RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Quantum Bee Colony Optimization and Non-dominated Sorting Quantum Bee Colony Optimization Based Multi-relay Selection Scheme

        ( Qiang Ji ),( Shifeng Zhang ),( Haoguang Zhao ),( Tiankui Zhang ),( Jinlong Cao ) 한국인터넷정보학회 2017 KSII Transactions on Internet and Information Syst Vol.11 No.9

        In cooperative multi-relay networks, the relay nodes which are selected are very important to the system performance. How to choose the best cooperative relay nodes is an optimization problem. In this paper, multi-relay selection schemes which consider either single objective or multi-objective are proposed based on evolutionary algorithms. Firstly, the single objective optimization problems of multi-relay selection considering signal to noise ratio (SNR) or power efficiency maximization are solved based on the quantum bee colony optimization (QBCO). Then the multi-objective optimization problems of multi-relay selection considering SNR maximization and power consumption minimization (two contradictive objectives) or SNR maximization and power efficiency maximization (also two contradictive objectives) are solved based on non-dominated sorting quantum bee colony optimization (NSQBCO), which can obtain the Pareto front solutions considering two contradictive objectives simultaneously. Simulation results show that QBCO based multi-relay selection schemes have the ability to search global optimal solution compared with other multi-relay selection schemes in literature, while NSQBCO based multi-relay selection schemes can obtain the same Pareto front solutions as exhaustive search when the number of relays is not very large. When the number of relays is very large, exhaustive search cannot be used due to complexity but NSQBCO based multi-relay selection schemes can still be used to solve the problems. All simulation results demonstrate the effectiveness of the proposed schemes.

      • KCI등재

        Comparative Study of Exposure Assessment of Dust in Building Materials Enterprises Using ART and Monte Carlo

        Jiang Wei,Wu Zonghao,Zhang Mengqi,Zhang Haoguang 한국산업안전보건공단 산업안전보건연구원 2024 Safety and health at work Vol.15 No.1

        Background Dust generated during the processing of building materials enterprises can pose a serious health risk. The study aimed to compare and analyze the results of ART and the Monte Carlo model for the dust exposure assessment in building materials enterprises, to derive the application scope of the two models. Methods First, ART and the Monte Carlo model were used to assess the exposure to dust in each of the 15 building materials enterprises. Then, a comparative analysis of the exposure assessment results was conducted. Finally, the model factors were analyzed using correlation analysis and the scope of application of the models was determined. Results The results show that ART is mainly influenced by four factors, namely, localized controls, segregation, dispersion, surface contamination, and fugitive emissions, and applies to scenarios where the workplace information of the building materials enterprises is specific and the average dust concentration is greater than or equal to 1.5 mg/m3. The Monte Carlo model is mainly influenced by the dust concentration in the workplace of building materials enterprises and is suitable for scenarios where the dust concentration in the workplace of the building materials enterprises is relatively uniform and the average dust concentration is less than or equal to 6mg/m3. Conclusion ART is most accurate when workplace information is specific and average dust concentration is > 1.5 mg/m3; whereas, The Monte Carlo model is the best when dust concentration is homogeneous and average dust concentration is < 6 mg/m3. Background Dust generated during the processing of building materials enterprises can pose a serious health risk. The study aimed to compare and analyze the results of ART and the Monte Carlo model for the dust exposure assessment in building materials enterprises, to derive the application scope of the two models. Methods First, ART and the Monte Carlo model were used to assess the exposure to dust in each of the 15 building materials enterprises. Then, a comparative analysis of the exposure assessment results was conducted. Finally, the model factors were analyzed using correlation analysis and the scope of application of the models was determined. Results The results show that ART is mainly influenced by four factors, namely, localized controls, segregation, dispersion, surface contamination, and fugitive emissions, and applies to scenarios where the workplace information of the building materials enterprises is specific and the average dust concentration is greater than or equal to 1.5 mg/m3. The Monte Carlo model is mainly influenced by the dust concentration in the workplace of building materials enterprises and is suitable for scenarios where the dust concentration in the workplace of the building materials enterprises is relatively uniform and the average dust concentration is less than or equal to 6mg/m3. Conclusion ART is most accurate when workplace information is specific and average dust concentration is > 1.5 mg/m3; whereas, The Monte Carlo model is the best when dust concentration is homogeneous and average dust concentration is < 6 mg/m3.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼