. Especially, the more deformation and lateral pressure are occurred in the part of concrete head.
시스템 거푸집 공동주택 적용시 문제점 및 개선방안에 관한 연구
이상준 영남대학교 산업대학원 2009 국내석사
국내 대부분의 건설사들은 공동주택 사업에 있어 타 사와의 경쟁에서 우위를 확보하고 원가를 절감하기 위해서 공기 단축에 대한 노력을 경쟁적으로 하고 있다. 이에 초고층 주상복합 현장의 경우 층당 공기(working day)를 4일 또는 이보다 더 짧은 3일정도 까지 공정계획을 하고 있으며, 일반 아파트의 경우에도 층당 공기를 6일 정도 추구하고 있는 실정이다. 이러한 중요성과 세계적인 추세에도 불구하고 아직 국내 현장에서는 대형 시스템 폼보다 목재폼과 유로 폼 등을 사용하고 있는 실정이다. 목재 폼과 유로 폼은 유럽이나, 북미에서는 사용하지 않는 거푸집 시스템으로 Ferguson(1999)은 ‘Antique Form'이라고 표현할 정도로 재래식 폼이다. 따라서 본연구에서는 기존거푸집 사용실태와 문제점을 분석하여 장,단점을 도출하고 국내 현장 적용의 문제점 및 개선방향을 도출하기 위하여 시스템폼공사와 관련된 대구지역 12개 공동주택 현장에 대해서 설문을 실시했고 도출된 분석결과에 따른 향후 시스템 거푸집 공동주택 적용시에 기초적인 자료를 제공하고 생산성 향상에 관한 방향을 제시하였다. 향후 연구에서는 많은 사례를 가지고 생산성을 검토해 보아야 하고, 대형 시스템 폼 적용을 위하여 Open Housing System을 도입하는 것 외에 기존의 구조 방식에서 대형 시스템 폼의 적용 할 수 있는 방안에 관해서도 연구를 해야 할 필요가 있다. In terms of projects for apartment houses, most construction companies in Korea try to competitively shorten work days in order to take advantageous positions in competitions with other companies and cut down the cost. In case of ultra-high-rise apartments and stores building construction sites, in turn, companies plan for working days per floor to be 4 days or, if even shorter, 3 days. In case of regular apartment buildings, companies make plans of 6 working days per floor. Forms are very important in this situation. In spite of the importance as well as the international trend, wooden forms or Euro forms are being used more than big size system forms in work sites in Korea. Wooden forms and Euro forms are form system not used in Europe or north America. They are old-fashioned forms for which Ferguson (1999) used the expression 'antique form.' Therefore, in this study, we analyzed the conditions and the problems of the use of the existing forms. We deduced the strong points and the weak points from it. We deduced the problems and the improving methods from it when applied to work sites in Korea. In order to do the analysis and the detection, we carried out surveys for 12 apartment houses construction sites related to system form construction work. We suggested the direction related to improving the productivity and providing basic data when system forms are applied to apartment houses in the future according to the deduced results. The productivity should be reviewed in more case studies in the future. It is necessary to do research on methods to apply big size system forms to the existing structuring methods other than introducing the open housing system in order for the application of big size system forms.
재래식과 시스템 거푸집을 사용한 계단실 공사의 비교 연구를 통한 개선형 시스템 거푸집 공법 제안
It is surveyed that the construction method of the staircase form has not been deviated from existing construction method of conventional type at present. Even if it is the complex and system construction method with many merits and improvements, it is hard to apply in real life because of economical efficiency. Especially, it is too risky to operate a new construction method without verification on the apartment construction, which has lots of preliminary civil appeal. So, it has not been deviated from the construction method which is cut and made the form to place the concrete by a labor intensive artificer. Most of 4 company fields in Sanam housing development district of Cheongju supply about 600 household apartments, and they are constructed as conventional type staircase form and system staircase form. It proves that the complex construction method is turned away from actual market even if it has lots of merit. As a result of comparison among PC, SC staircase, conventional and system staircase form construction method, the staircase using the PC and steel does not have good workability by interference between the form and Euro form. Therefore certain areas such as harbor, industrial complex, being good to supply subsidiary materials and raw materials by high price materials and shortage of material production infra, are able to get an economical efficiency. The conventional and system staircase form construction method have a high compatibility by identification of form construction method of existing building. Also they have little influence to raw materials, light subsidiary materials and easy to get materials because of plywood, which is cheap and a main material for them. Conventional staircase form is the construction method centered by human power, on the other hand, system form construction method is the form developed from plywood of existing conventional staircase form and has little influence for the human power and air on the assembly line, also it has little flaw with good smoothness so that it is expected high quality. The staircase of high buildings in the middle floor is modularized functionally, so it is possible to be applied to the large scale construction site such as multiplex house, hospital, school, building and apartment rather than detached houses, small houses and neighbor hood facility, also it is better for economical efficiency, construction and operation period. This study examines the actual condition of system staircase and conventional staircase form and analyzes the problems. Furthermore, I shall propose Flow Mortar complex form of permanent form, which is able to operate at the construction site, by examining the data for new technique trend of staircase form developed based on the result of utility and problem of staircase form construction, the heart of the study. 현재 계단실 거푸집 시공법은 기존 재래식 공법을 크게 벗어나지 못하고 있는 것으로 조사되었다. 이는 많은 장점과 개선점을 가진 복합화 및 시스템 공법일지라도 현실에서는 경제성 때문에 적용이 곤란하다. 특히 예비 민원인의 수가 많은 아파트 공사에서는 고비용의 초기투자 부담과 검증되지 않은 신공법을 시행하기에는 따르는 리스크가 너무 크기 때문이다. 따라서 노동집약적인 기능공이 일일이 거푸집을 재단하고, 제작하여 콘크리트를 타설하는 공법을 크게 벗어나지 못하고 있다. 청주의 산남 택지개발지구 내에 있는 4개사 현장은 대부분 600세대 내외의 공동주택을 공급하는데 재래식 계단실 거푸집과 시스템 계단실 거푸집으로 시공하고 있다. 이것은 많은 장점을 가진 복합화공법이라도 실제 시장에서는 외면 받고 있는 사실을 반증해 주고 있다. PC 및 SC 계단실, 재래식과 시스템 계단실 거푸집 공법을 비교한 결과 PC와 철강 부재를 이용한 계단실의 경우 본건물의 유로폼 거푸집과의 상호 간섭으로 인하여 시공성이 좋지 못하며, 고가의 부재와 부재 생산 인프라의 부족으로 부자재와 원자재 공급이 유리한 항만 부두, 공단 등의 일부지역에서만 경제성 확보가 가능하다. 재래식과 시스템 계단실 거푸집 공법은 기존 본건물의 거푸집 시공법과 같아 호환성이 높으며, 부자재가 경량이며, 저가인 합판이 주요자재이므로 자재확보가 유리하며, 원자재의 가격에 영향이 적다. 재래식 계단실 거푸집의 경우 인력중심인 공법인 반면 시스템 거푸집 공법은 기존 재래식 계단실 거푸집의 합판 대폭 개량하여 발전된 형태로 공장제작 생산 조립 시공으로 인력이나 공기에 영향이 적으며, 평활도가 양호하여 하자가 적으며, 고품질을 기대할 수 있다. 중층에서 고층 건물 계단실은 기능상 모듈화 되어있기 때문에 단독주택이나 소규모 주택 및 근린생활시설보다는 다세대 주택이나, 병원, 학교, 빌딩, 공동주택 등 대규모 건설현장에서 적용가능하며, 경제성 및 시공성과 공사기간에서도 유리하였다. 이에 본 연구에서는 재래식 계단실 거푸집 공법과 시스템 계단실 거푸집 실태를 조사하고 문제점을 분석한다. 계단실 거푸집 공법의 경제성, 공사기간, 시공성, 안정성 등을 검토하고, 각 현장의 특성을 고려하여 적정공법 선정의 기준을 제시하고, 고성능의 복합화된 시스템 거푸집 공법을 제안하고자 한다. 더 나아가 본 연구의 핵심인 계단실 거푸집 시공의 문제점과 실용성을 진단한 결과를 바탕으로 현재 개발된 계단실 거푸집 신기술 동향과 현황에 대한 데이터 수집 후 이를 분석 검토하여 건설현장에서 시공될 수 있는 영구거푸집 형태인 비탈형 모르터 거푸집 복합화 공법을 제안하고자 한다.
최근 국내 주택 보급률이 102%를 초과할 정도로 주거용 건축물의 공사가 활발히 이루어지고 있으며, 현재 거주자의 사용성 및 경제성 측면에서 유리한 철근콘크리트(Reinforced Concrete:RC)구조가 공사의 주를 이루고 있다. 건축 공사의 철근 콘크리트 구조 공정에 있어, 거푸집 공사는 핵심 공종 중 하나이다. 이는 거푸집 공사가 전체 공사기간의 약 25%, 골조 공사비의 30~40%, 전체 공사비의 약 10%를 차지할 뿐 아니라 마감, 설비 작업 등 후속 공정의 진행에 직접적인 영향을 미치기 때문이다. 이에 따라 국내·외에서는 거푸집 공사의 기간단축 및 비용절감을 위해 공법 개발, 생산성 평가, 배치 계획 등의 다양한 연구를 진행하고 있다. 특히 최근 국내 건축 공사가 점차 대형화·고층화됨에 따라 기존 인력중심의 재래식 거푸집 공법은 경제성, 안전성 측면에서 많은 문제점을 야기하였고, 이를 해결하기 위해 테이블폼, 갱폼 등 다양한 시스템 거푸집의 개발이 활발히 이루어지고 있다. 시스템 거푸집은 기계화 시공을 중심으로 높은 생산성을 가지고 있어 공기단축 및 인력절감이 가능한 장점이 있다. 그러나 최근 연구를 통해 기존 거푸집과 호환성 결여, 부재의 대형화에 따른 원가 상승, 거푸집 무게 증가로 인한 양중 부하 등의 한계가 나타나고 있으며, 이러한 한계로 인해 일부 시스템 거푸집은 현재 국내 건축 공사에 적합하지 못하다는 평가를 받고 있다. 이에 본 연구에서는 기존 시스템 거푸집의 문제점을 분석한 후, 이를 보완하여 개선된 시스템 거푸집 공법을 제안하였다. 개선을 위해 첨단복합 소재를 활용하였으며, 이를 통해 거푸집의 무게를 절감하였고 전용 횟수를 증대하였다. 또한 기존 거푸집과 호환성을 확보하였고 시스템화를 기반으로 수직·수평부재에 대한 단일적인 적용이 가능하도록 설정하여 작업 효율을 향상시켰다. 다음으로 제안된 시스템 거푸집 공법에 대해 현장 적합성을 검토하였다. 그 결과 합리적인 임대비용으로 적용성 확대가 가능하고 소음저감 효과가 있어 민원 관리에 유리할 것으로 파악되었다. 또한 박리제 도포가 불필요하고 우수한 탈형 품질을 가지며 여러 친환경적인 요소를 바탕으로 환경비용 및 CO절감이 가능할 것으로 판단되었다. 마지막으로 초고층 프로젝트의 사례 연구를 통해 제안된 시스템 거푸집의 경제성을 분석하였으며, 이를 통해 기존 대비 7.6%의 공사비 절감 효과를 확인하였다. 본 연구의 결과는 향후 국내 건축 공사에 시스템 거푸집의 적용을 확대하고, 시공효율성 및 경제성 향상 등을 통하여 건축 공사의 공기단축 및 비용절감 등에 기여할 것으로 사료된다.
지하옹벽 무지주 거푸집 개발 및 시공성능 분석에 관한 연구
이상우 충주대학교 산업대학원 2010 국내석사
최근 국내 건축공사 경향은 점차 대형화, 초고층화 되어가고 있다. 이에 따라 지하공사 또한 지하주차장의 확보와 대지이용의 극대화 등의 이유로 대형화, 대심도화 되어 그 규모가 점차 증가하고 있는 추세를 보이고 있다. 이러한 이유로 지하공사에 대한 관심이 높아짐에 따라 지하공사의 경제성 및 시공성을 향상시키기 위한 연구 및 개발이 진행되고 있으나, 지하공사의 거푸집 공법에 대한 연구는 미비한 실정으로 나타나고 있다. 따라서 본 연구에서는 최근 국내 지하공사에서 사용되고 있는 옹벽 거푸집공법의 실태를 고찰하고, 현재 토목공사 현장에서 사용되고 있는 무지주 거푸집을 기초로 하여 건축공사 현장에 적용 가능한 무지주 거푸집 개발에 목적이 있다. 현재 현장에서 거푸집공법 선정은 현장에 맞는 합리적인 공법을 선정하기에 어려움이 있어 대부분 가장 많이 사용되고 있는 공법이나, 현장 경험에 따른 실무자의 판단 하에 결정되고 있다. 이러한 이유로 현재 현장에서 가장 많이 사용되고 있는 공법은 유로폼+솔져시스템으로 조사되었다. 본 연구에서는 토목공사 현장에서 사용되고 있는 무지주 거푸집을 기초로 하여 건축공사 현장에 적용 가능한 합성·비합성 무지주 거푸집을 개발하였다. 또한 개발한 무지주 거푸집 중 비합성 무지주 거푸집을 Mock up test를 통하여 시공성을 분석하였으며, 거푸집 제작 크기를 가정하여 기존공법인 유로폼+솔져시스템과 경제성 분석을 통하여 현장 적용성을 평가하였다. 경제성 분석은 자재비·노무비를 통하여 순공사원가를 비교하였다. 순공사원가에는 경비가 포함 되지만, 경비는 재료비와 노무비의 일정한 비율로 정해지므로 경제성 분석에서 제외하였다. 거푸집의 제작 크기는 1회 작업면적을 높이 3.6m, 길이 24m로 가정하였으며, 전용횟수는 20회로 가정하였다. 이에 총 작업면적은 높이 3.6m, 길이 480m로 가정하여 두 공법을 비교·분석하였다. 또한 유로폼+솔져시스템과 무지주 거푸집에 사용되는 공통자재의 단가는 2009년 9월 실제 현장에서 거래되고 있는 가격을 기준으로 산정하였다. 하지만 무지주 거푸집의 경우 연구에 의해 개발된 일부 자재는 현재 유통되는 단가 적용이 어렵기 때문에 단가를 가정하여 산정하였다. 노무비단가는 대한건설협회에서 발표한"2009년 하반기 적용 건설업 임금실태 조사 보고서(시중노임단가)"에서 제시하고 있는 금액을 적용하였다. 두 공법을 비교·분석한 결과는 다음과 같다. 1) 비합성 무지주 거푸집에 대하여 Mock up test를 실시하였다. 그 결과 무지주 거푸집의 경우 거푸집을 지상에서 대형 유니트(Unit)화 하였기 때문에 설치 및 해체과정을 단순화하여, 공기단축에서는 유로폼+솔져시스템보다 유리한 것으로 나타났다. 2) 공사기간은 무지주 거푸집의 작업 1주기(CYCLE)가 5일로 조사 되었으며, 유로폼+솔져시스템은 6.5일로 조사되었다. 이에 무지주 거푸집이 작업 1주기에서 1.5일이 단축되어 공기 측면에서 유리한 것으로 나타났다. 3) 공사비 분석결과 (1) 자재비는 합성·비합성 무지주 거푸집 모두 기존공법인 유로폼+솔져시스템에 비해 불리하게 나타났다. 그 이유는 임대자재의 경우는 큰 차이가 없지만, 판매자재에서 큰 차이를 보이기 때문이다. 이는 무지주 거푸집의 경우 연구에 의해 개발된 공법으로써 사용되는 자재의 개발과 대량생산이 이루어지지 않았기 때문으로 사료된다. (2) 노무비는 유로폼+솔져시스템이 합성·비합성 무지주 거푸집에 비해 불리하게 나타났다. 그 이유는 무지주 거푸집의 경우 유니트화로 선 조립하여 공사기간 단축이 가능하지만, 유로폼+솔져시스템의 경우는 결속부위가 많기 때문으로 사료된다. (3) 총공사비는 유로폼+솔져시스템에 비해 합성 무지주 거푸집은 약 8%높게 나타났으며, 비합성 무지주 거푸집은 약 8%낮게 나타났다. 하지만 합성 무지주 거푸집의 경우 전단연결재를 콘크리트에 매립하여 흙막이와 콘크리트 벽체를 일체화하였기 때문에 구조체공사 시 콘크리트와 철근의 물량이 현저히 감소하므로 상당한 경제적 원가절감 효과를 볼 수 있다. 4) 시공성 분석결과 (1) 유로폼+솔져시스템은 설치 및 해체 작업이 복잡하며, 숙련공이 필요하다. 하지만 무지주 거푸집은 보통 인부만으로 시공이 가능하며, 크레인을 사용하기 때문에 최소인원으로도 설치가 가능하다. (2) 무지주 거푸집은 유로폼+솔져시스템과 달리 지지틀이 필요하지 않기 때문에 1,728㎡을 작업할 때, 솔져시스템의 면적인 912㎡의 여유 작업공간을 확보할 수 있다. (3) 유로폼+솔져시스템은 결속부위가 많고, 고소(高所)작업이 많이 이루어지고 있다. 그러나 무지주 거푸집은 지상에서 거푸집을 선 조립하여 크레인을 이용하여 설치한다. 이에 무지주 거푸집이 유로폼+솔져시스템에 비해 사고발생위험이 낮을 것이라고 사료된다. Recently, as the construction in Korea gradually becomes big-sized and high-storied, underground construction is also becoming bigger and deeper and its size tends to rise to secure underground parking lots and to maximize the use of land. As these trends have increased the interest in underground construction, some related research and developments have been performed in order to improve economical efficiency and construction efficiency, but there has not been enough research into the underground construction method of the mold. Therefore, this research aims at examining the actual condition of the wall mold construction methods used in the underground construction of Korea these days, and at developing a non-supporting form applicable to the construction field, based on the non-supporting form currently used in the field of public work. Although the selection of the construction method of a mold of the present fields is the most frequently used method because of the difficulty in choosing a reasonable construction method that suits the field, it has been decided by the judgment of the field experiences of the staff in charge. For this reasons, the mostly used construction method nowadays was examined to be the Euro-form+soldier system. In this research, non-synthetic and non-supporting form which could be applied to construction fields were developed, based on the non-supporting form used in the field of public work. In addition, the construction efficiency of the non-synthetic and non-supporting form was analyzed through Mock up test, among the developed non-supporting forms, and its economical efficiency and that of the existing construction method, Euro-form+soldier system, was analyzed on the assumed production size of a mold, and its applicability to fields was evaluated. To perform economical analysis, the prime construction cost was compared through the price of materials and labor expenses. Expenditure belongs to prime construction cost, but it was excluded from the economical analysis because it is decided by a certain rate of material prices and labor expenses. As for the production size of the mold, its height was supposed to be 3.6m and its length 24m for one time of work area, and the number of times to use was assumed to be 20. Therefore, the total work area was supposed to be 3.6m in height and 480m in length, and those two construction methods were compared and analyzed. Moreover, the unit cost of the materials used in common for the Euro-form+soldier system and for the non-supporting form was calculated on the standard of the price used in actual fields in September, 2009. However, because the current unit price couldn’t be applied to some materials of the non-support form developed through the research, another unit cost was supposed and calculated. With regard to the labor expenses, the price presented in the〈Report on the Actual Wage in the Construction Field in the Latter Part of 2009 (commercial wage unit cost)〉announced by Construction Association of Korea was applied. The comparison and analysis results of those two construction methods are as follows. 1) Mock up test was conducted on the non-synthetic and non-supporting form. The result showed that the non-supporting form was more advantageous for the air contraction than the Euro-form+soldier system because its mold became a big unit on the ground, which simplified the installation and dismantlement process. 2) The first cycle of the construction period of the non-supporting form was examined to be five days, and that of the Euro-form+soldier system was 6.5 days. Accordingly, the non-supporting form was better in terms of air because it shortened the first cycle of work by 1.5 days. 3) The analysis of the construction cost proved that (1), with regard to the materials cost, both synthetic and non-synthetic and non-supporting form was unfavorable than the existing construction method of the euro-form+soldier system. That’s because of the big difference in the cost of selling materials, in spite of the little difference in the leased materials. This is presumed to result from the fact that the non-supporting form was a construction method developed by a research, whose materials were not developed nor produced in big quantity. (2) In terms of the labor expenses, the Euro-form+soldier system was worse than the synthetic/non-synthetic and non-supporting form. It might be because the non-supporting form was assembled in advance by becoming a unit, which made it possible to shorten the construction period, but the Euro-form+soldier system had many combined parts. (3) The total construction cost of the synthetic non-supporting form was higher than that of the Euro-form+soldier system by about 8%, and the non-synthetic and non-supporting form was lower than that by about 8%. However, in case of the synthetic and non-supporting form, the shear connection material was buried in the concrete and the retaining and concrete walls were unified, so the amount of concrete and reinforcing rods for structural construction decreased considerably, which created a remarkable effect of economical cost reduction. 4) The analysis result of the constructive efficiency proved that (1) the installation and dismantlement of the Euro-form+soldier system was complex and required skilled workers. Yet, the non-supporting form could be constructed only by normal workers, and only minimum workers were necessary because of the use of a crane. (2) The non-supporting form needs no supporting frame, which is different from the Euro-form+soldier system, so could secure 912㎡ of room for work, the area of the soldier system, in case of the work of 1,728㎡. (3) The Euro-form+soldier system had lots of connected parts, and high ground work. On the other hand, in case of the non-supporting form, the mold is assembled on the ground in advance, and then installed by using a crane. Accordingly, the non-supporting form is considere
본 연구는 최근 일어난 거푸집 관련 재해사례에 대해 분석하고 사고의 원인을 분류하였다. 이를 토대로 Self Climbing System 거푸집 공사에 관한 문제점과 개선방안을 제시하기 위해 문헌적 연구와 사례분석 연구를 병행하여 실시하였다. Self Climbing System 에는 다음과 같은 종류가 있다. PERI사의 - ACS(Automatic Climbing System), DOKA사의 - SKE(Selbst Kletter Einheit), Hunebeck 사의- SCF (Self-Climbing Formwork) 등 여러 가지가 있다. 본 연구는 사례연구로 T지구 H 아파트, S지구 E아파트, S 역 G 아파트 재해, A 3차(복합1) 사례, H시 지구 18블럭 공사현장, C재건축 아파트 갱폼 사고 사례 , 갱폼 인양 중 지브크레인 붐(boom) 도괴 사례를 분석하여 질적연구로 진행 하였다. Self Climbing System 현장 사고의 원인의 공통점은 모두 부주의에서 일어난 사고였으며, 사고의 결과 한사람이라도 사망했다는 것이 공통점이었다. 이러한 사고의 사례를 보아 갱폼의 현장에서는 세심한 주의가 필요하다는 결과가 나왔으며, 그러한 사고를 예방하기 위해서는 현장의 안전검검이 가장 시급하다는 것으로 결과를 알 수 있었다. The study analyzed the case for a recent form of Formation-related Form and classified the cause of accidents. Based on this, the study conducted a series of researches and examples of studies to present the problems and improvements to the Self-Climbing System Form. There are the following types of self-climbing systems : There are several things such as P.I.T. (AAE), SKE Corporation, and Hunebeck (Self-Scheduled), and Hunebeck's - SCF. The study conducted a qualitative study by analyzing the case studies of T Earth H Apartment, S E Apartment, S Station G Apartment, A3 (Complex 1) Cases of H Apartment Complex, C rebuild apartment construction site, C rebuild apartment construction case, and topography divination boom during regeneration. The commonality between the cause of the self-climbing system of the Self Climbing System was in carelessness, and in the event of an accident, it was common for a person to die. In the case of such accidents, the site of the gangster's site needed careful attention, and in order to prevent such accidents from happening, the results of the walkdown were found to be the most urgent.
건설현장 안전사고 예방을 위한 가설공사의 설계도서 필요성에 관한 연구
김상혁 경기대학교 공학대학원 2021 국내석사
최근 건설현장에서 발생하는 안전사고는 인적자원의 손실은 물론 기업의 성장 둔화와 수익성 등 재무제표에도 영향을 미치고 있고, 사회 · 경제적으로도 문제가 되고 있다. 건설현장의 안전사고 원인은 다양하게 나타나고 있으며, 가설 구조물공사의 부실한 설계 · 시공 및 유지관리는 사고 발생 시 중대 재해로 이어지는 가장 큰 원인으로 조사 · 분석되고 있다. 본 연구의 목적은 가설구조물(비계, 동바리, 거푸집) 설계를 실시설계단계에서 계획하는 것이 설계의 누락 및 부실로 인한 안전사고 저감에 영향이 있는지에 대하여 살펴보고자 한다. 연구의 방법은 2021년 3월 현재 진행 중인 건축공사 현장의 계층별, 직종별 관리감독자 및 직종별 작업근로자를 대상으로 설문 조사를 진행하였고 Jamovi 통계프로그램의 분석을 통하여 실효성 있는 결과를 나타낼 수 있었다. 결과적으로 System비계, System동바리, 거푸집의 가설구조물 설계도서는 모든 조사 대상에서 안전한 작업을 위하여 반드시 필요한 것으로 생각하고 있으나 System비계 및 System동바리 설계도서는 안전사고를 예방하거나 저 감 시키는지는 검증하지는 못하였으며 거푸집의 설계도서의 유무는 안전사고 예방 및 저 감에 영향을 미치는 것 으로 분석되었다. 그 원인을 살펴보면 System비계 및 System동바리 가설 기자재의 품질 수준이 기술개발 등으로 향상되었으며 조립, 설치의 방법 또 한 보편화 되어 난이도 없이 작업이 가능하기 때문으로 판단되며 거푸집의 조립 설계도는 거푸집에 작용하는 하중이 비교적 복잡하여 반드시 구조계산에 의한 설계도서 유무가 거푸집의 무너짐 및 작업자 떨어짐 사고와 직접적인 영향이 있기 때문으로 분석되었다. 따라서 가설구조물의 설계도서 작성 및 시공관리는 현재 시행 중인 안전관리계획서에 포함하여 작성, 관리하는 가설구조물 설계를 실시설계에 포함하여 작성·관리하고 관리감독자와 작업책임자의 설계도서에 대한 정보 접근성을 쉽게 하면 “가설구조물 안전에 관한 평가·심사” 국토 안전관리원의 안전관리계획서 심사 자료의 활용도가 향상될 것으로 기대되며 시공 검측 및 유지관리의 기준 자료로 활용 함으로써 가설구조물에 의한 떨어짐 및 무너짐 사고를 감소시킬 수 있을 것으로 생각된다. Safety accidents that occur at construction sites in recent years affect not only safety accidents of human resources, but also financial statements such as slowdown in corporate growth, and are becoming social and economic problems. There are various causes of safety accidents at construction sites, and poor design, construction, and maintenance of temporary structure construction are being investigated and analyzed as the biggest cause leading to serious disasters in the event of an accident. The purpose of this study is to investigate whether planning the design of temporary structures (scaffolding, moving bars, formwork) at the detailed design stage has an effect on the reduction of safety accidents due to omissions and insolvency of the design. As for the method of the study, a questionnaire survey was conducted for workers by class, management supervisor by job category, and job workers at the construction site currently underway in March 2021, and through the analysis of the statistical program Jamovi, effective results could be presented. As a result, design drawings of temporary structures of system scaffolding, system ridges, and formwork are considered to be essential for safe work in all survey targets, but system scaffolding and system ridge design documents have not been verified to prevent or reduce safety accidents. The presence or absence of a design document of the formwork was analyzed to have an effect on the prevention and reduction of safety accidents. Looking at the cause, it is judged that the quality level of the system scaffolding and the temporary equipment for the system has been improved through technology development, and the method of assembly and installation is also universal, so that the work can be done without difficulty. This is relatively complicated, and it was analyzed that the presence or absence of a design document by structural calculation had a direct effect on the collapse of the formwork and the dropping of workers. Therefore, the design drawings and construction management of temporary structures are prepared and managed by including the design of the temporary structures to be prepared and managed in the detailed design, including in the safety management plan currently in effect, and the accessibility of information to the design documents of the management supervisor and the work manager is provided. If it is easy, “Evaluation and review on the safety of temporary structures” Review the safety management plan by the National Land Safety Management Agency. It is expected that the utilization of the data will be improved, and by using it as a standard data for construction inspection and maintenance, it is thought that it will be possible to reduce the accidents of falling and collapse due to the temporary structure. key word : Temporary structure, system scaffold, system support, Formwork, Fall accident, Collapse accident
코너강판벽을 활용한 개량형 자동인양 거푸집 시스템 최적 설계
In this study, an analytical study was conducted on the optimum structural design of modified auto climbing formwork system that utilizes the steel plates at both ends of the core as a support point in connection with the corner steel composite core wall structural system. Accordingly, data of optimal design of system components are accumulated through variable studies on the geometrical parameters such as the span and height of the formwork system and the spacing of the horizontal members and form-ties. And weight analysis of the total formwork frame was conducted for increasing the construction ability and reducing the lifting capacity and loads acting on anchor bolts. As a results, the resistance to lateral concrete pressure during pouring of concrete can be controlled by form-tie that connects the both-sided formwork, and the span of the formwork or the cross-section of the horizontal member not significantly affect the design of the constituent member. And, the equations for expecting the maximum displacement of formwork and the maximum stress of the form-tie were proposed for designing formwork in various conditions.