http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
직류 1500V 전기철도용 변전소의 회생인버터 용량 및 설치위치 선정 방법
裵昶漢(Chang-han Bae),漢文燮(Moon-seup Han),金容基(Yong-ki Kim),權三榮(Sam-young Kwon),朴賢濬(Hyun-June Park) 대한전기학회 2006 전기학회논문지 B Vol.55 No.9
The paper presents methods of determining the capacity and installation positions of regenerative inverters installed in DC 1500V electric railway system. We suggested a method that approximates using parameters related to substations where regenerative inverters are installed, railway lines and operating motor cars, and another that calculates using regenerative power obtained from Train Performance Simulation (TPS) and Power Flow Simulation (PFS). We carried out TPS and PFS for Seoul Subway Line 5~8, calculating regenerative power and determining substations where regenerative inverters would be installed and the optimal capacity and number of inverters to be installed.