RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    검색결과 좁혀 보기

    선택해제
    • 좁혀본 항목 보기순서

      • 원문유무
      • 음성지원유무
      • 학위유형
      • 주제분류
        펼치기
      • 수여기관
        펼치기
      • 발행연도
        펼치기
      • 작성언어
      • 지도교수
        펼치기

    오늘 본 자료

    • 오늘 본 자료가 없습니다.
    더보기
    • 무선 센서 네트워크에서의 신뢰성 향상을 위한 라디오 인지 라우팅 프로토콜

      김용표 한양대학교 대학원 2010 국내박사

      RANK : 247631

      In WSNs(Wireless Sensor Networks), transmission errors occur frequently due to node failure, battery discharge, contention or interference by objects. Although Directed Diffusion has been considered as a prominent data-centric routing protocol, it has some weaknesses due to the unexpected network errors. In order to address these problems, we proposed a radio-aware routing protocol to improve the reliability of Directed Diffusion in lossy WSNs. The proposed algorithm is aware of the network status based on the radio information from MAC and PHY layers using a cross-layer design. The cross-layer design can be used to get detailed information about the current status of the wireless network such as link quality or transmission errors of the communication links. The radio information indicating variant network conditions and link quality was used to determine an alternative route that provides reliable data transmission under lossy WSNs. According to the simulation result, the radio-aware reliable routing protocol showed better performance in both grid and random topologies with various error rates. The proposed solution suggested the possibility of providing a reliable transmission method for QoS requests in lossy WSNs based on the radio-awareness. The energy and mobility issues will be addressed in the future work. 무선 센서 네트워크는 배터리 방전, 사물에 의한 간섭이나 센서 노드의 고장 등으로 인하여 통신이 불가능한 상황이 빈번하게 발생된다. 이러한 무선 센서 네트워크의 특징은 데이터 손실과 경로 손실을 발생시키는 주요 원인이며, 무선 센서 네트워크의 데이터 수집 신뢰성을 떨어뜨리는 심각한 문제를 일으킨다. 기존의 무선 센서 네트워크 라우팅 프로토콜 연구는 에너지 효율적인 통신 기법을 중심으로 다양한 기법들을 제안했지만 데이터 손실을 막기 위한 신뢰성에 관한 연구는 많지 않았다. 특히, Directed Diffusion은 데이터 중심 라우팅 알고리즘으로써 무선 센서 네트워크의 특징을 잘 반영한 라우팅 프로토콜이다. 그러나 Directed Diffusion 역시 예기치 못한 통신 에러로 인한 데이터 손실을 극복하기 위한 대처는 미흡하다. 본 논문에서는 Directed Diffusion 기반의 신뢰성 향상을 위한 무선 인지 센서 네트워크 라우팅 프로토콜을 제안한다. 제안 프로토콜은 네트워크 계층에서 데이터 손실을 극복하기 위한 방안을 제시하였다. 제안 프로토콜은 교차계층 기법을 이용하여 무선 네트워크의 상황을 인지하고 에러 상황을 판단하여 링크 품질과 노드 통신 가능여부 정보를 경로 설정 알고리즘에 적용함으로써 에러 발생이 빈번한 네트워크에서 신뢰성 있는 데이터 전송 기법을 제시하였다. 또한, 제안 알고리즘은 다양한 에러율과 노드수를 갖는 시뮬레이션을 통해 전송률과 데이터 비율 측면에서 매우 우수한 성능을 보임을 증명하였다.

    • 曾鞏散文硏究

      김용표 國立臺灣大學 1995 해외박사

      RANK : 247631

      증공(曾鞏)은 중국 고전 산문의 으뜸으로 꼽을 수 있는 당송팔대가(唐宋八 大家)중의 한명이다. 아울러 중국 산문의 정통파로 인정받는 명대(明代)의 당송파(唐宋派)와 청대(淸代)의 동성파(桐城派)에 의해 가장 모범적인 문장을쓴 작가로 추존받았다. 그러나 오늘날 학계의 증공에 대한 일반적인 평가는 과거와는 완전히 상반 된 입장에 놓여있다. 예컨대 수많은 《중국문학사》들은 증공에 대해 매우 간략하게 기술하고 있거나, 심지어 아예 언급조차 하지 않는 경우도 있는 것 이다. 또한 1980년대 초반까지만 해도 그에 관한 논문은 전무한 실정이었다. 증공에 대한 고금의 완전히 상반된 평가는 도대체 어떤 요인에 기인한 것일까? 본 학위 논문의 가장 주요한 저술 동기는 바로 이 점에 있다. 본 논문은 서론과 결론 부분을 제외하면 모두 다섯 Chapter로 이루어져 있 는 바, 제2장과 제3장에서는 먼저 그의 생애와 문집의 판본 및 장르 별로 그 산문의 외형적 형태를 고찰해 보았다. 그러나 본 논문의 핵심 부분은 역시 4·5·6장에 있다. 증공에 대한 고금의 상반된 평가는 두가지 측면에서 고찰될 수 있다. 첫째는 사상적인 측면이다. 오늘날 학계는 일반적으로 증공의 사상이 지나치게 고루하여 현실성이 결여되어 있다고 인식하고 있는 바, 이는 그 사상에 대한 불완전한 인식으로부터 비롯된 것이다. 제4장은 그 사상이 비록 유가의 사맹(思孟)학파에 뿌리를 두고 있으나 「치국평천하(治國平天下)」를 통해 대동사회(大同社會)의 구현을 궁극적 목표로 삼은 것임을 고찰하였다. 제5장은 그의 문학 이론과 창작이 바로 이러한 현실적 목표를 구현하기 위 한 충실한 실천과정이었음을 그 작품의 내용을 구체적으로 분석해 봄으로써 증명해 보았다. 그러나 증공의 문학 작품은 대체로 보아 형상성(Image)과 서정성이 결여되어 있다는 약점을 안고 있는 것이 사실이다. 바로 이러한 점이20C에 들어와 그에 대한 평가가 급락된 가장 중요한 이유일 것이다. 제6장은 증공이 그의 작품 창작에 있어 형상성과 서정성을 배제시킨 이유를분석함과 동시에, 그가 「문자」가 아닌 「소리」라는 또 다른 방법으로 독자에게 작가의 「감정」을 전달하고 있음을 주목하고, 과거 산문가들이 추구했 던 이른바 문장의 「기(氣)」의 의미가 바로 「소리」의 운용을 통한 「감정 」의 전달이었음을 상기시켜 보았다. 아울러 산문 작품속에 내재된 이러한 「음률」에는 「양강(陽剛)」과 「음 유(陰柔)」의 미학적 특성이 존재하고 있음을 규명하여, 고대 산문가들이 증 공의 산문을 높이 평가한 이유가 이러한 「소리」의 예술적 효과 때문이었음 을 고찰하여 보았다. 결론적으로, 문학은 「문자」를 통한 감정의 전달방법이외에도 「소리」를 통해 감정을 전달하는 방법이 있음을 새롭게 인식하고, 이 새로운 분석방법으로 고대 산문을 재조명할 필요가 있음을 증공의 산문을 연구한 가장 큰 수확 으로 꼽을 수 있다 하겠다.

    • 통합기술수용이론(UTAUT)을 활용한 스마트 팩토리 수용의도와 행동결정에 관한 실증 연구

      김용표 동국대학교 경영대학원 2022 국내석사

      RANK : 247631

      세계경제는 자본주의의 발전과 함께 세계화가 가속화되면서 글로벌 경영환경이 복잡·다양해지고, 코로나19 팬데믹과 우크라이나 전쟁 등 다양한 변수들로 인해 글로벌 공급망이 위기를 맞이하면서 산업 전반에 걸쳐 양극화와 불평등은 더욱 심화되었다. 그리고 원가절감, 인건비 상승에 따른 고용 불안정 등 대내·외 환경요인들로 제조업의 생산과 고용, 기술혁신을 창출하는 기반이 흔들리면서 성장 동력을 잃은 제조업이 글로벌 경쟁력을 강화하기 위한 노력으로 IT기술과 접목한 기술혁신의 필요성이 강조되고 있고, 제조업 강국인 미국, 독일, 일본 등 선진 국가들은 제조업의 경쟁력을 회복하기 위해 국가 차원에서 정책을 수립하고 4차 산업혁명 기술의 핵심인 스마트 팩토리의 도입을 적극적으로 추진해 나가고 있다. 이에 우리나라도 제조업의 경쟁력을 강화하기 위해 스마트 팩토리를 도입하고 혁신하고자 정부 차원에서 적극적으로 지원정책을 확대해 나가고 있다. 그러나 선진국 대비 스마트 팩토리의 도입이 늦고, 대기업 위주의 도입이나 확산에 치중하여, 특히 대기업보다 자금, 인력, 그리고 설비 등 모든 면에서 열악한 중소기업의 입장에서 스마트 팩토리와 같은 신기술의 도입은 한 단계 도약할 수 있는 발판을 마련해 주기 때문에 스마트 팩토리 도입에 대한 관심이 확대되고 있으나, 중소기업이 처한 한계로 인해 도입을 망설이거나 추진조차 하지 않는 중소기업이 많은 것이 현실이다. 최근에는 중소기업이 처한 상황을 이해하고, 효율적이며 체계적인 스마트 팩토리 도입을 위한 연구가 학계에서 확대되고 있고, 제조업의 혁신을 가져다줄 스마트 팩토리의 도입에 있어 수용의도와 행동결정은 의미가 있다고 판단하여 본 연구는 국내 중소기업의 성공적인 스마트 팩토리 도입 및 활용을 위한 방법을 제안하는 문제인식에서 비롯되었으며, 실증연구 결과를 통해서 중소기업이 스마트 팩토리를 성공적으로 도입하는데 필요한 정보를 제공함으로써 제조업 전반에 경쟁력을 강화하는 실무적 기여를 목적으로 하였다. 연구의 목적을 달성하기 위하여 선행연구를 바탕으로 스마트 팩토리 신기술 수용의도를 파악하는데 유용한 통합기술수용이론(UTAUT)을 활용하였으며, UTAUT의 하위속성인 성과기대, 노력기대, 사회적 영향, 촉진조건을 독립변수로 하여 이들 각각의 요인이 스마트 팩토리 도입의 도와 사용행동에 직접적인 영향을 미치는지에 대한 검증을 수행하였다. 선행연구에서 검증된 변수를 채택해 연구모형을 개발하고 가설을 설정한 후 국내 중소기업을 대상으로 스마트 팩토리 도입 경험이 있거나 도입 중에 있는 기업이나 임직원을 대상으로 2021년 12월 1일부터 2022년 1월 10일까지 40일간 응답자가 설문지에 자기기입법으로 작성하는 설문조사를 수행하였다. 배포된 설문지 400부 중 회수된 282부에서 결측값을 제외한 유효응답 261부를 실증분석에 사용하였고, 실증분석은 통계프로그램 IBM SPSS Statistics 26.0을 이용하고, 측정 변수들간의 신뢰성과 타당성을 검증하기 위해 Smart PLS를 사용하였으며, 실증분석 결과를 요약하면 다음과 같다. 첫째, 가설1.‘UTAUT 요인이 수용의도에 정(+)의 유의한 영향을 미칠 것이다’의 분석 결과, 성과기대와 노력기대는 유의수준을 확보하지 못하여 기각되었으나, 사회적 영향과 촉진조건은 99% 수준에서 정(+)의 영향을 미쳐 채택되었다. 둘째, 가설2.‘UTAUT 요인이 지속사용의도에 정(+)의 유의한 영향을 미칠 것이다.’의 가설 검증 결과, 가설1과 달리 성과기대는 95% 수준에서, 노력기대는 99% 수준에서 정(+)의 영향을 미쳐 채택되었으나, 사회적 영향과 촉진조건은 유의수준을 확보하지 못하여 기각되었다. 셋째, 가설3.‘스마트 팩토리 수용의도는 지속사용의도에 정(+)의 유의한 영향을 미칠 것이다.’에서는 지속사용의도의 R2 = 0.354로 나타나 약 35.4%의 설명력이 있는 것으로 확인되었고, 수용의도는 지속사용 의도에 유의미한 영향을 미치는 것으로 검증되었다. 넷째, 가설4.‘스마트 팩토리 수용의도는 UTAUT 요인과 지속사용의도 간 매개역할을 할 것이다’에서는 매개효과 검증을 위해 매개변수(수용의도)가 포함된 완전모형(Full)과, 매개변수가 제외된 감소모형(Reduced)의 설명력 변화량을 확인하였고, 그 결과를 바탕으로 가설4의 세부적인 가설을 검증하기 위해 Sobel Test를 수행한 결과 성과기대와 노력기대는 매개효과가 유의하지 않은 것으로 나타났으나, 사회적 영향과 촉진조건의 매개효과는 각각 Sobel 검증 값 2.609, 2.741로 나타나 채택되었다. 다섯째, 가설5.‘혁신에 대한 친숙성이 UTAUT 요인과 수용의도와 지속사용의도 간 조절역할을 할 것이다.’에서는 분석결과 모든 관계에 서 유의수준을 확보하지 못하여 기각되었다. 이에 본 연구는 신기술이 기존 시스템에 비해 유용성 증대, 생산성 향상, 원가절감과 적응 용이성 및 효율성 증대 등의 기대는 도입에 영향을 미치지 못하지만, 협력사의 권장이나 주변 관계자들의 의견 등과 조직내에 신기술 도입에 필요한 다양한 촉진요인이 구축되어 있을 경우 적극적인 도입이 이루어진다는 것을 알 수 있다. 그러나 지속사용 여부에 대한 검증 결과는 도입의도와 달리 신기술 도입에 대한 성과나 노력기대가 클수록 지속적으로 사용할 의지가 있다고 보여 신기술에 대한 유용성과 성과가 도입 후 발생할 것이란 기대감이 작용한 것으로 보며, 도입의도와 지속사용의도의 관계에서도 그 효과가 검증되어 스마트 팩토리 도입에 부정적인 생각을 가졌던 조직 구성원들이 도입 초기에는 변화나 자신의 입지가 위축될 수 있다는 등의 부정적 요인으로 저항을 하기도 하지만 도입 후 얻게 되는 다양한 혜택으로 인해 지속적으로 사용하고자 하고, 신기술의 도입으로 인한 만족도를 상승시키고자 현재 스마트 팩토리의 수준을 고도화하려는 의지가 강해진다는 것을 알 수 있다. 따라서 혁신기술에 대한 수용의도가 높으면 혁신기술 수용 후 대부분 적극적으로 활용하는 행동결정에도 영향을 미치게 되므로 혁신기술에 대한 이해나 혁신의지, 혁신에 대한 인식이 높아도 그것이 지속사용의도와 연관되려면 혁신에 대한 정확한 이해가 필요하다는 것을 반증하는 것이나, 본 연구결과를 모든 제조업에 일반화 하기에는 한계가 있으므로 향후 분석 기업을 확대하고, 산업별로 세분화하여 확장된 대상 기업들을 통해 연구의 객관성을 높이는 노력이 필요하고, UTAUT요인 외에도 조직이 처한 다양한 환경요인(최고 경영자의 태도, 조직 구성원의 인식, 시스템 구현 역량, 정부의 지원 등)을 활용한 연구가 필요하다.

    • Endmill 加工에 依한 眞丹度와 表面粗度에 關한 硏究

      김용표 朝鮮大學校 産業大學院 1983 국내석사

      RANK : 247631

      Holes of 20㎜ in depth were perforated on the SM30C with milling machines, using endmill of 16㎜ in deameter. Roundness and surface roughness were measured for the various cutting speed and feed rate. The results can be summarized as follows: 1. The faster the cutting speed is, the better the roundness is under the constant feed rate. 2. The slower the feed rate is, the better the roundness is under the constant cutting speed. 3. As the cutting speed and the feed rate are slower, surface roughness along the direction of feeding. 4. Surface roughness and roundness in the direction of rotation of endmill have similar trend.

    • 방사무늬김의 색소변이체 특성에 관한 연구

      김용표 여수대학교 1998 국내석사

      RANK : 247631

      요약 : 김속 식물의 색소변이체는 생리학적, 생화학적, 유전육종학적, 분자생물학적, 유전자공학적 연구 등에 유용하다. 본 연구에서는 해조류에 있어서의 실험 모델 식물을 확립하기 위한 연구의 일환으로서 방사무늬김 색소변이체의 몇가지 특성을 검정하였다.(중략).

    • 호텔 마케팅의 促進戰略에 관한 硏究 : 광주·전남지역의 관광호텔을 중심으로(laying special emphasis on the Tourist Hotels in Kwangju and Chonnam area)

      金容杓 全南大學校 1993 국내석사

      RANK : 247631

      國民經濟가 성숙 발전됨에 따라 호텔산업의 市場 규모는 확대되고 다양화되고 있지만 그에 비해 호텔의 마케팅 戰略 水準은 質的 向上이 이루어지지 않고 있는 실정이다. 따라서 觀光産業의 開放, 同種 産業내의 경쟁등 변화하는 호텔 産業 환경에 대처할 효율적이고 先進的인 마아케팅 전략을 탐색할 필요가 있다. 특히 영세하고 非專門的 經營이 보편화 되어 있는 광주, 전남지역 호텔의 마케팅 촉진 實態를 分析하여 지방호텔에 적용가능한 마아케팅 촉진 방안을 모색하는데 硏究 目的을 두었다. 본 연구의 방법은 국내외 참고 서적과 文獻 및 관련 연구 기관의 정기 간행물을 중심으로한 문헌 調査 分析 方法과 光州·全南지역의 12개 관광호텔 판촉 담당자와 심층 面談으로 수집된 자료를 통한 실태 조사 방법을 병행하였다. 제Ⅰ장에서는 硏究의 目的, 方法과 範圍를 밝히고, 제Ⅱ장에서는 호텔 마케팅 전략의 理論的 背景을 서술하였으며, 제Ⅲ장에서는 한국 관광 및 관광 호텔의 現況을 살펴 보고, 제Ⅳ장에서는 설문 조사를 통하여 관광 호텔 마케팅의 촉진 실태를 분석하였으며, 제Ⅴ장에서는 실증분석 내용의 結果로써 문제점과 改善 方案을 제시하였고, 제Ⅵ장에서는 結論으로 정리하였다. 이상의 연구결과 제시된 개선방안은 다음과 같다. 첫째, 경영자 및 마케팅 담당자는 호텔산업 시장의 變化와 그 변화의 수용에 있어서 認識의 轉換을 기해야 한다. 둘째, 마케팅의 感應的 組職을 創出해야한다. 마케팅 전담부서를 조직내에 도입하고 마케팅 훈련을 構成員에게 실시해야 한다. 세째, 서어비스의 品質 管理 體系를 형성해야 한다. 네째, 촉진 豫算을 擴大해야 한다. 현재 상황이 아닌 보다 미래 지향적인 촉진 지원책을 마련해 주어야 한다. 다섯째, 촉진 믹스를 改善해야 한다. 보다 공격적인 廣告 戰略의 採擇, 다양한 弘報 형태 개발, 인적 판매시 販賣 目標의 적합한 할당 및 보상 체계 수립, 독창적인 販賣 促進物의 개발이 이루어져야 한다. 여섯째, 가격믹스가 개선 되어야 하고 편익 서어비스가 다양하게 개발되어야 한다. 위와 같은 개선방안들이 종합적으로 믹스될 때 마아케팅의 效用性, 적게는 촉진의 효용성이 提高될 것이다. Nowadays, hotel industries are continuously growing up in the modern society, Generally, the hotel industry in Korea is only quantitively enlarged by increasing the number of international tourists in the world. But, it is not systemetically established a suitable marketing strategies for the characteristic of the service industry. Moreover, the hotel industry of the provinces have small scale market and depend on the revenue of business incidental rather than the revenue of a drawing rooms, are in short of interest and efforts in promotion activity. In this respect, the purpose of this paper is to find the effective promotional strategies for the tourist hotel marketing through the analysis of present situation and problem of the first class hotels located in Kwangju.Chonnam area. In order to achieve this purpose, the methods of this study are used a literature survey and a fields survey analysis. the result briefly summarized is as follows: A) General problems of marketing promotion strategies for the tourist hotel in Kwangju.Chonnam area. · the perception deficiency about marketing concepts. · the development shortage of marketing management system. · the unreasonal promotion budgeting. · the development shortage of service products. · the failure of organic combination in promotion mix. B) Improvement proposal. perception adjustment of top manager and promotion executive about marketing market. · forming the responsive organization in marketing. · forming service quality control system. · the enlargement of promotion budgeting following the market segmentation. · the development of effective advertising program. · the establishment of voluntary attitude about publicity. · the organization of personal selling efforts. · the differentiation of sales promotion means. · the composement of the promotion mix for the satisfaction of customer's needs. In conclusion, the promotional strategies of hotel service marketing must be recognized with the business strategy in the long terms and must be itself the development of continuously service marketing mix for the changing customer's needs and management environment.

    • 토목건설현장의 공정관리 실태 분석을 통한 효용성 있는 공정관리 방안 연구

      김용표 忠南大學校 大學院 2017 국내석사

      RANK : 247631

      최근 한국에서의 경제성장 및 사회 변화에 따라서 건설산업은 사회 다양한 각 분야로부터 증가하는 요구들에 직면하고 있다. 이러한 다양한 사회의 요구에 대응하면서 성공적으로 건설 공사를 완수하기 위해서는 체계적이고 합리적인 공정관리 기법의 연구개발과 부단한 현장 활용을 통한 지속적인 발전이 필요하다. 이에 본 연구에서는 먼저 건설현장의 공정관리 실태를 파악하여 개선점을 도출하고 현장의 전문가 경험을 바탕으로 현장에 효용성 있는 공정관리 방안을 제안하였다. 본 연구의 구체적인 연구 과제는 다음의 세 가지이다. 첫째, 건설현장 기술자들의 공정관리에 대한 중요도 인식 수준 및 이해도 수준은 어느 정도인가? 둘째, 국내 토목공사 현장에서 일정계획, 자원계획, 원가계획, 진도관리를 시행하며 공정관리 업무를 수행하고 있는가? 셋째, 현장에 효용성 있는 공정관리 방안은 무엇인가? 위와 같은 연구 과제를 해결하기 위해 문헌을 바탕으로 공정관리 이해도를 측정하는 설문 문항 5개, 공정관리 중요도 인식을 측정하는 설문 문항 8개를 개발하였다. 설문 대상은 국내 토목건설현장에서 공사 관리를 수행하고 있는 현장기술자 29명이었으며, 설문과 동시에 심층면접을 실시하였다. 또한 국내에서 공사비가 1,000억 원 이상인 토목건설현장 11곳을 방문하여 현장에서 공사 관리에 사용하고 있는 시공팀 공정표를 분석하여 현장의 공정관리 수준을 파악하였다. 공정관리 주요 항목 8가지 사항에 비추어 공정관리 수준이 미흡하다고 판단된 현장에서는 심층면담을 통해 공정관리가 정착되지 못하는 원인을 분석 하였다. 세 번째 연구 과제를 해결하기 위해서 토목건설현장 공정관리 현황 조사, 문헌 및 선행 연구논문 고찰, 현장의 전문가 경험을 바탕으로 단순하면서 현장에서 효용성 있는 공정관리 방안을 WBS 분류에서부터 공정분석, 성과관리 및 성과향상 방안까지 제안하였다. According to recent economic growth and social development in Korea, the construction industry is facing growing demands from various sectors of society. In order to successfully accomplish the construction project while meeting various social demands, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. Finally, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. There are three main topics to be discussed in this study. First, what is the level of understanding of field engineers in the construction site about the importance of schedule management in construction project? Second, whether the eight main elements of schedule management are actually implemented and performed in the domestic construction sites? Third, what is the effective process management technique in the construction site? In order to find solution to the first topic above, five survey questionnaires designed to measure the understanding of process management and eight survey questionnaires designed to measure perception of the importance of schedule management are developed with reference to various materials. Total twenty nine (29) field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews with the field engineers were conducted as the same time. In addition, in order to find out the level of schedule management in the construction site, I visited eleven (11) civil engineering construction sites having a contract cost of over 100 billion won in Korea, and inspected the milestones of construction team of the construction sites. For the construction sites where the level of schedule management was determined to be low based on the eight main elements of schedule management, in-depth interviews were conducted to analyze the reason why the eight main elements of schedule management were not fully implemented in the construction site. As for the third topic, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site, review of prior research papers and literature, and in-site experience of the researcher.

    • 토목 건설현장 생산성 향상을 위한 융복합 공사관리 프로세스 모델 개발

      김용표 忠南大學校 大學院 2020 국내박사

      RANK : 247631

      The productivity stagnation of construction industry is an important issue in countries where construction works are being actively carried out. Although there have been various researches and on-site efforts to find a solution for improving the productivity in the construction industry, it is difficult to find distinct changes or marked improvements in the construction industry. Therefore, various proposals based on a new perspective on the current construction management practice are being presented. First, hybrid methodologies are emerging to derive management methods appropriate for various environments in construction projects. At the same time, convergence is being attempted to suggest a new paradigm of construction project management by combining various other fields of researches and methodologies. Second, construction management issues are now expanding to include a problem of people who understand a situation differently based on their personal inclination, experience, and environment. It considers one of the main causes of construction project failures to be caused by errors and prejudice of personal intuition, and proposes a solution. Third, many studies propose the 'Simplification' as a fundamental component of project success. The difficulty in improving productivity of construction site is due to the complexity of construction site management. The productivity improvement of construction site is carried out through continuous measurement, analysis and implementation. In this case, the speed and reliability of the measurement should be ensured, and it starts with collecting information quickly and accurately. However, the complexity of the system and the need for extensive data collection results in inaccurate information collection and measurement delays. Accordingly, the need of 'Simplification' for accurate information collection in real time is continuously emphasized. In addition, in various studies for productivity improvement, innovations such as design review, strengthening of planning processes, improving reliability and monitoring of information collection during construction, improving schedule management, and schedule-based cost accounting etc. are constantly proposed. The purpose of this study is to develop and verify a concrete and effective construction management process in construction stage. To this end, this study focuses on convergence, verification enhancement, and simplification to improve productivity of the construction project. In order to develop the concrete and effective construction management process, the research results of various process experts were summarized to derive the key success factors of the construction management process. The comparison between PMBOK6th (2017) and PMBOK5th (2013) was conducted to identify the recent project management trends. Through this process, the directions and goals of the research process were established. In addition, construction project management methodologies, such as Lean, Agile, and Hybrid construction project management methods, were reviewed to derive application problems and useful implications. In addition, three domestic civil construction sites were analyzed in detail to verify the performance of the construction management process, and through this, problems and implications were derived. Based on the theoretical review and the results of the site analysis, a process model to improve the productivity and practical application at the construction site was developed. It is “Fusion and Convergence Management Process Model”(hereinafter called “FCMP”), which focuses on Convergence, Enhanced Verification, and Simplicity as key values and is based on 20 core principles. FCMP includes risk management in addition to the three key management elements of the project presented by PMBOK, Design (Scope), Schedule, and Cost Management, refines detailed processes by activity, and integrates each process to clarify the interrelationships and dependencies of management elements. In addition, the core elements of each stage of the FCMP were derived and a field expert survey with more than 15 years of experience (90% over 20 years) in civil engineering was conducted to confirm the suitability of the details and the adequacy of the site application. The characteristics of the Fusion and Convergence Management Process Model (FCMP) developed in this study, which emphasizes verification enhancement and simplification, are as follows. First, it integrates Lean's waste elimination and objectivity of measurement, Agile's continuous verification of short iterations, and hybrid philosophy. Second, it includes human perception in the scope of verification to minimize the bias and errors of individuals and organizations and enhances the verification by documenting various project information. In addition, the verification results in the process, instead of the final verification results of the whole process, are applied to the construction site in real time by using a short repetition period. The errors of customs and practices are verified by reevaluating measurement criteria, constraints, assumptions, etc., which were taken for granted, through documentations. Third, the complex management system is simplified through minimizing the collection of information by using the key management factors derived based on the characteristics of the construction site, and through simplifying the measurement and analysis by applying the cycle time. Fourth, instead of the traditional management cycle, [P (Plan) →D (Do) →C (Check) →A (Action)], a new management cycle, [P (Plan)→DO (Documentation)→AC (Appropriate Check)→ PD(Pilot Do)→TC (Trust Check)→CP (Change Plan)→D (Do)→C (Check)→A (Action)], which focuses on plan adequacy, plan reliability and continuous verification, is presented as a construction site management cycle. For the empirical verification of effectiveness and efficiency of FMCP proposed in this study, FMCP was applied to unexcavated excavation work, dam construction, and tunnel construction sites. The results of sites application are as follows. First, as a result of the empirical verification, the assumptions, hypotheses, and constraints of the design and construction that were taken for granted could be changed. Second, in all three sites, a work breakdown system (WBS) capable of rapid iterative verification was established, and measurement and analysis were simplified with Cycle Time. Third, it confirms that expert perception, even if the expert has long experience, needs objective verification procedures. Fourth, in the two construction sites (dam construction and tunnel construction) that actively embraced FCMP, the compliance of construction schedule (dam construction) and shortened construction schedule of 11 months (tunnel construction) were achieved. With the core values ​​of convergence, simplification, and reinforcement of verification based on the construction management researches conducted so far, this study suggests a new direction for construction management of civil construction sites by developing a construction management process that can be carried out by on-site practitioners. 건설산업이 활발히 수행되고 있는 국가에서의 생산성 정체문제는 중요한 이슈이다. 건설산업 생산성 문제 해결을 위한 국내외 다양한 연구와 현장의 노력이 있었지만 뚜렷한 변화와 개선의 모습은 찾아보기 어렵다. 따라서 기존의 건설사업관리 문제와 해결 방안에 대해 새로운 시각에서 다양한 의견이 제시되고 있으며 다음 세 가지로 요약 할 수 있다. 첫째, 다양한 건설 프로젝트 환경에 적합한 관리방법을 도출하기 위해 기존의 이론이나 방법론간의 다양한 새로운 조합을 시도하는 하이브리드방법론이 대두되고 있으며, 이와 함께 다양한 타 분야와의 ‘융복합’이 시도되고 있다. 둘째, 공사관리 문제에 대한 접근이 사람의 개인적 성향, 경험, 환경 등에 따라 상황을 다르게 인식하는 사람의 문제로 확대되고 있다. 이는 프로젝트 실패의 주요 원인 중 하나를 개인 직관의 오류와 편견으로 보고 이를 해결하고자 하는 노력이며 이는 개인의 주관적 퍈단은 구체적‘검증’을 통해 객관성을 확보해야 한다는 것이다. 셋째, 많은 연구에서 프로젝트 성공의 기본요소로 제시하는‘단순화’이다. 현장관리의 복잡함은 현장의 생산성 개선을 어렵게 만든다. 생산성 개선은 지속적인 측정과 분석, 그리고 실행을 통해서 이루어진다. 이때 측정은 신속성과 신뢰성을 확보해야한다. 이는 신속하고 정확한 정보수집에서 시작한다. 그러나 시스템의 복잡함과 방대한 자료 수집의 요구로 인해 부정확한 정보수집과 적기 측정이 지연되고 있다. 따라서 정보수집을 실시간으로 정확하게 수행하기 위한‘단순화’의 필요성이 지속적으로 강조되고 있다. 또한 다양한 생산성 향상 연구에서 설계검토, 계획 프로세스 강화, 시공중 정보수집의 신뢰성과 모니터링 강화, 일정관리 성숙도 향상, 일정기반 원가계획수립 등 전반적인 혁신을 꾸준히 요구하고 있다. 이에 본 연구에서는 현장 생산성 향상을 목적으로 융복합, 검증 강화, 단순화를 핵심으로 하는 구체적이며 효용성 있는 시공단계 공사관리 프로세스를 개발하고 현장적용을 통해 효과를 확인 하였다. 프로세스 개발을 위해 다양한 프로세스 전문가들의 연구결과를 정리하여 건설 프로세스 구축의 핵심 성공요소를 도출 하였다. 최신 프로젝트 관리경향을 확인하기 위해 PMBOK6th (2017)과 PMBOK5th (2013)을 비교하였다. 이를 통해 연구 프로세스 구축의 방향과 목표를 설정하였다. 또한, 건설사업관리 방법론인 린(lean), 애자일(agile), 하이브리드(hybrid) 등 건설사업관리 발전과정을 고찰하여 적용상의 문제점과 유용한 시사점을 도출하였다. 또한 국내 토목 건설현장의 공사관리 프로세스 수행 정도를 확인하고자 3곳의 현장을 상세하게 분석하여 문제점과 시사점을 도출하였다. 이론적 고찰과 현장분석 결과를 바탕으로 현장 실무 적용성이 높고 생산성을 향상시킬 수 있는 프로세스 모델을 개발하였다. 개발한 모델은 “융복합, 검증강화, 단순화“라는 세가지 핵심가치와 20가지의 핵심원리를 기반으로 하는“융복합 공사관리 프로세스 모델(Fusion and Convergence Management Process Model :이하 FCMP)”이다. FCMP는 PMBOK에서 제시하는 프로젝트 3대 핵심 관리요소인 설계(범위), 일정, 원가관리에 리스크관리를 포함하여 세부 프로세스를 활동별로 구체화하며, 각각의 세부 프로세스간 상호 연관성과 의존관계를 명확하게 하는 통합 프로세스를 제시하였다. 또한, FCMP의 단계별 핵심 항목을 도출하고 시공분야 15년 이상 경력(20년 이상 90%)의 시공전문가에게 설문 조사하여 세부내용에 대한 적합성과 현장 적용의 타당성을 확인하였다. 본 연구에서 개발한 검증강화, 단순화를 강조한 융복합 공사관리 프로세스 모델(FCMP)의 특징을 요약하면 다음과 같다. 첫째, 린의 낭비제거와 측정 기준의 객관화, 애자일의 짧은 반복주기의 지속적 검증, 하이브리드 철학 등을 융복합 하였다. 둘째, 개인과 조직의 편견과 오류를 최소화 할 수 있도록 인식의 영역을 검증범위에 포함하였으며, 다양한 프로젝트 정보를 문서화하여 검증을 강화하였다. 또한, 짧은 반복주기를 적용하여 결과의 검증이 아닌 과정상의 신속한 검증으로 검증의 결과가 실시간으로 현장에 적용되도록 하였으며, 측정 기준, 제약, 가정 등 당연하게 인식되던 사항들의 문서화를 통한 본질적인 재검증으로 관습과 관례의 오류를 검증하도록 하였다. 셋째, 현장 특성에 맞는 관리 핵심 도출에 따른 정보수집 최소화와 Cycle Time을 적용한 측정 및 분석의 단순화로 복잡한 관리시스템이 단순화 되었다. 넷째, 전통적인 P(Plan)→D(Do)→C(Check)→A(Action) 관리 Cycle을 계획의 적정성, 계획의 신뢰성, 지속적 검증을 핵심으로 하는 P(Plan)→DO(Documentation)→AC(Appropriate Check)→PD(Pilot Do)→TC(Trust Check)→CP(Change Plan)→D(Do)→C(Check)→A(Action)로 구체화하여 건설 현장 관리 Cycle로 제시하였다. 본 연구에서 제안한 FCMP 효과성과 효율성의 실증적 검증을 위해 비개착 굴착공사, 댐 공사, 터널 공사 현장에 적용하였다. 현장 적용 결과는 다음과 같다. 첫째, 당연하게 받아들이던 설계나 시공의 가정, 가설, 제약 등을 검증한 결과, 변경 가능하였다. 둘째, 세 현장 모두 신속한 반복검증이 가능한 작업 분류 체계가 수립되었으며, Cycle Time으로 측정과 분석이 단순화 되었다. 셋째, 오랜 경험을 가진 전문가의 인식도 객관적 검증의 절차가 필요함을 확인하였다. 넷째, FCMP를 적극적으로 수용한 2개 현장(댐공사, 터널공사)의 경우, 계획공기 준수(댐공사)와 11개월의 일정단축(터널공사)의 성과를 달성하였다. 본 연구는 지금까지 이루어진 공사관리 연구를 바탕으로 융복합, 단순화, 검증 강화라는 핵심가치를 제시하며 현장 실무자가 수행할 수 있는 공사관리 프로세스를 개발함으로써 토목 건설현장 공사관리에 새로운 방향을 제시하였다.

    연관 검색어 추천

    이 검색어로 많이 본 자료

    활용도 높은 자료

    해외이동버튼