http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
원자력 발전소 비상디젤발전기 최적 정비방안 수립 및 평가
하체웅,한성흠,임우상 한국기계기술학회 2008 한국기계기술학회지 Vol.10 No.3
An emergency diesel generator(EDG) manufactured by a French company Wartsila SACM is a tandem type engine and consisted of two 10 cylindered diesel engines on each side. The maintenance manual provided by the manufacturer recommends that engine bearing be inspected every 15 years. However, it is difficult to inspect them because the manhole located in the lower compartment of the engine is too small for maintenance worker to access engine internals. Furthermore, the EDG should be disassembled and then overturned to inspect bearings unlike other EDG type. Such process will take longer period time than ordinary maintenance period. So it is not possible to inspect the main engine bearing and crank shaft during a routine or scheduled maintenance. In this paper, five methods are proposed and estimated to resolve the problem and the optimal maintenance method is chosen among them. The proposed optimal maintenance plan makes it possible to perform proper maintenance during regular maintenance period and to lower maintenance cost considerably.
원자력 발전소 Tandem형 비상디젤발전기 최적 정비방안 수립 및 평가
하체웅,한성흠,임우상 한국기계기술학회 2008 한국기계기술학회지 Vol.10 No.3
An emergency diesel generator(EDG) manufactured by a French company Wartsila SACM is a tandem type engine and consisted of two 10 cylindered diesel engines on each side. The maintenance manual provided by the manufacturer recommends that engine bearing be inspected every 15 years. However, it is difficult to inspect them because the manhole located in the lower compartment of the engine is too small for maintenance worker to access engine internals. Furthermore, the EDG should be disassembled and then overturned to inspect bearings unlike other EDG type. Such process will take longer period time than ordinary maintenance period. So it is not possible to inspect the main engine bearing and crank shaft during a routine or scheduled maintenance. In this paper, five methods are proposed and estimated to resolve the problem and the optimal maintenance method is chosen among them. The proposed optimal maintenance plan makes it possible to perform proper maintenance during regular maintenance period and to lower maintenance cost considerably.