http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
The Trends of IT Convergence in Korea
이성열,Lee, Sung-Youl Korea Society of Industrial Information Systems 2012 한국산업정보학회논문지 Vol.17 No.7
These days, the environment of IT development goes through converging with various industries and technologies. Also, it accelerates to pioneer new markets and develop new technologies. This trend becomes one of the most important factors to explore new national growth engines in Korea. Thus, this research examines current trends of IT convergence in Korea. The strategic characteristics of IT convergence in overseas are briefly explained for comparing purpose. The governmental strategies or efforts regarding the IT convergence have been surveyed. Some example convergences of LG, Samsung, and POSCO as major IT industries in Korea have been introduced. It also identifies several buzz concepts in this field. The study aims to provide an insight about the activities that are happening in the field of IT convergence in Korea. Finally, the findings through the research have been summarized.
PS-NC Genetic Algorithm Based Multi Objective Process Routing
이성열(Sung-Youl Lee) 한국산업정보학회 2009 한국산업정보학회논문지 Vol.14 No.4
이 논문은 다목적 공정순서계획 알고리즘을 소개한다. 공정순서계획이란 가용한 기계들을 이용하여 원재료를 가공 완료된 부품으로 변형해주는 최적 공정순서들을 결정하는 일이다. 어느 컴퓨터 지원 공정계획 시스템에서나, 가공작업 순서의 결정은 부품 가공이나 부품 도면상의 기술적인 요구사항들을 충족시켜주기 위한 가장 중요한 활동 중의 하나이다. 여기서, 목표는 생산시간, 생산비용, 기계가동률 또는 이들을 복합적으로 만족시켜주는 최적 가공순서를 생성하는 일일 것이다. 파레토 스트라튬 니치 큐비클 (PS NC) 유전 알고리즘이 두 가지 상호 배타적인 기준인 생산비용과 생산품질을 동시에 최적화 시켜주는 가공순서들을 찾는데 이용되었다. 예제에 의한 검증은 제안된 PS NC 유전자 알고리즘이 공정계획문제에 있어서 효과적이며 효율적인 결과를 가져오는 것을 보여준다. This paper presents a process routing (PR) algorithm with multiple objectives. PR determines the optimum sequence of operations for transforming a raw material into a completed part within the available machining resources. In any computer aided process planning (CAPP) system, selection of the machining operation sequence is one of the most critical activities for manufacturing a part and for the technical specification in the part drawing. Here, the goal could be to generate the sequence that optimizes production time, production cost, machine utilization or with multiple these criteria. The Pareto Stratum Niche Cubicle (PS NC) GA has been adopted to find the optimum sequence of operations that optimize two conflicting criteria; production cost and production quality. The numerical analysis shows that the proposed PS NC GA is both effective and efficient to the PR problem.
이성열(Sung-Youl Lee),이월선(Wol-Sun Lee) 한국산업정보학회 2008 한국산업정보학회논문지 Vol.13 No.5
Facility Layout Planning is concerned with how to arrange facilities necessary for production in a given space. Its objective is often to minimize the total sum of all material flows multiplied by the distance among facilities. FLP belongs to NP complete problem; i.e., the number of possible layout solutions increases with the increase of the number of facilities. Thus, meta heuristics such as Genetic Algorithm (GA) and Simulated Annealing have been investigated to solve the FLP problems. However, one of the biggest problems which lie in the existing meta heuristics including GA is hard to find an appropriate combinations of parameters which result in optimal solutions for the specific problem. The Ant System algorithm with elitist and ranking strategies is used to solve the FLP problem as an another good alternative. Experimental results show that the AS algorithm is able to produce the same level of solution quality with less sensitive parameters selection comparing to the ones obtained by applying other existing meta heuristic algorithms.