http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
준비시간을 고려한 Job Shop 스케쥴링 문제의 근사적 해법에 관한 연구
정한일,김기동,정대영,박진우 한국경영과학회 1996 한국경영과학회 학술대회논문집 Vol.- No.1
The job shop scheduling problem has been a major target for many researchers. And, most of the past studies did not consider setup time. In many cases of real manufacturing environment, however, there exists a setup time for each operations. The setup can be divided into two parts, one can be done before job arrival and the other can be done after job arrival. The setup time based on the latter can be summed together with processing time, but that based on the former can not be. We propose an approximation method based on shifting bottleneck procedure for solving the job shop scheduling problem with sequence independent setup time. It schedules the machines one by one, taking a bottleneck machine among the machines not yet scheduled. Every time after a new machine is scheduled, all schedules previously established are updated. Both the bottleneck search and the schedule updating procedure are based on solving a single machine scheduling problem with ready time, setup time and delivery time iteratively.
정한일 大田大學校 産業技術硏究所 2014 산업기술연구소 論文集 Vol.25 No.2
This study presents a performance evaluation method for research equipments based on delphi method and AHP, and conducts a case study on the some equipments managed by National Research Facilities & Equipment Center in Korea Basic Science Institute. The case study shows the results obtained by suggest performance evaluation method coincide with the opinions of the equipment experts. Therefore the suggested performance evaluation method on this study could play an important role in managing equipment in National Research Facilities & Equipment Center. But the limitations from using Delphi method and not considering systematization on computer, further research for improving the suggested method should be conducted in future. 본 연구에서는 델파이 기법에 기반한 설문조사 체계와 AHP 기법을 활용한 연구 장비의 성능 평가 체계를 제안하고 한국기초과학지원연구원 국가연구시설장비진흥센터에서 보유한 장비 중 일부 장비에 대하여 사례 연구를 수행하였다. 사례 연구를 통해 본 연구에 의한 성능 평가 결과가 전문가들이 경험에 의해 판단하는 성능의 차이와 상당히 일치하는 결과를 보이는 것으로 나타남으로써 본 연구의 결과가 차후 대규모 장비에 대해 수행되는 연구 장비 관리에 있어 중요하게 사용될 수 있을 것 으로 기대된다. 그러나 델파이 기법을 바탕으로 하여 전문가 의견 수렴에 많은 비용과 시간이 소요되는 단점을 갖고 있으며, 성능 평가 과정 설계에 있어 시스템화를 고려하지 못한 한계점이 있어 이에 대한 보완이 필요한 것으로 판단된다.
글로벌 생산시스템을 위한 데이터 및 프로세스 모델 설계
정한일 대전대학교 산업기술연구소 2000 산업기술연구소 論文集 Vol.11 No.2
To obtain the advantages of the global manufacturing system, distributed system is necessary to support the global manufacturing system. The roles of the distributed system can be classified into two parts, the one is planning and the other is execution. In this study, we suggest an enterprise model for global manufacturing system focusing on the planning function for mid-term and short-term production planning. In detail, we presented a function model using the IDEF0 methodolody, and a data model and process model with UML diagrams.
정한일,이경휘 대전대학교 산업기술연구소 1999 산업기술연구소 論文集 Vol.10 No.1
The single machine sequencing problem is a specialized scheduling problem in which an ordering of the jobs completely determines a schedule. As simple as it is, however, the single machine case is still very important. But most of the past studies did not consider the setup time that can be prepared before job arrives, release date, and delivery time. We proposed an optimal seeking algorithm for single machine sequencing problem considering before-arrival family setup time, release date, and delivery date using branch & bound method. Experimental result shows that the proposed single machine sequencing algorithm finds an optimal solution within small time limit.
정한일,한수민 大田大學校 産業技術硏究所 2013 산업기술연구소 論文集 Vol.24 No.2
The massive disasters increase in 2000s, and the increase of the urbanization amplifies the loss caused by disaster. Because of that situation, studies on emergency logistics for disaster situations have received wide attention. South Korea has been less experienced huge disasters, but global increase of disaster raises the importance of emergency logistics. Emergency logistics problem is similar to general logistics problem, but it includes more uncertainty. To overcome the difficulty of emergency logistics problem, the distributed logistics planning system is suggested and its performance is evaluated by the simulation experiments. 2000년대에 들어 인류에 큰 피해를 주는 재난 발생이 증가하고 있으며, 도시화는 이러한 재난에 의한 피해를 증가시키고 있다. 이러한 상황에서 재잔 상황에 대응하는 비상 물류에 관한 연구는 폭넓은 관심을 받고 있다. 우리나라의 경우 대규모 재난의 경험이 많지는 않지만 전 세계적으로 증가하는 재난에 의해 비 상물류의 중요성이 커지고 있는 상황이다. 비상물류 문제는 일반적인 물류문제와 유사성이 있지만 불확실성이 크다는 면에서 차이가 있다. 본 연구에서는 비상물류 문제 해결의 어려운 점을 해결하기 위하여 분산 물류 계획 시스템을 제안하고 실험을 통해 제안된 시스템의 성능을 평가하고자 한다.