http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
임남기 ( Lim¸ Nam-gi ) 한국건축시공학회 2021 한국건축시공학회 학술발표대회 논문집 Vol.21 No.2
As construction projects are gradually getting larger and focusing on building skyscraper with the development of construction technology and the concentration of population in cities, the choice of the soil sheeting works is very important in terms of securing safety and economic feasibility. Further research is planned on the developed concrete guide-based continuous over lap pile method through the introduction of a system that automates vertical management, continuous improvement and supplementation so that the basement soil sheeting wall can be utilized as a building structure.
임남기 ( Lim¸ Nam-gi ) 한국건축시공학회 2021 한국건축시공학회 학술발표대회 논문집 Vol.21 No.2
Even though the Al. form system, which was developed to replace the Euro-form, has been used as the slab lower formwork for almost all concrete structures based on the light weight and high conversion rate, the low-noise Drop method has been developed and used in order to overcome the limitations of the Al. Form system such as noise pollution and safety accidents caused by free fall during the demolding. However, as the low-noise drop method is still insufficient, Safety Full Drop Al. Form method is expected to be in the spotlight in the construction market based on its excellent advantages compared to the developed methods. In addition, we plan to conduct research to further contribute to securing the quality of the overall structure through continuous improvement and supplementation by introducing an automation system to the very construction method.