http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
송영웅,정민근,김상호,최경임,이명수 한국경영과학회 1996 한국경영과학회 학술대회논문집 Vol.- No.1
Although the tasks are being mechanized or automated today, many tasks are still performed manually in several indeustrial settings and low back pain has been a social and economic problem. In this study, five machine repair tasks are selected from one manufacturing company in Pohang, which are accountable for relatively high complaints of low back pain. The purpose of this study is to quantitatively evaluate the hazards of the tasks, and finally to recommend the improved methods and guidelines for safe work practices. For most of the tasks under study, workers were found to be exposed to relatively high stresses in low back, mainly due to the heavy objects handled and the improper working postures.
송영웅,최형원,최윤기,Song, Young-Woong,Choi, Hyung-Won,Choi, Yoon-Ki 한국건설관리학회 2010 한국건설관리학회 논문집 Vol.11 No.1
빠르게 변화하는 경영 환경 속에서 기업들은 변화에 대응하며 기업의 지속적인 성장을 위해서 프로세스 경영, ERP 등 기업의 업무 프로세스 혁신기법과 업무를 지원할 수 있는 IT시스템들을 도입하여 왔다. 하지만 통합적 관리 체계의 부재로 업무 프로세스와 IT간의 분리 현상이 발생하여 기업 경영의 효율이 저하되는 문제가 나타났다. 이러한 문제의 해결을 위해 BPM(Business Process Management) 개념이 대두되었고, 많은 기업들이 도입을 시도하고 있는 상황이다. 본 연구는 BPM 도입을 시도하고 있는 국내 건설기업을 대상으로 단위업무에 대한 IT시스템 지원도 평가를 통해서 BPM 도입의 주요 배경이 되는 업무 프로세스와 IT간의 분리현상에 대한 정량적 평가를 목적으로 하였다. 이를 위해 문헌 고찰과 사례 분석을 통해 평가의 필요성을 제시하고, 평가를 위해 건설기업의 본사업무를 중심으로 단위 업무를 계층화 하였으며, 업무지원 IT시스템을 분석하였다. 이를 토대로 평가 방법을 설계 하고, 평가 결과 분석을 통해서 건설기업의 BPM구현에 있어서의 시사점을 제시하였다. Many enterprises have adopted various management techniques and IT systems such as "Process Management", "ERP" for coping with rapid business environment change and for continual growth. However, the separation problem between business process and IT system which causes reduction of business management efficiency has occurred for the lack of integration management mechanism. To solve this problem, many companies try to adopt BPM (Business Process Management) concept. The purpose of this study is to identify this separation problem in Korean construction companies which are trying to apply BPM to their business through evaluating IT system support to business processes. This study indicated the need of evaluation through current researches and case studies, then made hierarchy of home business of construction companies and analyzed IT systems for supporting business. The evaluation method is designed based on these researches. This study proposed the implications for adopting BPM in construction companies based on evaluation results analysis.
송영웅,최윤기,Song, Young-Woong,Choi, Yoon-Ki 한국건설관리학회 2008 건설관리 : 한국건설관리학회 학회지 Vol.9 No.6
Construction companies require management system to increase efficiency and profit because of receiving competition and globalizing business environment. Since 1990s, construction companies have made various attempts to innovate business structure both internally and externally by means of BPR, 6 Sigma, PI, and Workflow. Some improvements were made, but most of them were temporary, and insufficient to provide the much-needed promptness of business process in responding to the changes. Furthermore, the recent methods of applying BPM and practical using are limited to the theory and method of other industries, and also the attempts of applying BPM in construction industry are at the stage of theoretical approaching and examining in a few construction companies. Accordingly, this study deduces the necessity of adopting BPM based on change of business paradigm for construction companies and limits of current researches, failure causes and problems of application attempts of BPM and process management. And also, we analyze Advance of BPM and suggest the application method of business process management model for construction companies. 건설기업은 내 외부의 경영환경이 글로벌화 되고 수주경쟁이 치열해 짐에 따라 기업 운영 효율성 증대와 수익성 증대를 위한 경영체제에 대한 노력이 요구된다. 1990년 이후 건설기업은 프로세스 중심의 내 외부 업무구조를 개선하기 위하여 BPR, 6시그마, PI, 워크플로우 관리, BPM 등 다양한 시도가 있었으며 기업내부에서 개선된 기능을 일부 획득 했으나 일회성 사업에 머물렀으며 변화에 대한 업무 프로세스 민첩성의 제공은 미비하였다. 또한 최근의 BPM 적용과 실용화 방안에 대해서는 타 산업분야의 이론과 방법론에 국한되어 있으며, 건설기업의 BPM 적용을 위한 도입 시도는 일부기업에서만 개념적 이론적 접근 및 검토단계에 머무르고 있다(B사, H사, 2007년 기준). 따라서 본 연구에서는 건설기업의 경영 패러다임의 변화를 반영하고 건설기업의 업무 프로세스 경영 모델의 도입현황과 개선요구사항을 분석하고자 한다. 또한 건설기업의 BPM 도입을 위하여, 지속 가능한 업무 프로세스 경영 모델의 구축방안을 제시함으로서 건설기업 BPM의 발전방향을 제시하고자 한다.
오일.가스 플랜트 산업의 경쟁력 강화를 위한 기술경영 도입방안
송영웅,최윤기,Song, Young-Woong,Choi, Yoon-Ki 한국건설관리학회 2007 건설관리 : 한국건설관리학회 학회지 Vol.8 No.1
최근 오일 가스 플랜트 분야는 국제 유가의 상승, 에너지 수요의 증가로 인하여 프로젝트 발주가 증가하고 있으며, 중동지역과 전 세계 지역으로 시장규모가 증대되고 있다. 오일 가스 플랜트는 제조 및 처리공정과 기술개발에 따른 라이센스 관리 및 기술관리가 프로젝트의 성패에 중요한 사항이다. 오일 가스 플랜트의 경우 다수의 해외공사 수행 형태를 가지며 해외 선진 업체와의 경쟁이 더욱 중요하다. 이러한 시장에서 기술 경쟁력과 기술 우위를 확보하기 위해서는 기술개발에 따른 체계적인 경영 방식을 도입하여야 한다. 하지만 국내 오일 가스 플랜트 업체의 경우 해외 선진 업체보다 라이센스, 설계단계의 기술 경쟁력이 부족하며 '기술 투자 비용 대 효과를 최대화' 하는 요소기술의 기술경영 도입이 어려운 현실이다. 이는 기술개발 및 관리의 인식 부족과 연구개발 인프라 구축에 따른 부담이 커서 장기적인 기술전략이 부족하기 때문이다. 따라서 본 연구에서는 오일 가스 플랜트 산업의 대외 경쟁력 확보를 위한 기술경영 도입방안을 분석함으로서 중장기적 기술개발 지원과 기술경영 도입방안을 제시하였다. Recently orders of project in the field of oil & gas plant have been increased due to raising oil prices and consumptions. Domestic oil & gas companies are expanding into the Middle East area and all over the world. In the field of oil & gas plant, it is important to manage a technical control and a license that is occurred when developing the manufacturing processes and technologies. Because the oil & gas market has a lot of executions of the oversea construction, competitions between the advanced companies is more important. Therefore, we have to adopt systematic management style for achievements of the technical competitive power and the higher position. However, domestic oil & gas plant companies have not enough competitive powers of the license and the design phase. So, they are faced with difficulties of adopting the technology which is maximizing the effect of investments and scheduling a long-range plan. To achieve the technology management and the competitive power, this study proposes a long-range plan through the analysis of execution methods for technology management.
송영웅,조용선,김종우,임창범,김소리,김영훈,신상호 대한결핵 및 호흡기학회 2015 대한결핵 및 호흡기학회 추계학술대회 초록집 Vol.120 No.0
증례: 78세 여자 환자로 과거력상 고혈압, 협심증 심부전과 심방세동, 당뇨와 갑상선 저하증 만성 콩팥 병증 기왕력 있으며 2015. 04.29 척추성형술을 타원에서 시행하였다. 술후 지속되는 호흡곤란으로 수술한지 10일뒤 본원으로 전원되어 단순 흉부 방사선상 양측성 흉수 소견으로 심부전 급성 악화의증으로 심장내과 입원하여 이뇨제 투여 후 호전경과로 퇴원하였으며 이후에도 지속되는 호흡곤란으로 인하여 호흡기내과로 의뢰되었다. 이후 지속되는 흉통으로 응급실 내원하여 조영증강 흉부 CT를 시행하였다. CT상 미만성 폐동맥 색전증을 보이며 우하부의 폐렴 소견 보임에 대하여 항생제 및 와파린 항응고요법 시행하였고 한달 뒤 시행한 CT상 색전증의 변화는 없었으나 폐렴은 호전소견 보였으며 호흡곤란 악화없어 항응고요법 유지하며 경과 관찰중이다. 고찰: 경피적 척추성형술은 골시멘트를 붕괴된 척추체에 주사하는 시술으로, 합병증은 주로 누출과 관련되어 있다. 합병증을 줄이기 위해 가장 중요한 것은 정확한 시야 확보이며, 이를 통하여 누출을 조기에 확인하여 합병증을 예방할 수 있다. 본 증례에서는 술후 발생한 호흡곤란에 대하여 합병증으로 인하여 발생할 수 있는 색전술에 대하여 의심하지 못하고 과거력상 심부전의 악화 가능성만을 고려하여 진단이 늦어졌으며 증례의 CT상 미만성 폐동맥 색전증을 보이나 실제 막힌 폐동맥이 상대적으로 소수로 동반하는 감염의 호전 후 증상 호전을 보인것으로 생각된다. 척추성형술은 계속 시술이 증가하고 있으므로 이로 인한 폐색전증의 발생도 증가할 것으로 예상되므로경피적 척추성형술을 받은 환자가 호흡곤란이나 흉통을 호소하는 경우 골시멘트에 의한 폐색전증을 감별 진단에 포함시켜야 하며, 증상이 없는 환자의 경우도 반드시 시술 후 흉부 X선을 촬영하여 폐색전증 발생 유무를 확인해야 할 것으로 사료된다.
비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구
송영웅,최윤기,Song Young-Woong,Choi Yoon-Ki 한국건설관리학회 2003 건설관리 : 한국건설관리학회 학회지 Vol.4 No.1
건설 프로젝트의 자원관리는 공사원가의 절감, 건축물의 공정 및 품질확보에 직접적으로 관계되어 이외의 공사관리요소와 함께 매우 중요한 요소를 차지하고 있다. 하지만 자원소요계획은 공사초기에 수립되고 고려요소가 다양하여 전사적 차원의 자원소요계획을 수립하기에는 한계가 있고, 관리자간의 정보단절로 실적정보관리가 불가능하다. 건설공사의 유기적 관리를 위해서는 각 관리요소의 체계적 구성이 필요하며, 각 관리간의 사업수행정보와 실적자료의 주기적인 갱신으로 이루어져야 한다. 이에 현장변동상창을 반영하고 효과적인 자원소요계획을 수립하기 위해서는 비용 일정 통합관리의 실적 데이터를 이용하여 자원소요량 산출근거를 명확히 하고, 효율적인 자원소요계획체계를 구성하여야 한다. 본 논문에서는 비용$\cdot$일정 통합관리를 이용한 자원소요량 산출방법을 제시하였으며, 비용$\cdot$일정 통합관리를 이용한 자원 조달관리 업무프로세스를 분석하여 체계적인 자원소요계획 체계를 마련하였다. In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.
노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안
송영웅,최윤기,Song, Young-Woong,Choi, Yoon-Ki 한국건설관리학회 2005 건설관리 : 한국건설관리학회 학회지 Vol.6 No.6
노출 콘크리트 마감공법은 건축설계자의 입면 개념에 따라 일반 및 제물치장 콘크리트 마감공법과 더불어 다양한 마감품질과 표면형태를 나타내며 최근 적용사례가 꾸준히 증가하고 있는 추세이다. 노출 콘크리트 마감공법은 설계 및 시공수준, 마감면의 품질 및 평활도, 색상 및 질감에 따라 타 콘크리트 마감공법보다 공사비 투입이 증가되고 체계적인 설계 및 시공관리가 요구됨에도 불구하고 노출 콘크리트 마감공법에 대한 정의가 불명확하고 설계, 시공, 유지관리 단계별 관리 방안이 구체적으로 제시되지 않아 원가상승, 시공품질 저하, 시공성 저하 등의 문제가 유발되고 있다. 본 연구에서는 노출 콘크리트 마감공법의 체계적인 관리방안 제시를 위하여 국내의 불명확한 노출 콘크리트 마감공법의 정의를 문헌조사 및 사례조사를 통하여 명확하게 제시하고, 노출 콘크리트 마감공법의 색채균일성, 균열발생 억제, 콘크리트 충전성확보 등 노출콘크리트 마감공법의 요구사항과 결함유형을 분석하였다. 이를 바탕으로 노출 콘크리트 마감공법의 시공프로세스를 타 콘크리트 마감공법과 비교 분석하였으며, 노출 콘크리트 마감공법의 설계단계, 시공계획 및 관리단계, 유지 보수 단계별 관리방안을 제시하였다. Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.