http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
철도 선형을 고려한 알고리즘 기반의 철도 터널 BIM 설계 방안
최형래,장경수,김혁,이명호,박민상 한국BIM학회 2019 KIBIM Magazine Vol.9 No.1
In process of creating BIM model for tunnel, many user use still CAD, so the workflow for BIM design is not perfect. Therefore, in this paper, we proposes a method to automatically create BIM model without converting 2D drawings in tunnel design. It can allow engineers to design BIM-based tunnel with maximum use of linear information and modify the BIM model whenever there is changed linear information. To do this, we use Dynamo, which can reduce the time required for creating and modifying BIM models during design changes, saving time wasted for BIM conversion design.
최형래,김현승,강인석,김창학 한국도로학회 2020 한국도로학회논문집 Vol.22 No.6
PURPOSES : This study aimed to provide a method for linking VE/LCC/LCA and BIM and to develop a system for BIM-based VE/LCC/ LCA evaluation. METHODS : Based on literature reviews and case studies, we propose bridge hierarchies for sharing and integrating VE/LCC/LCA and BIM information and standard unit price and equipment workloads for LCC and LCA analysis. We further developed a BIM library to visualize various ideas and alternatives. RESULTS : The results of the proposed system demonstrate that the VE can be systemized and the original draft and alternatives can be visually provided via the BIM library. In addition, the LCC cost can be calculated by the automatic volume calculation of the bridge BIM library and the LCA can be calculated using the materials and equipment (these are BIM attribute information). CONCLUSIONS : The developed method can be more reliable and productive of VE, LCC, and LCA work owing to the partial automation and visualization of the developed system.
최형래,장경수,이윤영 한국도로학회 2020 한국도로학회논문집 Vol.22 No.3
PURPOSES : This study is a method for developing a 3D stratum modeling that uses Civil3D, CAD, Revit, and Dynamo, the products of Autodesk and ground survey data to prevent reversal and applying BIM design to underground structures. METHODS : If the ground level difference is severe and the survey data is not sufficiently spaced, a reversal phenomenon occurs such that the stratum is generated above the surface ground. In such cases, the first layer of the stratum can be offset from the ground surface and the remaining layers are created and utilized by the stratum thickness. However, the first layer is just offset from the ground surface, which is not an accurate implementation of geological information. To fix this error, we propose a method to calculate the quantity in 3D based on the algorithm that generates the stratum underneath the original ground surface connected with borehole data. RESULTS : The 3D stratum is designed to be implemented within 30 min with minimum memory resource occupancy. The ground surface is generally based on a digital map and can be linked with a drone and 3D scan data afterwards. The stratum model for each layer can be implemented in both a triangulated irregular network (TIN) and solid for quantity and volume calculations. Each layer will be generated in selected colors, and analysis on altitude, gradients, etc. can be performed with it. CONCLUSIONS : Constructing 3D spatial information using 2D information is expected to lay the foundation for providing required services in construction, real estate, architecture, urban planning, and transportation in the future, to users with integration and convergence into various fields such as BIM, smart city, digital twin, and VR-AR.
최형래(Hyung-Lae Choi),이인혁(In-Hyuk Lee),송성근(Sung-Geun Song),강필순(Feel-Soon Kang),문채주(Chae-Joo Moon) 전력전자학회 2005 전력전자학술대회 논문집 Vol.- No.-
This Exploiting monitoring program is a program for real-time monitoring the current and voltage that made from wind and solar generators. and this program helps to check efficiency and situation of the wind generator, The main subject of this thesis is about making the more useful real-time monitoring program to get and save the data from wind generator. therefore, it uses LabVIEW for this real-time monitoring program.
최형래(HL Choi),정태욱(T.U Jung),전장건(J.G Jeon),우도(Yu Tao),이동헌(D.H Lee),강필순(P.S Kang),최준호(J.H Choi),박성준(S.J Park) 전력전자학회 2006 전력전자학술대회 논문집 Vol.- No.-
This paper presents control method of a Z-source inverter and their relationships of voltage boost versus modulation index. A maximum boost control is presented to produce the maximum voltage boost(or voltage gain)under a given modulation index. The control method, relationships of voltage gain versus modulation index, and voltage stress versus voltage gain are analyzed in detail and verified by experiment.