HANARO(High Flux Advanced Neutron Application Reactor) design was started from 1985 and was constructed in 1995 by KAERI(Korea Atomic Energy Research Institute). The document control book was written by hand and hard-copy was kept at that time. JRTR(Jordan Research and Training Reactor) was contracted for export to Jordan March 2010 by KAERI Consortium. This contract is a matter for congratulation of export of first made-in-Korea nuclear system. NRR(New Research Reactor) officially launched in April 2012. The document control system is controlled by PPM (Project Procedure Manual) and QAP(Quality Assurance Procedure) and ANSIM(KAERI Advanced Nuclear Safety Information Management) was built for JRTR. ANSIM system consists of the document management holder, document container holder and organization management holder. This system was registered about 2,000 design output like DDA(Document Distribution for Agreement), design documents, design drawings and project manger memorandum. The system design for JRTR was smoothly performed using ANSIM. NRR set to separated exclusive system that was based on JRTR ANSIM. Folder of nuclear laws, codes and standards was added to that system and those will be useful during designing. The project and quality assurance plans and procedures has been managed from design documents separately. Above all things, independent review and ALARA(As Low As Reasonably Achievable) review were operated for nuclear safety at ANSIM. And cover and body of design document were combined and backup system was established. After then, system upgrade and operation pursue the effect analysis by design change for accomplishment of the research reactor project.
박국남,지대영,이정영,안성호,김학노,김영진,유현재,유성연 한국기계기술학회 2007 한국기계기술학회지 Vol.9 No.4
FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.
박국남,최창웅,심철무,Park, Guk-Nam,Choe, Chang-Ung,Sim, Cheol-Mu 대한기계학회 2000 大韓機械學會論文集A Vol.24 No.9
The HANARO (High-flux Advanced Neutron Application Reactor) has operated since 1995. The Cold Neutron(CN) hole was implanted in the reflector tank from the design stage. Before a vacuum chamber and a moderator cell for the cold neutron source are installed into the CN hole, it is necessary to measure the exact size of the inside diameter and thickness of the CN hole to prevent the interference problem. Due to inaccessibility and high radiation field in the CN hole, a mechanical measurement method is not permitted. The immersion ultrasonic technique is considered as the best method to measure the thickness and the diameter. The 4 axis manipulator of the 2 channel of a sensor module was fabricated. The transducer of 10 MHz results in 0.03 nun of resolution. The inside diameter and thickness for 550 points of the CN hole were measured using 2 channel ultrasonic sensors. The results showed that the thickness is in the range of 13-6.7 mm and inside diameter is in the range of o 156-165. These data will be a good reference in the design of a cold neutron source facility.