http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
양수석,송태호,Yang, Soo-Seok,Song, Tae-Ho 대한기계학회 2000 大韓機械學會論文集B Vol.24 No.4
Analytical experiments to determine the line-of-sight temperature distribution is conducted by using spectral radiation intensities. For this study, fourteen narrow bands of $25cm^{-1}$ interval in $CO_2\;4.3{\mu}m$ band ($2,050cm^{-1}$ to $2375cm^{-1}$) are selected. The applied system is a one-dimensional gas slab filled with 100% $CO_2$ gas at 1 atm. Two types of temperature profile are tested; parabolic and boundary layer types. Three kinds of radiation calculation are used in the iteration procedure for the temperature inversion; LBL(Line by Line), SNB(Statistical Narrow Band) and WNB(WSGGM. based Narrow Band) models. The LBL solution shows perfect agreement while some error of temperature prediction is caused by radiation modeling error when using SNB and WNB models. The inversion result shows that the WNB model may be used more accurately in spectral remote sensing techniques than the traditional SNB model.
양수석(Soo Seok Yang) 한국추진공학회 2019 한국추진공학회지 Vol.23 No.4
Recently, in the space market, there has been a rapid reduction of the launch price. The major reason is that a few commercial companies, especially SpaceX, began to enter into the space market about ten years ago, which has changed the space market from monopolization to competition, and accelerated the adoption of commercial efficiency in the technology and management. Also, the successful landing and recovery of a first stage in 2016 by SpaceX proved to be a prelude to opening a new era of reusable launch vehicles, and SpaceX declared the groundbreaking launch price through using the reusable launch vehicle. This study calculates the total launch cost required to put a certain satellite into the LEO, compares the launch cost in three cases with different payload weights, and reviews the impacts of the payload on the cost effectiveness of a reusable vehicle. The total launch cost is divided into 6 subsections cost, namely development cost, production cost, refurbishment cost, operation cost, fixed-cost of factory and launch site, and insurance cost. The cost estimation relationships used in the calculation are taken from the commonly proven cost models such as TRANSCOST.
양수석(Soo-Seok Yang),이대성(Dae-Sung Lee),김승우(Seung-Woo Kim) 한국유체기계학회 1999 유체기계 연구개발 발표회 논문집 Vol.- No.-
Currently under development is an airborne auxiliary power unit with 100 Kw equivalent power, which is composed of a centrifugal compressor, a reverse annular combustor, and a radial turbine. Air-foil bearings are used in this power unit to eliminate the oil supplying system, which can reduce the system complexity and weight. The high speed generator is adopted as an electric power generation and engine starting system, which can also eliminate the reduction gear system. Not only electric power but also pneumatic power is provided by bleeding the compressed air. This power unit is aimed for the multi-purpose use such as a primary power unit in the army weapon system, an auxiliary power and environmental control unit in a next-generation tank, and a smoke generating unit.
재사용발사체의 발사비용에 미치는 가격인자들의 민감도 분석
양수석(Soo Seok Yang) 한국추진공학회 2020 한국추진공학회지 Vol.24 No.2
Recently the reusable launch vehicle is being a major trend in the worldwide space market, because a few commercial companies, especially SpaceX, are trying to cut down the launch price through developing and succeeding the reusable launch vehicles. However, there is still a big controversy about whether in view point of the launch cost which is more favorable between expendable and reusable. Therefore, a study and close examination is required for the launch cost in the early development phase of the reusable launch vehicle. In this study the sensitivity analysis is performed with respect to the major cost parameters which have great effects on the launch cost and price. The standard vehicle of this sensitivity analysis is the expendable vehicle having a payload 20 tons. The cost estimation relationships used in this calculation are referred from the commonly proven cost models such as TRANSCOST. The major cost parameters chosen in this study are as follows: development cost, production cost, refurbishment cost, and maximum reusable number.