http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Digital Twin 개념을 적용한 제조환경 시뮬레이션 모형 설계
황성범,정석재,윤성욱,Hwang, Sung-Bum,Jeong, Suk-Jae,Yoon, Sung-Wook 한국시뮬레이션학회 2020 한국시뮬레이션학회 논문지 Vol.29 No.2
As the manufacturing environment becomes more complex, traditional simulation models alone are having a lot of difficulties in reflecting real-time manufacturing situations. Although the Digital Twin concept is actively discussed as an alternative to overcome theses issues, many studies are being carried out only in the product design phase. This research presents a Digital Twin-based manufacturing environment framework for applying the Digital Twin concept to the manufacturing process. Twin model that is operated in virtual space, physical system and databases describing the actual manufacturing environment, are proposed as detailed components that make up the framework. To check the applicability of proposed framework, a simple Digital Twin-based manufacturing system was simulated in a conveyor system using Arena software and Excel VBA. Experiment results have shown that the twin model is transmitted real time data from the physical system via DB and were operating in the same time unit. The Excel VBA fitted parameters defined by cycle time based on historical data that real-time and training data are being accumulated together. This study proposes operating method of digital twin model through the simple experiment examples. The results lead to the applicability of Digital twin model.
트럭 도착 정보를 활용한 휴리스틱 기반 야드 크레인 스케줄링 방법
황성범,정석재,윤성욱,Hwang, Sung-Bum,Jeong, Suk-Jae,Yoon, Sung-Wook 한국시뮬레이션학회 2019 한국시뮬레이션학회 논문지 Vol.28 No.4
Literatures have considered mathematical model that change the job order of shipper for improving the operation time of yard crane. However, on the real site, it is impossible to change the job order decided according to the shipper's arrival order. Therefore, operation managers have been utilized the relatively simple strategy that job control is better but the process time of yard crane is longer due to the growth of yard crane's interference time and empty drive time. This study proposed a new yard-crane scheduling approach that decided the job order before the shipper's truck arrived the yard terminal. We utilize the Container Pre-Information Notice estimating the arrival time of truck. We developed the container terminal simulation model for validation of the effect of proposed scheduling approach. The results show that the proposed scheduling reduced the interference delay time and empty moving time of yard crane and shipper's truck delay time.